:::

詳目顯示

回上一頁
題名:建構一個消除瓶頸漂移的生產規劃與控制系統
書刊名:明新學報
作者:黃承龍 引用關係張盛鴻 引用關係
作者(外文):Huang, Cheng-lungChang, Sheng-hung
出版日期:1997
卷期:19
頁次:頁27-40
主題關鍵詞:限制理論瓶頸漂移Theory of constraintsDrum-buffer-ropeBottleneck shifting
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(0) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:0
  • 共同引用共同引用:7
  • 點閱點閱:18
期刊論文
1.Schragenheim, E.、Ronen, B.(1990)。Drum-buffer-rope shop floor control。Production and Inventory Management Journal,31(3),18-22。  new window
2.Ronen, Boaz、Starr, Martin K.(1990)。Synchronized manufacturing as in OPT: from practice to theory。Computers & Industrial Engineering,18,585-600。  new window
3.吳鴻輝、李榮貴(19970400)。生產排程之重排程決策問題的文獻探討與分析。工業工程學刊,14(2),147-158。new window  延伸查詢new window
4.Fredendall, L. D.、Lea, B. R.(1997)。Improving the product mix heuristic in the theory of constraints。International Journal of Production Research,35(6),1535-1544。  new window
5.Buxy, G.(1989)。Production scheduling: practice and theory。European Journal of Operational Research,39,17-31。  new window
6.吳鴻輝、李榮貴(19950100)。Capacity Constraint Resource Wandering and its Wandering Behaviors in a Production Plant。工業工程學刊,12(1),63-69。new window  new window
7.Chang, S.-H.、Feng, I.-M.、Huang, C.-L.、Chen, W.-Y.、Li, R.-K.(1997)。A hybrid dispatching system for a wafer fab。International Journal of Production Research。  new window
8.Karmarker, U. S.、Kekre, S.(1985)。Lotsizing in multi-item, multi-machine job shops。IIE Transactions,17(3),290-298。  new window
9.Jacobs, F. R.、Bragg, D. J.(1988)。Repetitive lots: flow-time reduction through sequencing and dynamic batch sizing。Decision Sciences,19,281-294。  new window
10.Huang, C.-L.、Chen, K.-L.、Chang, S.-H.、Li, Rong-Kwei(1997)。An order releasing method to avert bottleneck shifting in a wafer fab。International Journal of Production Research。  new window
11.Russell, G. R.、Fry, T. D.(1997)。Order review/release and lot splitting in drum-buffer-rope。International Journal of Production Research,35(3),827-845。  new window
12.Ronen, B.(1992)。Managing system constraints: a cost/utilization approach。International Journal of Production Research,30(9),2045-2061。  new window
13.Patterson, M. C.(1992)。The product-mix decision: a comparison of theory of constraints and labor-based management accounting。Production and Inventory Management Journal,33(3),80-85。  new window
14.Sridharan, V.、William, L. B.、Udayabhanu, V.(1992)。Freezing the master production schedule under rolling planning horizon。Management Science,33,1137-1149。  new window
15.Simons, J. V.(1996)。Formulation and solution of the drum-buffer-rope constraint scheduling problem。International Journal of Production Research,34(9),2405-2420。  new window
16.張盛鴻、馮鈺敏、黃承龍、洪錦輝、李榮貴(1997)。以限制理論為基礎之晶圓廠派工法則。工業工程學刊。new window  延伸查詢new window
17.Buss, A. H.、Lawrence, S. R.(1994)。Shifting production bottlenecks: causes, cures, and conundrums。Production and Operations Management,3(1),21-37。  new window
18.Colvenaer, D. D.、Maes, J.、Gelders, L.(1992)。Application of TOC/ OPT Rules in a Medium Sized Shop。Production Planning & Control,3,413-421。  new window
學位論文
1.周興坪(1996)。晶圓製造廠細部排程規劃模組之規劃(碩士論文)。國立交通大學。  延伸查詢new window
圖書
1.Goldratt, E. M.(1990)。Theory of Constraints。North River Press。  new window
2.Goldratt, E. M.、Fox, R. E.(1986)。The Race。North River Press。  new window
3.Jones, G.、Roberts, M.(1990)。Optimized Production Technology。IFS Publication。  new window
4.Goldratt, E. M.(1996)。Production The TOC Way: Work Book。North River Press。  new window
5.Umble, M. M.、Srikanth, M. L.(1990)。Synchronous manufacturing: principle for world class excellence。Cincinnati, OH:South-Western Publishing。  new window
6.Schragenheim, E.(1991)。Flow for the four-day information systems course, Manual。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top