:::

詳目顯示

回上一頁
題名:Permissible Delay in Payments in the Two-echelon Inventory System with Controllable Setup Cost and Lead Time under Service Level Constraint
書刊名:International Journal of Information and Management Sciences
作者:Uthayakumaf, R.Priyan, S.
出版日期:2013
卷期:24:3
頁次:頁193-211+a7
主題關鍵詞:延遲付款設置成本服務水準限制Permissible delay in paymentsSetup costService level constraint
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(1) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:1
  • 共同引用共同引用:3
  • 點閱點閱:21
期刊論文
1.Annadurai, K.、Uthayakumar, R.(2010)。Ordering cost reduction in probabilistic inventory model with controllable lead time and a service level。International Journal of Management Science and Engineering Management,5,403-410。  new window
2.Chang, Hung-chi(20021200)。A Note on Permissible Delay in Payments for (Q, R) Inventory Systems with Ordering Cost Reduction。International Journal of Information and Management Sciences,13(4),1-11。  new window
3.Chang, H. C.、Ouyang, L. Y.、Wu, K. S.、Ho, C. H.(2006)。Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction。European Journal of Operational Research,170,481-495。  new window
4.Chen, F. Y.、Krass, D.(2001)。Inventory models with minimal service level constraints。European Journal of Operational Research,134,120-140。  new window
5.Chern, M. S.、Pan, Q.、Teng, J. T.、Chan, Y. L.、Chen, S. C.(2013)。Stackelberg solution in a vendor-buyer supply chain model with permissible delay in payments。International Journal of Production Economics,144(1),397-404。  new window
6.Glock, H. C.(2010)。Lead time reduction strategies in a single-vendor single-buyer integrated in ventory model with lot size dependent lead time and stochastic demand。International Journal of Production Economics,136,37-44。  new window
7.Hoque, M. A.、Goyal, S. K.(2006)。A heuristic solution procedure for an integrated inventory system under controllable lead-time with equal or unequal size batch shipments between a vendor and a buyer。International Journal of Production Economics,102,217-225。  new window
8.Hsu, S. L.、Lee, C. C.(2009)。Replenishment and lead time decisions in manufacturer retailer chains。Transportation Research Part E,45,398-408。  new window
9.Huang, Yung-fu(20050900)。A Note on EOQ Model under Cash Discount and Payment Delay。International Journal of Information and Management Sciences,16(3),97-107。new window  new window
10.Jha, J. K.、Shanker, K.(2009)。Two-echelon supply chain inventory model with controllable lead time and service level constraint。Computers & Industrial Engineering,57,1096-1104。  new window
11.Pandey, A.、Masin, M.、Prabhu, V.(2007)。Adaptive logistic controller for integrated design of distributed supply chains。Journal of Manufacturing Systems,26,108-115。  new window
12.Tang, J.、Yung, K. L.、Ip, A. W. H.(2004)。Heuristics-based integrated decisions for logistics network systems。Journal of Manufacturing Systems,23,1-13。  new window
13.Teng, Jinn Tsair、Cárdenas-Barrón, Leopoldo Eduardo、Lou, Kuo Ren(2011)。The economic lot size of the integrated vendor-buyer inventory system derived without derivatives: a simple derivation。Applied Mathematics and Computation,217(12),5972-5977。  new window
14.Tsou, Ching-shih、Fang, Hsiao-hua、Lo, Hui-chiung、Huang, Chih-ho(20090300)。A Study of Cooperative Advertising in a Manufacturer-Retailer Supply Chain。International Journal of Information and Management Sciences,20(1),15-26。new window  new window
15.Woo, Y. Y.、Hsu, S. L.、Wu, S. H.(2001)。An integrated inventory model for a single vendor and multiple buyers with ordering cost reduction。International Journal of Production Economics,73,203-215。  new window
16.Zhang, T.、Liang, L.、Yu, Y.、Yan, Y.(2007)。An integrated vendor-managed inventory model for a two-echelon system with order cost reduction。International Journal of Production Economics,109,241-253。  new window
17.Ho, Chia-huei(20090300)。A Minimax Distribution Free Procedure for an Integrated Inventory Model with Defective Goods and Stochastic Lead Time Demand。International Journal of Information and Management Sciences,20(1),161-171。new window  new window
18.Wu, Kun-shan(20010300)。Continuous Review Inventory Model with Permissible Delay in Payment。International Journal of Information and Management Sciences,12(1),57-66。  new window
19.歐陽良裕、陳正綱、Chang, H. C.(1999)。Lead Time and Ordering Cost Reductions in Continuous Review Inventory Systems with Partial Backorders。Journal of the Operational Research Society,50(12),1272-1279。  new window
20.Chu, P.、Yang, K. L.、Chen, P. S.(2005)。Improved inventory models with service level and lead time。Computers and Operations Research,32,285-296。  new window
21.Wu, Kun-Shan、OuYang, Liang-Yuh(1997)。Mixture Inventory Model Involving Variable Lead Time with a Service Level Constraint。Computers & Operations Research,24(9),875-882。  new window
22.Goyal, S. K.、Nebebe, F.(2000)。Determination of economic production-shipment policy for a single-vendor single-buyer system。European Journal of Operational Research,121(1),175-178。  new window
23.Moon, I.、Choi, S.(1994)。The distribution free continuous review inventory system with a service level constraint。Computers & Industrial Engineering,27(1-4),209-212。  new window
24.Porteus, Evan L.(1985)。Investing in Reduced Setups in the EOQ Model。Management Sciences,31(8),998-1010。  new window
25.Ouyang, L. Y.、Wu, K. S.、Ho, C. H.(2007)。An integrated vendor-buyer inventory model with quality improvement and lead time reduction。International Journal of Production Economics,108(1/2),349-358。  new window
26.Annadurai, K.、Uthayakumar, R.(2010)。Controlling setup cost in (Q, r, L) inventory model with defective items。Applied Mathematical Modelling,34(6),1418-1427。  new window
27.Goyal, S. K.(1988)。A join t economic-lot-size model for purchaser and vendor: A comment。Decision Sciences,19,236-241。  new window
28.Liao, C. J.、Shyu, C. H.(1991)。An Analytical Determination of Lead Time with Normal Demand。International Journal of Operations & Production Management,11(9),72-78。  new window
29.Ouyang, L. Y.、Wu, K. S.、Ho, C. H.(2004)。Integrated vendor-€“buyer cooperative models with stochastic demand in controllable lead time。International Journal of Production Economics,92(3),255-266。  new window
30.Banerjee, Avijit(1986)。A joint economic-lot-size model for purchaser and vendor。Decision Sciences,17(3),292-311。  new window
31.Goyal, S. K.(1977)。An Integrated Inventory Model for a Single Supplier-Single Customer Problem。International Journal of Production Research,15(1),107-111。  new window
32.Coates, E. R.、Sarker, B. R.、Ray, T. G.(1996)。Manufacturing setup cost reduction。Computers and Industrial Engineering,31(1/2),111-114。  new window
33.Kim, K. L.、Hayya, J. C.、Hong, J. D.(1992)。Setup Reduction in Economic Production Quantity Model。Decision Sciences,23,500-508。  new window
34.Pan, J. C. H.、Lo, M. C.、Hsiao, Y. C.(2004)。Optimal Reorder Point Inventory Models with Variable Lead Time and Backorder Discount Considerations。European Journal of Operational Research,158,488-505。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top