:::

詳目顯示

回上一頁
題名:Parallel Machines Scheduling with Rate-modifying Activities and Total Absolute Differences Penalties
書刊名:International Journal of Information and Management Sciences
作者:Wu, Yu-bin
出版日期:2011
卷期:22:4
頁次:頁407-418
主題關鍵詞:SchedulingIdentical parallel machinesRate-modifying activitiesPolynomial algorithm
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(1) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:1
  • 共同引用共同引用:4
  • 點閱點閱:30
Abstract In this paper we consider identical parallel machines scheduling problems with rate-modifying activities. In this model, each machine has a rate-modifying activity that can change the processing rate of machine under consideration. Hence the actual processing times of jobs vary depending on whether the job is scheduled before or after the rate-modifying activity. We need to make a decision on when to schedule the rate-modifying activities and the sequence of jobs to minimize some objective function. We concentrate on two goals separately, namely, minimizing the total absolute differences in completion times (TADC) and the total absolute differences in waiting times (TADW). We show that the problems remain polynomially solvable under the proposed model.
期刊論文
1.Yang, Suh-jenq、Hsu, Chou-jung、Yang, Dar-li(20100600)。Single-Machine Scheduling with Due-Date Assignment and Aging Effect under a Deteriorating Maintenance Activity Consideration。International Journal of Information and Management Sciences,21(2),177-195。new window  new window
2.Chen, Jen-shiang、Yang, Jin-shan(20070900)。Alternative Models for Solving Single-Machine Scheduling with Tool Changes。International Journal of Information and Management Sciences,18:3,頁283-297。new window  new window
3.Chen, Wen-jinn、Tsou, Jia-chi(20081200)。Sequencing Heuristic for Scheduling Jobs with Periodic Maintenance。International Journal of Information and Management Sciences,19:4,頁635-649。new window  new window
4.Yao, Ming-jong、Huang, Jia-yen(20071200)。A Global-Optimization Algorithm for Solving the Maintenance Scheduling Problem for a Family of Machines。International Journal of Information and Management Sciences,18:4,頁365-386。new window  new window
5.Bagchi, U.B.(1989)。Simultaneous minimization of mean and variation of flow-time and waiting time in single machine systems。Operations Research,37,118-125。  new window
6.Wang, J.-B.、Wang, J.-J.、Ji, P.(2011)。Scheduling jobs with chain precedence constraints and deteriorating jobs。Journal of the Operational Research Society,62,1765-1770。  new window
7.Lee, C.-Y.、Leon, V.-J.(2001)。Machine scheduling with a rate-modifying activity。European Journal of Operational Research,128,119-128。  new window
8.Vani, V.、Raghavachari, R.(1987)。Deterministic and random single machine sequencing with variance minimization。Operations research,35,111-120。  new window
9.Mosheiov, G.(2001)。Parallel machine scheduling with a learning effect。Journal of the Operational Research Society,52,1165-1169。  new window
10.Wang, J.-B.、Wang, M.-Z.(201201)。Single-machine scheduling with nonlinear deterioration。Optimization Letters,6(1),87-98。  new window
11.Kanet, J. J.(1981)。Minimizing variation of flow time in single machine systems。Management Science,27,1453-1459。  new window
12.Graham, R. L.、Lawler, E. L.、Lenstra, J. K.、Rinnooy Kan, A. H. G.(1979)。Optimization and Approximation in Deterministic Sequencing and Scheduling: A Survey。Annals of Discrete Mathematics,5,287-326。  new window
13.Alidaee, B.、Conlon, S.(1997)。A note on the bicriterion scheduling problem involving total flowtime and range of lateness。International Journal of Information and Management Sciences,8,1-8。  new window
14.Eilon, S.、Chowdhury, I. E.(1977)。Minimizing waiting time variance in the single machine problem。Management Science,23,567-575。  new window
15.Gordon, V. S.、Tarasevich, A. A.(2009)。A note: Common due date assignment for a single machine scheduling with the rate-modifying activity。Computers & Operations Research,36,325-328。  new window
16.Graves, G. H.、Lee, C.-Y.(1999)。Scheduling maintenance and semiresumable jobs on a single machine。Naval Research Logistics,46,845-863。  new window
17.Lee, C.-Y.、Chen, Z.-L.(2000)。Scheduling of jobs and maintenance activities on parallel machine。Naval Research Logistics,47,145-165。  new window
18.Lee, C.-Y.、Lin, C.-S.(2001)。Single-machine scheduling with maintenance and repair rate-modifying activity。European Journal of Operational Research,135,493-513。  new window
19.Merten, A. G.、Muller, M. E.(1972)。Variance minimization in single machine sequencing problems。Management Science,18,518-528。  new window
20.Mosheiov, G.(2008)。Minimizing total absolute deviation of job completion times: extensions to position-dependent processing times and parallel identical machines。Journal of the Operational Research Society,59,1422-1424。  new window
21.Mosheiov, G.、Oron, D.(2006)。Due-date assignment and maintenance activity scheduling problem。Mathematical and Computer Modelling,44,1053-1057。  new window
22.Mosheiov, G.、Sidney, J. B.(2004)。New results on sequencing with rate modification。INFOR,41,155-163。  new window
23.Murugesan, R.、Thamarai Selvi, S.、Alphonse Rajendran, P.、Sampath Kumar, V. S.(2003)。Identification of a rank minimal optimal sequence for open shop scheduling problems。International Journal of Information and Management Sciences,14,37-55。  new window
24.Pang, K.-C.(1995)。Algorithmic analysis of the unrelated parallel machines scheduling problem to minmize mean weigted flowtime。International Journal of Information and Management Sciences,6,47-71。  new window
25.Qi, X.、Chen, T.、Tu, F.(1999)。Scheduling the maintenance on a single machines。Journal of Operational Research Society,50,1071-1078。  new window
26.Schrage, L.(1975)。Minimizing the time-in-system variance for a finite jobset。Management Science,21,540-543。  new window
27.Wang, J-B.(2010)。Single-machine scheduling with a sum-of-actual-processing-time-based learning effect。Journal of the Operational Research Society,61,172-177。  new window
28.Wang, J.-B.、Wang M.-Z.(2011)。Worst-case behavior of simple sequencing rules in flow shop scheduling with general position-dependent learning effects。Annals of Operations Research,191,155-169。  new window
29.Wang, J.-B.、Wang M.-Z.(2012)。Single-machine scheduling to minimize total convex resource consumption with a constraint on total weighted flow time。Computers & Operations Research,39,492-497。  new window
30.Wang, J.-B.、Wei, C.-M.(2010)。Parallel machine scheduling with a deteriorating maintenance activity and total absolute differences penalties。Applied Mathematics and Computation,217,8093-8099。  new window
31.Wang, J.-B.、Xia, Z.-Q.(2007)。Single machine scheduling problems with controllable processing times and total absolute differences penalties。European Journal of Operational Research,177,638-645。  new window
32.Zhao, C.-L.、Tang, H.-Y.(2010)。Single machine scheduling with general job-dependent aging effect and maintenance activities to minimize makespan。Applied Mathematical Modelling,34,837-841。  new window
33.Zhao, C.-L.、Tang, H.-Y.、Cheng, C.-D.(2009)。Two-parallel machines scheduling with rate-modifying activities to minimize total completion time。European Journal of Operational Research,198,354-357。  new window
學位論文
1.Whitaker, L. O.(1996)。Integrated production and maintenance activities。Texas A&M University,College Station, TX。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top
:::
無相關博士論文
 
無相關書籍
 
無相關著作
 
QR Code
QRCODE