題名:建築工程中機電設備施工排序之探討
書刊名:建築學報
作者:郭斯傑陳曉晴詹慕祖
作者(外文):Guo, Sy-jyeChen, Hsiao-chingChan, Mu-tzu
出版日期:2004
卷期:45
頁次:頁121-141
主題關鍵詞:建築工程機電設備施工排序Building constructionMechanical/electrical facilitiesConstruction sequencing
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(2) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:2
  • 共同引用共同引用:0
  • 點閱點閱:123
     機朧設備在建築工程裡扮演著舉足輕重之角色,因機電設備間、機電與土建工程間常有介面產生,若未事先經過完善之檢討與整合,會經常變更設計與拆除重做,而造成工期延宕、成本增加與品質不良的結果產生,因此,本研著著對機電工程特性與施工排序之研究達到(1)瞭解機電設備間、機電與土建工程間的施工介面關係;(2)瞭解機電工程設備與管路施工程序;(3)瞭解設備與管路中各細項構件施工排序邏輯;(4)機電工程與土建工程施工排序邏輯,期能在營建管理過程中提昇對機電工程介面控管之瞭解,提早發現問題之所在,降低變更設計發之頻率,提昇整體工程之品質。
     Mechanical/electrical facilities play important roles in building construction. Many interfaces exist among various mechanical/electrical facilities as well as among mechanical/electrical facilities and the building components. It these interfaces were not well integrated and solved, it will result in change orders, delay and cost overrun and the construction will then be compromised. This study focuses on the sequences of mechanical/electrical installation during the construction process and the topics are as follows: (1)The construction interfaces of mechanical/electrical construction and building construction. (2)The construction sequences of facilities and conduits. (3)The sequence logic of the components of the mechanical/electrical construction. (4)The sequence logic between mechanical/electrical construction and building construction. By means of investigation and analyses of sequences and interfaces of different phases of construction, problems will be detected early and be resolved efficiently. The goal is to achieve quality construction through effective construction management.
期刊論文
1.Hanna, A. S.、Russell, J. S.、Gotzion, T. W.、Nordheim, E. V.(1999)。Impact of change orders on labor efficiency for mechanical construction。Journal of Construction Engineering and Management,125(3),176-184。  new window
2.Hanna, A. S.、Russell, J. S.、Nordheim, E. V.、Bruggink, M. J.(1999)。Impact of change orders on labor efficiency for electrical construction。Journal of Construction Engineering and Management,125(4),224-232。  new window
3.Echeverry, D.、Ibbs, C. W.、Kim, S.(1991)。Sequencing knowledge for construction scheduling。Journal of Construction Engineering and Management,117(1),118-130。  new window
4.Kartam, N.、Levitt, R. E.(1990)。Intelligent planning of construction projects。J. Compute in Civ. Engrg.,4(2),155-175。  new window
5.Navinchandra, D.、Sriram, D.、Logcher, R. D.(1988)。GHOST: Project Network Generator。J. Compute in Civ. Engrg.,2(3),239-254。  new window
圖書
1.劉福勳(1994)。營建管理概論。營建管理概論。臺北。  延伸查詢new window
2.李政憲(1995)。高層級和住宅建築與設備介面之整合。高層級和住宅建築與設備介面之整合。臺北。  延伸查詢new window
3.陳啟中(2000)。建築設備概論。建築設備概論。臺北。  延伸查詢new window
4.(2003)。建築技術規則。建築技術規則。臺北。  延伸查詢new window
5.林耀煌(1995)。營建工程施工規劃與管理控制。營建工程施工規劃與管理控制。臺北。  延伸查詢new window
6.莊嘉文(1991)。建築設備概論。建築設備概論。臺北。  延伸查詢new window
7.O'Brien, J. J.、Plotnick, F. L.(1994)。CPM in construction management。CPM in construction management。New York, NY。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top
QR Code
QRCODE