:::

詳目顯示

回上一頁
題名:On Determining the Optimal Maintenance Frequency for a Family of Machines
書刊名:工業工程學刊
作者:姚銘忠 引用關係
作者(外文):Yao, Ming-jong
出版日期:2005
卷期:22:3
頁次:頁199-209
主題關鍵詞:維修管理群組設備維修排程最佳解結構搜尋演算法A family of machinesMaintenanceSchedulingSearch algorithm
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(0) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:0
  • 共同引用共同引用:0
  • 點閱點閱:18
期刊論文
1.Elmaghraby, S. E.(1978)。The Economic Lot Scheduling Problem (ELSP): Review and Extension。Management Science,24,587-597。  new window
2.Chan, M. Y.、Chin, Francis(1992)。General Schedulers for the Pinwheel Problem Based on Double-Integer Reduction。IEEE Transactions on Computers,41(6),755-768。  new window
3.Holte, Robert、Rosier, Louis、Tulchinsky, Igor、Varel, Donald(1992)。Pinwheel Scheduling with Two Distinct Numbers。Theoretical Computer Science,100(1),105-135。  new window
4.Glass, C. A.(1992)。Feasibility of scheduling lot sizes of three products on one machine。Management Science,38(10),1482-1494。  new window
5.Bar-Noy, Amotz、Bhatia, Randeep、Naor, Joseph、Schieber, Baruch(2002)。Minimizing Service and Operation Costs of Periodic Scheduling。Mathematics of Operations Research,27(3),518-544。  new window
6.Anily, Shoshana、Glass, Celia A.、Hassin, Refael(1998)。The Scheduling of Maintenance Service。Discrete Applied Mathematics,82(1-3),27-42。  new window
7.Anily, Shoshana、Glass, Celia A.、Hassin, Refael(1999)。Scheduling Maintenance Services to Three Machines。Annals of Operations Research,86,375-391。  new window
8.Chan, M. Y.、Chin, Francis(1993)。Schedulers for Larger Classes of Pinwheel Instances。Algorithmica,9(5),425-462。  new window
9.Cho, Danny I.、Parlar, Mahmut(1991)。A Survey of Maintenance Models for Multi-Unit Systems。European Journal of Operational Research,51(1),1-23。  new window
10.Christer, A. H.、Doherty, T.(1977)。Scheduling Overhauls of Soaking Pits。Operational Research Quarterly,28(4),915-926。  new window
11.Van Der Duyn Schouten, Frank A.、Wildeman, Ralph E.、Dekker, Rommert(1997)。A Review of Multi-component Maintenance Models with Economic Dependence。Mathematical Methods of Operations Research,45(3),411-435。  new window
12.Fung, R. Y. K.、Ma, X.(2001)。A New Method for Joint Replenishment Problems。The Journal of the Operational Research Society,52(3),358-362。  new window
13.Glass, Celia A.(1994)。Feasibility of Scheduling Lot Sizes of Two Frequencies on One Machine。European Journal of Operational Research,75(2),354-364。  new window
14.Goyal, S. K.、Gunasekaran, A.(1992)。Determining Economic Maintenance Frequency of a Transport Fleet。International Journal of Systems Science,23(4),655-659。  new window
15.Goyal, S. K.、Kusy, M. I.(1985)。Determining Economic Maintenance Frequency for a Family of Machines。Journal of the Operational Research Society,36(12),1125-1128。  new window
16.Goyal, Suresh K.、Satir, Ahmet T.(1989)。Joint Replenishment Inventory Control: Deterministic and Stochastic Models。European Journal of Operational Research,38(1),2-13。  new window
17.Hassin, Refael、Megiddo, Nimrod(1991)。Exact Computation of Optimal Inventory Policies over an Unbounded Horizon。Mathematics of Operations Research,16(3),534-546。  new window
18.Krämer, Franz-Josef、Bai, Sherman X.(1996)。Optimal Control of a Production System with Periodic Maintenance。Optimal Control Applications and Methods,17(4),281-307。  new window
19.Lee, Fang-Chuan、姚銘忠(2003)。On the Joint Replenishment Problem under Power-of-Two Policy。Computers & Operations Research,30,1319-1333。  new window
20.Luss, Hanan(1976)。Maintenance Policies When Deterioration Can Be Observed by Inspections。Operations Research,24(2),359-366。  new window
21.Luss, Hanan、Kander, Zvi(1974)。A Preparedness Model Dealing with N Systems Operating Simultaneously。Operations Research,22(1),117-128。  new window
22.Su, Chi-Jiun、Tassiulas, Leandros(1997)。Broadcast Scheduling for Information Distribution。Proceedings of the INFOCOM '97. Sixteenth Annual Joint Conference of the IEEE Computer and Communications Societies. Driving the Information Revolution,109-117。  new window
23.Sule, Dileep R.、Harmon, Bryan(1979)。Determination of Coordinated Maintenance Scheduling Frequencies for a Group of Machines。AIIE Transactions,11(1),48-53。  new window
24.Van Eijs, M. J. G.(1993)。A Note on the Joint Replenishment Problem under Constant Demand。The Journal of the Operational Research Society,44(2),185-191。  new window
25.Viswanathan, S.(1996)。A New Optimal Algorithm for the Joint Replenishment Problem。The Journal of the Operational Research Society,47(7),936-944。  new window
26.Viswanathan, S.(2002)。On Optimal Algorithms for the Joint Replenishment Problem。The Journal of the Operational Research Society,53(11),1286-1290。  new window
圖書
1.Bazaraa, M. S.、Sherali, H. D.、Shetty, C. M.(1993)。Nonlinear Programming: Theory and Algorithms。New York, NY:John Wiley & Sons, Inc.。  new window
2.Pardalos, P. M.、Horst, R.(1995)。Handbook of Global Optimization。Dordrecht, Netherlands:Klurwer Academic Publishers。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top
QR Code
QRCODE