:::

詳目顯示

回上一頁
題名:A Global-Optimization Algorithm for Solving the Maintenance Scheduling Problem for a Family of Machines
書刊名:International Journal of Information and Management Sciences
作者:yao, ming-jong 引用關係Huang, Jia-yen
出版日期:2007
卷期:18:4
頁次:頁365-386
主題關鍵詞:A family of machinesMaintenanceSchedulingLipschitzGlobal optimization
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(3) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:3
  • 共同引用共同引用:0
  • 點閱點閱:37
In this study, we propose a new solution approach for solving the Maintenance Scheduling Problem for a Family of Machines (MSPFM). After reviewing the literature, we found that Goyal and Kusy’s paper presented the only model that used a nonlinear function for the cost of operating a machine when studying the periodic maintenance scheduling problems. In our presentation of this paper, we first review Goyal and Kusy’s mathematical model and their heuristic for solving the MSPFM. By analyzing the mathematical model, we show that the objective function of the MSPFM is Lipschitz. Therefore, we propose to solve the MSPFM using a Lipschitz optimization algorithm with a dynamic Lipschitz constant. Based on our random experiments, we conclude that the proposed dynamic Lipschitz optimization algorithm out-performs Goyal and Kusy’s heuristic.
期刊論文
1.Elmaghraby, S. E.(1978)。The Economic Lot Scheduling Problem (ELSP): Review and Extension。Management Science,24,587-597。  new window
2.Van Eijs, M. J. G.(1993)。A Note on the Joint Replenishment Problem under Constant Demand。Journal of the Operational Research Society,44,185-191。  new window
3.Chen, Miao-sheng、Lan, Chun-hsiung(20010600)。Two-stage Production with Unreliable Machine and Finite Working Hour Capacity。International Journal of Information and Management Sciences,12(2),11-24。  new window
4.Lee, Fang-Chuan、姚銘忠(2003)。On the Joint Replenishment Problem under Power-of-Two Policy。Computers & Operations Research,30,1319-1333。  new window
5.Goyal, S. K.、Satir, A. T.(1989)。Joint Replenishment Inventory Control: Deterministic and Stochastic Models。European Journal of Operational Research,38,2-13。  new window
6.Fung, R. Y. K.、Ma, X.(2001)。A New Method for Joint Replenishment Problems。Journal of the Operational Research Society,52,358-362。  new window
7.Viswanathan, S.(1996)。A New Optimal Algorithm for the Joint Replenishment Problem。Journal of the Operational Research Society,47,936-944。  new window
8.Dekker, R.、Wildeman, R.、Van Der Duyn Schouten, F.(1997)。A Review of Multi-component Maintenance Models with Economic Dependence。Mathematical Methods of Operations Research,45,411-435。  new window
9.Cho, D. I.、Parlar, M.(1991)。A Survey of Maintenance Models for Multi-unit Systems。European Journal of Operational Research,51,1-23。  new window
10.Sule, D. R.、Harmon, B.(1979)。Determination of Coordinated Maintenance Scheduling Frequencies for a Group of Machines。AIIE Transactions,11,48-53。  new window
11.Goyal, S. K.、Kusy, M. I.(1985)。Determining Economic Maintenance Frequency for a Family of Machines。Journal of the Operational Research Society,36,1125-1128。  new window
12.Goyal, S. K.、Gunasekaran, A.(1992)。Determining Economic Maintenance Frequency of a Transportation Fleet。International Journal of Systems Science,23,655-659。  new window
13.林麗嬌、侯國隆(2005)。EMQ Model with Maintenance Actions for Deteriorating Production System。International Journal of Information and Management Sciences,16(1),53-65。  new window
14.Hassin, R.、Megiddo, N.(1991)。Exact Computation of Optimal Inventory Policy over an Unbounded Horizon。Mathematics of Operations Research,16,534-546。  new window
15.Glass, C. A.(1992)。Feasibility of Scheduling Lot Sizes of Three Products on One Machine。Management Science,38,1482-1494。  new window
16.Glass, C. A.(1994)。Feasibility of Scheduling Lot Sizes of Two Frequencies on One Machine。European Journal of Operational Research,75,354-364。  new window
17.Chan, M. Y.、Chin, F.(1992)。General Schedulers for the Pinwheel Problem Based on Double-integer Reduction。IEEE Transactions on Computers,41,755-768。  new window
18.Luss, H.(1976)。Maintenance Policies When Deterioration Can be Observed by Inspections。Operations Research,24,359-366。  new window
19.Amotz, B. N.、Bhatia, R.、Naor, J.、Schieber, B.(2002)。Minimizing Service and Operation Costs of Periodic Scheduling。Mathematics of Operations Research,27,518-544。  new window
20.Viswanathan, S.(2002)。On Optimal Algorithms for the Joint Replenishment Problem。Journal of the Operational Research Society,53,1286-1290。  new window
21.Kramer, F. J.、Bai, S. X.(1996)。Optimal Control of a Production System with Periodic Maintenance。Optimal Control Applications and Methods,17,281-307。  new window
22.Holte, R.、Rosier, Z.、Tulchinsky, I.、Varvel, D.(1992)。Pinwheel Scheduling with Two Distinct Numbers。Theoretical Computer Science,100,105-135。  new window
23.Luss, H.、Kander, Z.(1974)。Preparedness Model Dealing with N Systems Operating Simultaneously。Operations Research,22,117-128。  new window
24.Chan, M. Y.、Chin, F.(1993)。Schedulers for Larger Classes of Pinwheel Instances。Algorithmica,9,425-462。  new window
25.Anily, S.、Glass, C. A.、Hassin, R.(1999)。Scheduling of Maintenance Services to Three Machines。Annals of Operations Research,86,375-391。  new window
26.Christer, A. H.、Doherty, T.(1977)。Scheduling Overhauls of Soaking Pits。Operational Research Quarterly,28,915-926。  new window
27.Anily, S.、Glass, C. A.、Hassin, R.(1998)。The Scheduling of Maintenance Service。Discrete Applied Mathematics,82,27-42。  new window
會議論文
1.Su, C.、Tassiulas, L.(1997)。Broadcast Scheduling for Information Distribution。0。109-117。  new window
圖書
1.Bazaraa, M. S.、Sherali, H. D.、Shetty, C. M.(1993)。Nonlinear Programming: Theory and Algorithms。New York, NY:John Wiley & Sons, Inc.。  new window
2.Pardalos, P. M.、Horst, R.(1995)。Handbook of Global Optimization。Dordrecht, Netherlands:Klurwer Academic Publishers。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top
QR Code
QRCODE