期刊論文1. | Zack, J. G.(2001)。But-for schedules-analysis and defense。Cost Engineering,43(8),13-17。 |
2. | Arditi, D.、Pattanalitchamroon, T.(2006)。Selecting a delay analysis method in resolving construction claims。International Journal of Project Management,24(2),145-155。 |
3. | Bordoli, D. W.、Baldwin, A. N.(1998)。A methodology for assessing construction project delays。Construction Management and Economic,16,327-227。 |
4. | Harris, R. A.、Scott, S.(2001)。UK practice in dealing with claims for delay。Eng Constr Architect Manage,8(5/6),317-324。 |
5. | Kartam, S.(1999)。Generic Methodology for Analyzing Delay Claim。Journal of Construction Engineering and Management,125(6),409-419。 |
6. | Kumaraswamya, M. M.、Yogeswaran, K.(2003)。Substantiation and assessment of claims for extensions of time。International Journal of Project Management,21,27-38。 |
7. | Yates, J. K.、Epstein, A.(2006)。Avoiding and Minimizing Construction Delay Claim Disputes in Relational Contracting。Journal of Professional Issues in Engineering Education and Practice,132(2)。 |
學位論文1. | 陳恩澤(2005)。工程專案展期與管理費給付之研究(碩士論文)。國立高雄第一科技大學。 延伸查詢 |
2. | 吳賀琮(2003)。工程管理資訊在爭議索賠處理上之應用(碩士論文)。國立臺灣科技大學。 延伸查詢 |
3. | 李怡瑤(2007)。時程延遲分析技術改進與實作(碩士論文)。中華大學。 延伸查詢 |
4. | 李銘竣(2002)。演化式案例推理在營建工程履約爭議處理之研究(碩士論文)。國立臺灣科技大學。 延伸查詢 |
5. | 陳建安(2005)。擬制變更於工程爭議適用之探討(碩士論文)。逢甲大學。 延伸查詢 |
6. | 余文恭(2006)。兩岸工程施工契約之比較研究---以竣工義務及協力行為為中心(碩士論文)。東吳大學。 延伸查詢 |
7. | 吳庭珺(2006)。工程爭議導向之專案文件管理雛型系統(碩士論文)。國立中央大學。 延伸查詢 |
8. | 林坤南(2006)。公共工程逾期罰款判決態樣之分析與應用(碩士論文)。國立中央大學。 延伸查詢 |
9. | 戚淑芳(2005)。工程爭議之有效管理(碩士論文)。國立成功大學。 延伸查詢 |
10. | 郭麗華(2005)。工程間接費用索賠計算方法之比較(碩士論文)。國立成功大學。 延伸查詢 |
11. | 陳英本(2005)。承包商因工期展延衍生工程成本之探討(碩士論文)。國立中央大學。 延伸查詢 |
12. | 劉智遠(2005)。公共工程進度計算方式之認定研究(碩士論文)。國立中央大學。 延伸查詢 |
13. | 蔡英聖(2001)。公共工程履約爭議處理資訊輔助系統之研究-以爭議調解為例(碩士論文)。國立臺灣大學。 延伸查詢 |
14. | 陳玉潔(2005)。工程契約變更之爭議問題(碩士論文)。國立政治大學。 延伸查詢 |
15. | 吳翔文(2007)。工程遲延相關爭議問題研究(碩士論文)。國立臺北大學。 延伸查詢 |