:::

詳目顯示

回上一頁
題名:A Mixed Inspection Policy for Csp-t and Precise Inspection Under Inspection Errors and Return Cost
書刊名:工業工程學刊
作者:于鴻福 引用關係游文清 引用關係吳子凭
作者(外文):Yu, Hong-fwuYu, Wen-chingWu, Zih-ping
出版日期:2012
卷期:29:6
頁次:頁417-426
主題關鍵詞:檢驗誤差退貨成本最佳混合檢驗策略CSP-TInspection errorsReturn costOptimal mixed inspection policy
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(1) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:1
  • 共同引用共同引用:0
  • 點閱點閱:45
This article deals with a mixed policy between precise inspection and CSP-T with inspection errors (Types I and II) and return cost. With respect to non-repairable and repairable products, the following decision variables are determined such that the unit net profit is maximal: (1) the optimal sampling plan for CSP-T and (2) the optimal proportions on which precise inspections should be taken for the non-inspected items, the non-defectives, and the defectives identified in the procedure of CSP-T. Overall, the analytical results indicate that depending on ten parameters (the process defective fraction, Type I error, Type II error, the selling price of an item, the unit formal repair cost, the unit informal repair cost, the unit return cost, the unit opportunity cost, the unit inspection cost, and the unit cost of precise inspection), both of non-repairable and repairable products have two main optimal inspection policies for CSP-T: ‘‘Do 100% inspection consecutively’’ and ‘‘Stop inspection after 100% inspection’’; besides, for the non-inspected items, the non-defectives, and the defectives identified in the procedure of CSP-T, there are two main proportions on which precise inspection should be performed: 100% and 0%.
期刊論文
1.Balamurali, S.、Jun, C.H.(2004)。Modified CSP-T sampling procedures for continuous production processes。Quality Technology and Quantitative Management,1(2),175-188。  new window
2.Case, K.E.、Bennett, G.K.、Schmidt, J.W.(1973)。The Dodge CSP-1 continuous sampling plan under inspection error。AIIE Transactions,5(2),193-202。  new window
3.Chen, C.H.、C.Y. Chou(2002)。Economic design of continuous sampling plan under linear inspection cost。Journal of Applied Statistics,29,1003-1009。  new window
4.Chen, C.H.、C.Y. Chou(2004)。Minimum average fraction inspected for modified CSP-1 plan。Pan-Pacific Management Review,7,35-43。  new window
5.Dodge, H.F.(1943)。A sampling inspection plan for continuous production。Annals of Mathematical Statistics,14,264-279。  new window
6.Dodge, H.F.、M.N. Torrey(1951)。Additional continuous sampling inspection plans。Industrial Quality Control,7,7-12。  new window
7.Fordice, J.J.(1972)。A tightened multi-level continuous sampling plan, CSP-T。Ammunition Procurement and Supply Agency, No. QEM,21,230-10。  new window
8.Gauri, S.、B.N. Mohapatra(1994)。Gert analysis of Dodge'€™s CSP-1 continuous sampling plan。The Indian Journal of statistics,56,468-478。  new window
9.Ghosh, D.T.(1990)。The optimum continuous sampling plan CSP-2 with k¼i that minimizes the amount of inspection。Operations Research,27,31-38。  new window
10.Ghosh, D.T.(1990)。The optimum CSP-2 (k=i) that minimizes inspection when incoming quality p follows a distribution。Operations Research,27,153-164。  new window
11.Ghosh, D.T.(1996)。An optimum continuous sampling plan CSP-2 with k 6≠i to minimize the amount of inspection when incoming quality p follows a distribution。Journal of Statistics, 58,Series B,105-117。  new window
12.Govindaraju, K.、C. Kandasamy(2000)。Design of generalized CSP-C continuous sampling plan。Journal of Applied Statistics,27,829-841。  new window
13.Haji, A.、R. Haji(2004)。The optimal policy for a sampling plan in continuous in terms of the clearance number。Computers & Industrial Engineering,47,141-147。  new window
14.Lin, T.Y.、H.F. Yu(2009)。An optimal policy for CSP-1 with inspection errors and return cost。Journal of Chinese Institute of Industrial Engineers,26(1),70-76。  new window
15.Murphy, R.B.(1959)。Stopping rule with CSP-1 sampling plans in continuous production。Industrial Quality control,19,2-12。  new window
16.Resnikoff, G.J.(1960)。Minimum average fraction inspected for a continuous sampling plan。Journal of Industrial Engineering,11,208-209。  new window
17.Yu, H. F、Chang, A. Y.、Chiang, Y. C.(2010)。A mixed inspection for CSP-2 and precise inspection under inspection errors and return cost。Journal of the Chinese Institute of Industrial Engineers,27,304-315。  new window
18.Yu, H.F.、W.C. Yu、W.P. Wu(2009)。A mixed inspection policy for CSP-1 and precise inspection under inspection errors and return cost。Computers & Industrial Engineering,57,652-659。  new window
19.Wang, R.C.、C.H. Chen(1997)。Minimum average fraction inspected for continuous sampling plan CSP-1 under inspection error。Journal of Applied Statistics,24,539-548。  new window
20.Wang, R.C.、C.H. Chen(1993)。The design of CSP-2 under the conditioned inspection capacity。The International Journal of Quality & Reliability Management,10,43-18。  new window
21.Wang, R.C.、Chen, C.H.(1994)。Minimum AFI for CSP-2 under inspection error。Computer & Industrial Engineering,26(4),755-785。  new window
會議論文
1.Endres, A.C.(1979)。Minimum AFI plan designs for inspection error。Houston。414-416。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top
QR Code
QRCODE