:::

詳目顯示

回上一頁
題名:Unrelated Parallel-Machine Scheduling Simultaneously with Rate-Modifying Activities and Earliness and Tardiness Penalties
書刊名:工業工程學刊
作者:楊達立李新濤楊肅正 引用關係
作者(外文):Yang, Dar-liLee, Hsin-taoYang, Suh-jenq
出版日期:2012
卷期:29:4
頁次:頁282-289
主題關鍵詞:排程非相關平行機臺維修提早完工與延遲完工共同交貨時間點SchedulingUnrelated parallel-machineRate-modifying activityEarliness and tardinessCommon due-date
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(1) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:1
  • 共同引用共同引用:0
  • 點閱點閱:23
In this paper, we consider a scheduling problem simultaneously with rate-modifying activities and earliness and tardiness penalties on an unrelated parallel-machine setting. We assume that each machine has at most one rate-modifying activity to improve its production efficiency during the scheduling horizon and all the jobs have a common due-date. The objective is to determine jointly the optimal positions of rate-modifying activities, the optimal common due-date of all jobs, and the optimal schedule to minimize the sum of earliness and tardiness costs. We show that the problem can be optimally solved in polynomial time.
期刊論文
1.Yang, S.-J.(2011)。Parallel-machine scheduling with simultaneous considerations of position-dependent deterioration effects and maintenance activities。Journal of the Chinese Institute of Industrial Engineers,28,270-280。  new window
2.Zhao, C.-L.、Guo, J.-Y.、Hsu, C.-J.(2011)。Parallelmachine scheduling with deteriorating jobs and ratemodifying activities to minimize total completion time。Journal of the Chinese Institute of Industrial Engineers,28,485-491。  new window
3.Wang, J.-B.、Guo, Q.(201002)。A due-date assignment problem with learning effect and deteriorating jobs。Applied Mathematical Modelling,34,309-313。  new window
4.Wang, X. Y.、Wang, M. Z.(201011)。Single machine common flow allowance scheduling with a rate-modifying activity。Computers & Industrial Engineering,59(4),898-902。  new window
5.Yang, S.-J.、C.-J. Hsu、D.-L. Yang(2010)。Singlemachine scheduling with due-date assignment and aging effect under a deteriorating maintenance activity consideration。International Journal of Information and Management Sciences,21,177-195。  new window
6.Chang, P.-C.、S.-H. Chen、V. Mani(2009)。A note on due-date assignment and single machine scheduling with a learning/aging effect。International Journal of Production Economics,117,142-149。  new window
7.Hsu, C.-J、Cheng, T. C. E.、Yang, D.-L.(2011)。Unrelated parallel-machine scheduling with rate-modifying activities to minimize the total completion time。Information Sciences,181,4799-4803。  new window
8.Lee, C.-Y.、Leon, V.-J.(2001)。Machine scheduling with a rate-modifying activity。European Journal of Operational Research,128,119-128。  new window
9.Kuo, W. H.、Yang, D. L.(20080600)。A note on due-date assignment and single-machine scheduling with deteriorating jobs。Journal of the Operational Research Society,59(6),857-859。  new window
10.Cheng, T.C.E.、L.Y. Kang、C.T. Ng(2004)。Due-date assignment and single-machine scheduling with deteriorating jobs。Journal of the Operational Research Society,55,198-203。  new window
11.Gordon, Valery S.、Proth, Jean-marie、Chu, Chengbin(20020516)。A survey of the state-of-art of common due date assignment and scheduling research。European Journal of Operational Research,139(1),1-25。  new window
12.Ma, Y.、Chu, C. B.、Zuo, C. R.(2010)。A survey of scheduling with deterministic machine availability constraints。Computers & Industrial Engineering,58,199-211。  new window
13.Schmidt, G.(2000)。Scheduling with limited machine availability。European Journal of Operational Research,121(1),1-15。  new window
14.Graham, R. L.、Lawler, E. L.、Lenstra, J. K.、Rinnooy Kan, A. H. G.(1979)。Optimization and Approximation in Deterministic Sequencing and Scheduling: A Survey。Annals of Discrete Mathematics,5,287-326。  new window
15.Mosheiov, G.、Oron, D.(200612)。Due-date assignment and maintenance activity scheduling problem。Mathematical and Computer Modelling,44(11/12),1053-1057。  new window
16.Gordon, V. S.、Tarasevich, A. A.(2009)。A note: Common due date assignment for a single machine scheduling with the rate-modifying activity。Computers & Operations Research,36,325-328。  new window
17.C.L. Zhao、H.Y. Tang、C.D. Cheng(2009)。Twoparallel machines scheduling with rate-modifying activities to minimize total completion time。European Journal of Operational Research,198,354-357。  new window
圖書
1.Brucker, P.(2001)。Scheduling Algorithms。New York:Springer-Verlag Inc.。  new window
2.Mott, J. L.、A. Kandel、T. P. Baker(1986)。Discrete Mathematics for Computer Scientists。New Jersey, NJ:Mathematicians, Prentice-Hall。  new window
3.Jozefowska, J.(2007)。Just-in-Time Scheduling: Models and Algorithms for Computer and Manufacturing Systems。New York, NY:Springer-Verlag Inc.。  new window
4.Papadimitriou, C. H.、Steiglitz, K.(1982)。Combinatorial Optimization: Algorithms and Complexity。Prentice-Hall, Inc.。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top
QR Code
QRCODE