期刊論文1. | Gates, M.、Scarpa, A.(1978)。Optimum number of crews。Journal of the Construction Division,104(2),123-132。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
2. | Russell, Jeffrey S.、Swiggum, K. E.、Shapiro, J. M.、Alaydrus, A. F.(1994)。Constructability Related to TQM, Value Engineering, and Cost/Benefits。Journal of Performance of Constructed Facilities,8(1),31-45。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
3. | 劉慶尚、沈修文(19920600)。價值工程與臺北都會區大眾捷運系統。營建管理季刊,11,54-62。 延伸查詢![new window](/gs32/images/newin.png) |
4. | 陳宗男(19971200)。價值工程之認識。營建管理季刊,33,35-43。 延伸查詢![new window](/gs32/images/newin.png) |
5. | Al-Hammad, A.、Hassanain, M. A.(1996)。Value Engineering in the Assessment of Exterior Building Wall Systems。Journal of Architectural Engineering,2(3),115-119。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
6. | Alhazmi, T.、McCaffer, R.(2000)。Project Procurement System Selection Model。Journal of Construction Engineering and Management,126(3),176-184。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
7. | Ganga Rao, H. V. S.、Ward, R.、Howser, V.(1988)。Value Engineering Approach to Low-Volume Road Bridge Selection。Journal of Structure Engineering,114(9),1962-1977。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
8. | Gates, M.、Scarpa, A.(1980)。Criteria for the Selection of Construction Equipment。Journal of the Construction Division,106(2),207-219。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
9. | Handa, V. K.、Georiades, I. F.(1980)。Construction Project Selection and Bernoulli Utility。Journal of the Construction Division,106(3),355-370。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
10. | Kaden, R. A.(1993)。Use Value Engineering Concepts for Spaceport Launching。Journal of Aerospace Engineering,6(2),133-147。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
11. | Kumaraswamy, M. M.、Matthews, J. D.(2000)。Improved Subcontractor Selection Employing Partnering Principles。Journal of Management in Engineering,16(3),47-57。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
12. | Maevis, A. C.(1980)。Construction Cost control by the Owner。Journal of the Construction Division,106(4),435-446。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
13. | Omigbodun, A.(2001)。Value Engineering and Optimal Building Projects。Journal of Architectural Engineering,7(2),40-43。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
14. | Ottoman, G. R.、Nixon, W. B.、Lofgren, S. T.(1999)。Budgeting for Facility Maintenance and Repair, I: Methods and Models。Journal of Management in Engineering,15(4),71-83。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
15. | 李魁士、劉慶豐(20000900)。淺談深開挖工程規劃設計之地工考量。現代營建,21(9)=249,31-36。 延伸查詢![new window](/gs32/images/newin.png) |
16. | Ottoman, G. R.、Nixon, W. B.、Chan, Y.(1999)。Budgeting for Facility Maintenance and Repair, II: Multi-Criteria Process for Model Selection。Journal of Management in Engineering,15(4),84-95。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
17. | Sarma, K. C.、Adeli, H.(1998)。Cost Optimization of Concrete Structures。Journal of Structure Engineering,124(5),570-579。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
18. | 李魁士、劉慶豐(20001000)。淺談深開挖工程規劃設計之地工考量。現代營建,21(10)=250,23-30。 延伸查詢![new window](/gs32/images/newin.png) |
19. | Bedian, M. P.(2002)。Value Engineering and its Rewards。Leadership and Management in Engineering,2(2),36-37。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
20. | Acharya, P.、Pfrommer, C.、Ziybel, C.(1995)。Think Value Engineering。Journal of Management in Engineering,11(6),13-17。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
21. | Arditi, D.、Messiha, H. M.(1999)。Life Cycle Cost Analysis (LC91CA) in Municipal Organization。Journal of Infrastructure Systems,5(1),1-10。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
22. | Hensey, M.(1986)。Strategic Planning: Its Purpose, Value and Methods。Journal of Management in Engineering,2(4),213-221。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
23. | Jaafari, A.(1988)。Project Viability and Economic Risk Analysis。Journal of Management in Engineering,4(1),29-45。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
24. | Lund, J. R.(1992)。Benefit-Cost Ratios: Failures and Alternatives。Journal of Water Resources Planning and Management,118(1),94-100。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
25. | Pregenzer, L. J.、Seppanen, P. J.、Kunz, J. C.、Paulson, B. C.(1999)。Value-Added Assessment of Construction plans。Journal of Construction Engineering and Management,125(4),242-248。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
26. | Vergara, A. J.、Boyer, L. T.(1974)。Probabilistic Approach to Estimating and Cost Control。Journal of the Construction Division,100(4),543-552。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |