期刊論文1. | Balamurali, S.、Jun, C.H.(2004)。Modified CSP-T sampling procedures for continuous production processes。Quality Technology and Quantitative Management,1(2),175-188。 |
2. | Case, K.E.、Bennett, G.K.、Schmidt, J.W.(1973)。The Dodge CSP-1 continuous sampling plan under inspection error。AIIE Transactions,5(2),193-202。 |
3. | Wang, R.C.、Chen, C.H.(1994)。Minimum AFI for CSP-2 under inspection error。Computer & Industrial Engineering,26(4),755-785。 |
4. | Chen, C.H.、Chou, C.Y.(2002)。Economic design of continuous sampling plan under linear inspection cost。Journal of Applied Statistics,29(7),1003-1009。 |
5. | Chen, C.H.、Chou, C.Y.(2004)。Minimum average fraction inspected for modified CSP-1 plan。Pan-Pacific Management Review,7(1),35-43。 |
6. | Dodge, H. F.、Torrey, M. N.(1951)。Additional continuous sampling inspection plans。Industrial Quality Control,7(5),7-12。 |
7. | Ghosh, D.T.(1990)。The optimum CSP-2 (k=i) that minimizes inspection when incoming quality p follows a distribution。Operations Research,27,153-164。 |
8. | Haji, A.、Haji, R.(2004)。The optimal policy for a sampling plan in continuous in terms of the clearance number。Computers & Industrial Engineering,47(2/3),141-147。 |
9. | Yu, H. F.、Yu, W. C.、Wu, W. P.(2009)。A mixed inspection policy for CSP-1 and precise inspection under inspection errors and return cost。Computers & Industrial Engineering,57(3),652-659。 |
10. | Wang, R.C.、Chen, C.H.(1997)。Minimum average fraction inspected for continuous sampling plan CSP-1 under inspection error。Journal of Applied Statistics,24(5),539-548。 |
11. | Balamurali, S.(1999)。Modified two-level continuous sampling plans。Economic Quality Control,14(3/4),123-133。 |
12. | Balamurali, S.、Govindaraju, K.(2000)。Modified tightened two-level continuous sampling plans。Journal of Applied Statistics,27(4),397-409。 |
13. | Chen, Chung-ho、Chou, Chao-yu(20060300)。Economic Design of Short-Run CSP-1 Plan under Linear Inspection Cost。Tamkang Journal of Science and Engineering,9(1),19-23。 |
14. | Derman, C.、Littauer, S.、Solomon, H.(1957)。Tightened multi-level continuous sampling plans。Annals of Mathematical Statistic,28(2),395-404。 |
15. | Ghosh, D. T.(1990)。The optimum continuous sampling plan CSP-2 with k = i that minimizes the amount of inspection。Operations Research,27(1),31-38。 |
16. | Ghosh, D. T.(1996)。An optimum continuous sampling plan CSP-2 with k â i to minimize the amount of inspection when incoming quality p follows a distribution。The Indian Journal of Statistics,58(Series B),105-117。 |
17. | Jun, C. H.、Balamurali, S.、Kalyanasundaram, M.(2006)。Evaluation and design of two level continuous sampling plans。Tamkang Journal of Science and Engineering,9(4),409-417。 |
18. | Lieberman, G. J.、Solomon, H.(1955)。Multi-level continuous sampling plans。Annals of Mathematical Statistics,26(4),686-704。 |
19. | 林添佑(20081100)。Optimal Inspection Policy for CSP-T with Return Cost Using GERT。工業工程學刊,25(6),446-456。 |
20. | Murphy, R. B.(1959)。Stopping rules with CSP-1 sampling inspection plans in continuous production。Industrial Quality Control,16(5),10-16。 |
21. | Shankar, G.、Mohapatra, B. N.(1994)。GERT analysis of Dodge's CSP-1 continuous sampling plan。The Indian Journal of Statistics,56(Series B),468-478。 |
22. | Wang, R. C.、Chen, C. H.(1993)。The design of CSP-2 under the conditioned inspection capacity。The International Journal of Quality & Reliability Management,10(3),43-60。 |
23. | 于鴻褔、張洝源、江怡蓁(20100700)。A mixed Inspection Policy for CSP-2 and Precise Inspection Under Inspection Errors and Return Cost。工業工程學刊,27(4),304-315。 |
24. | Yu, H. F.、Yu, W. C.(2008)。The optimal production and quality policy for the vendor in a trade。International Journal of Production Research,46(15),4135-4153。 |
25. | Yu, H. F.、Yu, W. C.(2011)。A joint inspection policy for CSP-1 and precise inspection for nonrepairable products under inspection errors and return cost。Journal of Quality,18(1),61-74。 |
26. | Resnikoff, G. J.(1960)。Minimum average fraction inspected for a continuous sampling plan。Journal of Industrial Engineering,11(2),208-209。 |
27. | Dodge, H. F.(1943)。A sampling inspection plan for continuous production。Annals of Mathematical Statistics,14(3),264-279。 |
28. | Govindaraju, K.、Kandasamy, C.(2000)。Design of generalized CSP-C continuous sampling plan。Journal of Applied Statistics,27(7),829-841。 |
29. | 林添佑、于鴻福(20090100)。An Optimal Policy for CSP-1 with Inspection Errors and Return Cost。工業工程學刊,26(1),70-76。 |