| 期刊論文1. | Lu, S. C. H.、Ramaswamy, D.、Kumar, P. R.(1994)。Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants。IEEE Transactions on Semiconductor Manufacturing,7(3),374-388。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 2. | Johri, P. K.(1992)。Practical Issues in Scheduling and Dispatching in Semiconductor Wafer Fabrication。Journal of Manufacturing Systems,12(6),474-485。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 3. | Hackman, S. T.、Leachman, R. C.(1989)。A General Framework for Modeling Production。Management Science,35(4),478-495。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 4. | Jackson, J. R.(1963)。Jobshop-like queueing systems。Management Science,10,131-142。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 5. | Kumar, P. R.(1993)。Re-entrant lines。Queueing Systems,13,87-110。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 6. | 洪一峰、Leachman, R. C.(1996)。A Production Planning Methodology for Semiconductor Manufacturing Based on Iterative Simulation and Linear Programming Calculations。IEEE Transactions on Semiconductor Manufacturing,9(2),257-269。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 會議論文1. | Leachman, R. C.、Solorzano, M.、Glassey, C. R.(1990)。A queue management policy for the release of factory work orders。Texas, TX。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 學位論文1. | Hung, Y. F.(1991)。Corporate-Level Production Planning with Simulation Feedback of Parameters,Berkeley, CA。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 圖書1. | Anthorny, R. N.(1965)。Planning and Control Systems: A Framework for Analysis。Cambridge, MA:Harvard University Press。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 2. | Hax, C. H.、Candea, D.(1984)。Production and Inventory Management。Englewood Cliffs, NJ:Prentice-Hall。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 3. | Hiller, F. S.、Liberman, G. J.(1990)。Introduction to operations research。McGraw-Hill Publishing Company。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 4. | Johnson, Lynwood A.、Montgomery, Douglas C.(1974)。Operations Research in Production Planning, Scheduling, and Inventory Control。New York, NY:John Wiley & Sons, Inc.。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 5. | Leachman, R. C.(1993)。Modeling technique for automated production planning in the semiconductor industry。Optimization in Industry。Chichester, UK。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 6. | Murty, K. G.(1983)。Linear Programming。Linear Programming。England。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | |