:::

詳目顯示

回上一頁
題名:A Minimax Distribution Free Procedure for a Multi-constraint Inventory Model with Deterministic Variable Lead Time
書刊名:International Journal of Information and Management Sciences
作者:Aref Gholami-WadikolaeiAbolfazl Mirzazadeh
出版日期:2013
卷期:24:3
頁次:頁175-192+a6
主題關鍵詞:隨機存貨系統存貨限制式前置時間機會限制規劃技術大中取小分配不拘程序Stochastic inventory systemInventory constraintsLead timeChance-constrained programming techniqueMinimax distribution free procedure
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(0) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:0
  • 共同引用共同引用:3
  • 點閱點閱:24
期刊論文
1.Bera, U. K.、Rong, M.、Mahaparta, N. K.、Maiti, M.(2009)。A multi-item mixture inventory model involving random lead time and demand with budget constraint and surprise function。Applied Mathematical Modeling,33,4337-4344。  new window
2.Gallego, G.、Moon, I.(1993)。The distribution of free news boy problem: review and extension。Journal of the Operational Research Society,44,825-834。  new window
3.Hariga, M. A.(2010)。A single-item continuous review inventory problem with space restriction。International Journal of Production Economic,128,153-158。  new window
4.Moon, I.、Ha, B. H.、Kim, J.(2012)。Inventory systems with variable capacity。European Journal of Industrial Engineering,6,68-86。  new window
5.Ouyang,Liang-yuh、Chuang,Bor-ren(19981200)。A Minimax Distribution Free Procedure for Periodic Review Inventory Model Involving Variable Lead Time。International Journal of Information and Management Sciences,9(4),25-35。new window  new window
6.Ouyang, L. Y.、Chaung, B. R.(1999)。A minimax distribution free procedure for (T, R , L ) inventory model。International Journal of information and management sciences,10,13-23。  new window
7.Ouyang, L. Y.、Yen, N. C.、Wu, K. S.(1996)。Mixture inventory models with backorders and lost sales for variable lead time。Journal of Operational Research Society,47,829-832。  new window
8.Shrady, D. A.、Choe, U. C.(1971)。Models for multi-item inventory continuous review inventory policies subject to constraints。Naval Research Logistics,18,451-464。  new window
9.Wang. X.(2011)。Continuous review inventory model with variable lead time in a fuzzy random encironment。Expert Systems with Application,38,11715-11721。  new window
10.Wu, J. W.、Lee, W. C.、Tsai, H. Y.(2007)。Computational algorithmic procedure of optimal inventory policy involving a negative exponential crashing cost and variable lead time demand。Applied Mathematics and Computations,184,798-808。  new window
11.Xu, K.、Leung, M. T.(2009)。Stocking policy in a two-party vendor managed channel with space restrictions。International Journal of Production Economics,117,271-285。  new window
12.Chen, Cheng-kang、Chang, Hung-chi、Ouyang, Liang-yuh(20010900)。A Continuous Review Inventory Model with Ordering Cost Dependent on Lead Time。International Journal of Information and Management Sciences,12(3),1-13。  new window
13.Hariga, Moncer、Ben-Daya, Mohamed(1999)。Some Stochastic Inventory Models with Deterministic Variable Lead Time。European Journal of Operational Research,113(1),42-51。  new window
14.Ho, Chia-huei(20090300)。A Minimax Distribution Free Procedure for an Integrated Inventory Model with Defective Goods and Stochastic Lead Time Demand。International Journal of Information and Management Sciences,20(1),161-171。new window  new window
15.Montgomery, Douglas C.、Bazaraa, M. S.、Keswani, Ajit K.(1973)。Inventory Models with a Mixture of Backorders and Lost Sales。Naval Research Logistics,20(2),255-263。  new window
16.Moon, I.、Gallego, G.(1994)。Distribution free procedures for some inventory models。Journal of the Operational Research Society,45,651-658。  new window
17.Wu, Kun-shan(20010300)。Continuous Review Inventory Model with Permissible Delay in Payment。International Journal of Information and Management Sciences,12(1),57-66。  new window
18.Chu, P.、Yang, K. L.、Chen, P. S.(2005)。Improved inventory models with service level and lead time。Computers and Operations Research,32,285-296。  new window
19.Ben-Daya, M.、Raouf, A.(1994)。Inventory models involving lead time as decision variable。Journal of the Operational Research Society,45(5),579-582。  new window
20.Liao, C. J.、Shyu, C. H.(1991)。An Analytical Determination of Lead Time with Normal Demand。International Journal of Operations & Production Management,11(9),72-78。  new window
21.Ouyang, L. Y.、Wu, K. S.、Ho, C. H.(2004)。Integrated vendor-€“buyer cooperative models with stochastic demand in controllable lead time。International Journal of Production Economics,92(3),255-266。  new window
22.Charnes, A.、Cooper, A. A.(1959)。Chance Constrained Programming。Management Science,6(1),73-79。  new window
圖書
1.Tersine R. J.(1994)。Principle of Inventory and Material Management。USA:Prentice-Hall。  new window
2.Brown, R. G.、Gerson, G.(1967)。Decision Rules for Inventory Management。New York, NY:Holt, Rinehart, and Winston。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top