題名:Solving a Multi-Criteria Group Scheduling Problem for a Cellular Manufacturing System by Scatter Search
書刊名:工業工程學刊
作者:Kanani, Yousef-gholipourMoghaddam, Reza-tavakkoliKhorrami, Amir
出版日期:2011
卷期:28:3
頁次:頁192-205
主題關鍵詞:單元製造系統順序相依設置完工時間延遲分散式搜尋Cellular manufacturing systemSequencing-dependent setupMakespanArdinessScatter search
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(1) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:1
  • 共同引用共同引用:0
  • 點閱點閱:19
This article presents a group scheduling problem for manufacturing cells, in which parts may visit different cells. By addressing intra-cell scheduling, the sequence of parts within manufacturing cells is determined; however, in inter-cell scheduling, the sequence of cells is obtained. A novel mathematical model is presented for a multi-criteria group scheduling problem in a cellular manufacturing system with respect to a design objective function minimizing the makespan and costs of intra-cell movement, tardiness, and sequence-dependent setup, simultaneously. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time using traditional approaches and optimization tools is extremely difficult. Thus, we develop a meta-heuristic algorithm based on scatter search (SS) to solve the foregoing model. The related results confirm the efficiency and effectiveness of our proposed SS algorithm, which finds good solutions, especially for medium- and large-sized problems.
期刊論文
1.Logendran, R.、Nudtasomboon, N.(1991)。Minimizing the makespan of a group scheduling problem: a new heuristic。International Journal of Production Economics,22(3),217-230。  new window
2.Logendran, R.、Mai, L.、Talkington, D.(1995)。Combined heuristics for bi-level group scheduling problems。International Journal of Production Economics,38(2/3),133-145。  new window
3.Mahmoodi, F.、Dooley, K. J.(1992)。Group scheduling and order releasing: review and foundations for research。Production Planning & Control,3(1),70-80。  new window
4.Wemmerlöv, U.、Vakharia, A. J.(1991)。Job and family scheduling of a flow-line manufacturing cell: a simulation study。IIE Transactions,23(4),383-393。  new window
5.Campbell, H. G.、Dudek, R. A.、Smith, M. L.(1970)。A Heuristic Algorithm for the n Job, m Machine Sequencing Problem。Management Science,16(10),630-667。  new window
6.Johnson, S. M.(1954)。Optimal two and three stage production schedules with setup times included。Naval Research Logistics Quarterly,1(1),61-68。  new window
7.Hitomi, K.、Ham, I.(1976)。Operations Scheduling for Group Technology Applications。Annals of the CIRP,25(1),419-422。  new window
其他
1.Adams, J., E. Balas and D. Zawack,(1988)。The shifting bottleneck procedure for job-shop scheduling。  new window
2.Askin, R. and C. Standridge(1993)。Modeling and Analysis of Manufacturing System。  new window
3.Baker, K.R.,(1990)。Scheduling groups of jobs in the two machine flow shop。  new window
4.Chang, P.C., Y.K. Chung and J.C. Hsieh,(2004)。On singlemachine scheduling with release times to minimize total weighted completion time。  new window
5.Chang, P.C., J.C. Hsieh and C.H. Hsiao(2002)。Application of genetic algorithm to the unrelated parallel machine problem scheduling。  new window
6.Chelouah, R. and P. Siarry,(2000)。Tabu search applied to global optimization。  new window
7.Chelouah, R. and P. Siarry(2003)。Genetic and Nelder- Mead algorithm algorithms hybridized for a more accurate global optimization of continuous multiminima functions。  new window
8.Chen, Y.-Y. and J.T. Lin,(2008)。Hierarchical multiconstraint production planning problem using linear programming and heuristics。  new window
9.Gallagher, C.C. and W.A. Knight,(1986)。Group Technology Production Methods in Manufacturing。  new window
10.Glover, F.,(1977)。Heuristics for integer programming using surrogate constraints。  new window
11.Glover, F.,(1994)。Genetic algorithms and scatter search: unsuspected potentials。  new window
12.Glover, F.,(1994)。Tabu search for nonlinear and parametric optimization (with links to genetic algorithms)。  new window
13.Glover, F.,(1995)。Scatter search and start-paths: beyond the genetic metaphor。  new window
14.Glover, F.,(1998)。A template for scatter search and path relinking。  new window
15.Glover, F.,(1998)。Genetic algorithms, evolutionary algorithms and scatter search: changing tides and untapped potentials。  new window
16.Hendizadeh, S.H., H. Faramarzi and S.A. Mansouri,(2008)。Meta-heuristic for scheduling a flowline manufacturing cell with sequence dependent family setup times。  new window
17.Laguna, M. and R. Martí,(2003)。Scatter Search: Methodology and Implementations in C。  new window
18.Lin, S.W., K.C. Ying and Z.J. Lee,(2009)。Meta-heuristics for scheduling a non-permutation flow line manufacturing cell with sequence dependent family setup times。  new window
19.Logendran, R. and C. Sriskandarajah,(1993)。Twomachine group scheduling problem with blocking and anticipatory setups。  new window
20.López, F.G., M.G. Torres, B.M. Batista, J.A.M. Pérez and J.M.M. Vega,(2006)。Solving feature subset selection problem by a parallel scatter search。  new window
21.Lu, L.F. and J.J. Yuan,(2007)。The single machine batching problem with identical family setup times to minimize maximum lateness is strongly NPHard。  new window
22.Monkman, S.K., D.J. Morrice and J.F. Bard,(2008)。A production scheduling heuristic foe an electronics manufacturer with sequence-dependent setup costs。  new window
23.Nawaz, M., E. Enscore and I. Ham,(1983)。A heuristic for the m-machine n-job flowshop sequencing problem。  new window
24.Schaller, J.,(2001)。A new lower bound for the flow shop group scheduling problem。  new window
25.Shankar, R. and P. Vrat,(1998)。Post design modeling for cellular manufacturing system with cost uncertainty,。  new window
26.Shankar, R. and P. Vrat,(1999)。Some design issues in cellular manufacturing using the fuzzy programming approach,。  new window
27.Siarry, P., G. Berthiau, F. Durbin and J. Haussy(1997)。Enhanced simulated annealing for globally minimization functions of many continuous variables。  new window
28.Soleymanpour, R., P. Vrat and R. Shankar,(2002)。A transiently chaotic neural network approach to the design of cellular manufacturing。  new window
29.Solimanpur, M., P. Vart and R. Shankar(2004)。A heuristic to minimize makespan of cell scheduling problem。  new window
30.Tavakkoli-Moghaddam, R., Y. Gholipour-Kanani and R. Cheraghalizadeh(2008)。A genetic and memetic algorithm approach to sequencing and scheduling of cellular manufacturing systems。  new window
31.Tavakkoli-Moghaddam, R., Y. Gholipour-Kanani and R. Cheraghalizadeh,(2010)。Design of a scatter search method for a novel multi-criteria group scheduling problem in a cellular manufacturing system。  new window
32.Yang, W.H. and C.J. Liao,(1996)。Group scheduling on two cells with inter-cell movement。  new window
33.Yoshida, T. and K. Hitomi,(1979)。Optimal two-stage production scheduling with setup times separated。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top
QR Code
QRCODE