期刊論文1. | Bent, R. W.、Hentenryck, P. V.(2004)。Scenario-Based Planning for Partially Dynamic Vehicle Routing with Stochastic Customers。Operations Research,52(6),977-987。 |
2. | Azia, N.、Gendreaua, M.、Potvin, J. Y.(2007)。An Exact Algorithm for a Single-vehicle Routing Problem with Time Windows and Multiple Routes。European Journal of Operational Research,178(3),755-766。 |
3. | Young, H. F.、Yan, S.(1996)。A Decision Support Framework for Multi-fleet Routing and Multi-stop Flight Scheduling。Transportation Research Part A: Policy and Practice,30(5),379-398。 |
4. | Hsu, C. I.、Hung, S. F.、Li, H. C.(2007)。Vehicle Routing Problem with Time-windows for Perishable Food Delivery。Journal of Food Engineering,80(2),465-475。 |
5. | Yan, S.、Chen, H.(2002)。A Scheduling Model and a Solution Algorithm for Inter-City Bus Carriers。Transportation Research Part A: Policy and Practice,36(9),805-825。 |
6. | 顏上堯、簡德和、陳俊穎(20060400)。開發區域內土方工程最佳調派決策模式之研究。臺灣公共工程學刊,1(2),1-14。 延伸查詢 |
7. | 楊大輝、賴奕維(2005)。航空公司短期維修計畫之人員勤務指派。運輸計劃季刊,34(4),525-548。 延伸查詢 |
8. | 鄭明淵、陳惠民(1998)。工程土方資源管理與指派載運監控系統。中國土木水利工程學刊,10(2),251-262。 延伸查詢 |
9. | 顏上堯、顧梓承、陳佳宏(2002)。土石方工程調派最佳決策模式之研究。技術學刊,18(4),503-508。 延伸查詢 |
10. | Amirkhanian, S. N.、Baker, N. J.(1992)。Expert System for Equipment Selection for Earth-moving Operations。Journal of Construction Engineering and Management,118(2),318-331。 |
11. | Diana, M.、Dessouky, M. M.(2004)。A New Regret Insertion Heuristic for Solving Large-scale Dial-a-ride Problems with Time Windows。Transportation Research Part B: Methodological,38(6),539-557。 |
12. | Lin, J. R.、Yang, T. H.(2011)。Strategic Design of Public Bicycle Sharing Systems with Service Level Constraints。Transportation Research Part E: Logistics and Transportation Review,47(2),284-294。 |
13. | Marzouk, M.、Moselhi, O.(2003)。Object-oriented Simulation Model for Earthmoving Operations。Journal of Construction Engineering and Management,129(2),173-181。 |
14. | Marzouk, M.、Moselhi, O.(2004)。Multiobjective Optimization of Earthmoving Operations。Journal of Construction Engineering and Management,130(1),105-115。 |
15. | Rego, C.、Roucairol, C.(1995)。Using Tabu Search for Solving a Dynamic Multi-terminal Truck Dispatching Problem。European Journal of Operational Research,83(2),411-429。 |
16. | Smith, S. D.(2001)。Earthmoving Productivity Estimation Using Linear Regression Techniques。Journal of Construction Engineering and Management,127(6),502-511。 |
17. | Smith, S. D.、Osborne, J. R.、Forde, M. C.(1995)。Analysis of Earth-moving System Using Discrete-event Simulation。Journal of Construction Engineering and Management,121(4),388-396。 |
18. | Wang, D. Z. W.、Lo, H. K.(2008)。Multi-fleet Ferry Service Network Design with Passenger Preferences for Differential Services。Transportation Research Part B: Methodological,42(9),798-822。 |
19. | Yan, S.、Shih, Y. L.(2007)。A Time-space Network Model for Work Team Scheduling after a Major Disaster。Journal of the Chinese Institute of Engineers,30(1),63-75。 |