| 期刊論文1. | Konz, S.(1998)。Work/rest: Part I--Guidelines for the practitioner。International Journal of Industrial Ergonomics,22(1/2),67-71。 | 2. | Abdelhamid, T. S.、Everett, J. G.(1999)。Physiological Demands of Concrete SlabPlacing and Finishing Work。Journal of Construction Engineering and Management,125(1),47-52。 | 3. | Wu, H. C.、Wang, M. J. J.(2001)。Determining the maximum acceptable work duration for high-intensity work。European Journal of Applied Physiology,85,339-344。 | 4. | Beynon, C.、Burke, J.、Doran, D.、Nevill A.(2000)。Effects of activity-rest schedules on physiological strain and spinal load in hospital-based porters。Ergonomics,43(10),1763-1770。 | 5. | Dababneh, A. J.、Swanson, N.、Shell, R. L.(2001)。Impact of added rest breaks on the productivity and well being of workers。Ergonomics,44(2),164-174。 | 6. | Abdelhamid, T. S.、Everett, J. G.(2002)。Physiological Demands during Construction Work。Journal of Construction Engineering and Management,128(5),427-437。 | 7. | Jackson, A. S.、Ross, R. M.(1996)。Methods and limitations of assessing functional work capacity objectively。Journal of Back and Musculoskeletal Rehabilitation,6,265-276。 | 8. | Bink, B.(1962)。The Physical Working Capacity in Relation to Working Time and Age。Ergonomics,5,25-28。 | 9. | Konz, S.(1998)。Work/rest: Part II--The scientific basis (knowledge base) for The guide。International Journal of Industrial Ergonomics,22,73-99。 | 10. | Saha, P. N.、Datta, S. R.、Banerjee, P. K.、Narayane, G. G.(1979)。An acceptable workload for Indian workers。Ergonomics,22,1059-1071。 | 11. | Boucsein, W.、Thum, M.(1997)。Design of Work/rest Schedules for Computer Work Based on Psychophysiological Recovery Measures。International Journal of Industrial Ergonomics,20,51-57。 | 研究報告1. | 李正隆(1998)。房屋建築業勞工肌肉骨骼傷害問題調查研究 (計畫編號:IOSH86-H328)。台北。 延伸查詢 | 圖書1. | Astrand, P. O.、Rodahl, K.、Dahl, H. A.、Strømme, S. B.(2003)。Textbook of Work Physiology: Physiological Bases of Exercise。Human Kinetics。 | 2. | Gen, Mitsuo、Cheng, Runwei(1997)。Genetic Algorithms and Engineering Design。John Wiley & Sons。 | 3. | Murrell, K. F. H.(1965)。Human performance in industry。New York:Reinhold。 | 4. | 鄭道明(2001)。營建操作電腦模擬--理論與實務。台中:朝陽科技大學。 延伸查詢 | |