:::

詳目顯示

回上一頁
題名:土石方調派暨傾卸卡車派遣規劃模式之研究
書刊名:運輸學刊
作者:顏上堯朱致遠陳冠霖
作者(外文):Yan, Shang-yaoChu, Chih-yuanChen, Kuan-lin
出版日期:2012
卷期:24:3
頁次:頁353-378
主題關鍵詞:傾卸卡車派遣排程土石方調派時空網路含額外限制網路流動問題Dump truck dispatchingRoutingEarthmovingTime-space networkNetwork flow problem with side constraint
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(1) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:1
  • 共同引用共同引用:2
  • 點閱點閱:48
期刊論文
1.Bent, R. W.、Hentenryck, P. V.(2004)。Scenario-Based Planning for Partially Dynamic Vehicle Routing with Stochastic Customers。Operations Research,52(6),977-987。  new window
2.Azia, N.、Gendreaua, M.、Potvin, J. Y.(2007)。An Exact Algorithm for a Single-vehicle Routing Problem with Time Windows and Multiple Routes。European Journal of Operational Research,178(3),755-766。  new window
3.Young, H. F.、Yan, S.(1996)。A Decision Support Framework for Multi-fleet Routing and Multi-stop Flight Scheduling。Transportation Research Part A: Policy and Practice,30(5),379-398。  new window
4.Hsu, C. I.、Hung, S. F.、Li, H. C.(2007)。Vehicle Routing Problem with Time-windows for Perishable Food Delivery。Journal of Food Engineering,80(2),465-475。  new window
5.Yan, S.、Chen, H.(2002)。A Scheduling Model and a Solution Algorithm for Inter-City Bus Carriers。Transportation Research Part A: Policy and Practice,36(9),805-825。  new window
6.顏上堯、簡德和、陳俊穎(20060400)。開發區域內土方工程最佳調派決策模式之研究。臺灣公共工程學刊,1(2),1-14。  延伸查詢new window
7.楊大輝、賴奕維(2005)。航空公司短期維修計畫之人員勤務指派。運輸計劃季刊,34(4),525-548。new window  延伸查詢new window
8.鄭明淵、陳惠民(1998)。工程土方資源管理與指派載運監控系統。中國土木水利工程學刊,10(2),251-262。  延伸查詢new window
9.顏上堯、顧梓承、陳佳宏(2002)。土石方工程調派最佳決策模式之研究。技術學刊,18(4),503-508。  延伸查詢new window
10.Amirkhanian, S. N.、Baker, N. J.(1992)。Expert System for Equipment Selection for Earth-moving Operations。Journal of Construction Engineering and Management,118(2),318-331。  new window
11.Diana, M.、Dessouky, M. M.(2004)。A New Regret Insertion Heuristic for Solving Large-scale Dial-a-ride Problems with Time Windows。Transportation Research Part B: Methodological,38(6),539-557。  new window
12.Lin, J. R.、Yang, T. H.(2011)。Strategic Design of Public Bicycle Sharing Systems with Service Level Constraints。Transportation Research Part E: Logistics and Transportation Review,47(2),284-294。  new window
13.Marzouk, M.、Moselhi, O.(2003)。Object-oriented Simulation Model for Earthmoving Operations。Journal of Construction Engineering and Management,129(2),173-181。  new window
14.Marzouk, M.、Moselhi, O.(2004)。Multiobjective Optimization of Earthmoving Operations。Journal of Construction Engineering and Management,130(1),105-115。  new window
15.Rego, C.、Roucairol, C.(1995)。Using Tabu Search for Solving a Dynamic Multi-terminal Truck Dispatching Problem。European Journal of Operational Research,83(2),411-429。  new window
16.Smith, S. D.(2001)。Earthmoving Productivity Estimation Using Linear Regression Techniques。Journal of Construction Engineering and Management,127(6),502-511。  new window
17.Smith, S. D.、Osborne, J. R.、Forde, M. C.(1995)。Analysis of Earth-moving System Using Discrete-event Simulation。Journal of Construction Engineering and Management,121(4),388-396。  new window
18.Wang, D. Z. W.、Lo, H. K.(2008)。Multi-fleet Ferry Service Network Design with Passenger Preferences for Differential Services。Transportation Research Part B: Methodological,42(9),798-822。  new window
19.Yan, S.、Shih, Y. L.(2007)。A Time-space Network Model for Work Team Scheduling after a Major Disaster。Journal of the Chinese Institute of Engineers,30(1),63-75。  new window
其他
1.内政部(2006)。公共工程及公有建築工程營建剩餘土石方交換利用作業要點。  延伸查詢new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top
QR Code
QRCODE