:::

詳目顯示

回上一頁
題名:Interpretive Structural Modeling and Path Analysis for Proposed Framework of Lean Supply Chain in Indian Manufacturing Industry
書刊名:工業工程學刊
作者:Soni, GunjanKodali, Rambabu
出版日期:2016
卷期:33:8
頁次:頁501-515
主題關鍵詞:LeanSupply chainManufacturingIndiaPath analysisInterpretive structural modeling
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(1) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:1
  • 共同引用共同引用:0
  • 點閱點閱:24
期刊論文
1.Jharkharia, S.、Shankar, R.(2004)。IT enablement of supply chains: modeling the enablers。International Journal of Productivity and Performance Management,53(8),700-712。  new window
2.Martin Christopher、Hau Lee(2004)。Mitigating supply chain risk through improved confidence。International Journal of Physical Distribution & Logistics Management,34(5),388-396。  new window
3.Byrne, G.、Lubowe, D.、Blitz, A.(2007)。Using a lean Six Sigma approach to drive innovation。Strategy & Leadership,35(2),5-10。  new window
4.Agarwal, A.、Shankar, R.、Tiwari, M. K.(2006)。Modeling the metrics of lean, agile and leagile supply chain: an ANP-based approach。European Journal of Operational Research,173(1),211-225。  new window
5.Singh, R. K.、Garg, S. K.、Deshmukh, S. G.、Kumar, M.(2007)。Modelling of critical success factors for implementation of AMTs。Journal of Modelling in Management,2(3),232-250。  new window
6.Soti, A.、Shankar, R.、Kaushal, O. P.(2010)。Modeling the enablers of Six Sigma using interpreting structural modeling。Journal of Modelling in Management,5(2),124-141。  new window
7.Sharma, H. D.、Gupta, A. D.、Gupta, S.(1995)。The objectives of waste management in India: A futures inquiry。Technological Forecasting and Social Change,48,285-309。  new window
8.Costello, Anna B.、Osborne, Jason W.(2005)。Best Practices in Exploratory Factor Analysis: Four Recommendations for Getting the Most From Your Analysis。Practical Assessment, Research and Evaluation,10(7),(7)1-(7)9。  new window
9.Mandal, A.、Deshmukh, S. G.(1994)。Vendor Selection Using Interpretive Structural Modelling (ISM)。International Journal of Operations & Production Management,14(6),52-59。  new window
10.Saxena, J. P.、Sushil, P.、Vrat, P.(1992)。Scenario Building: A Critical Study of Energy Conservation in the Indian Cement Industry。Technological Forecasting and Social Change,41,121-146。  new window
11.Bowersox, Donald J.、Stank, Theodore P.、Daugherty, Patricia J.(1999)。Lean launch: managing product introduction risk through response-based logistics。Journal of Product Innovation Management,16(6),557-568。  new window
12.Lamming, R. C.(1996)。Squaring lean supply with supply chain management。International Journal of Operations and Production Management,16(2),183-196。  new window
13.Adamides, E. D.(2008)。Supporting collaboration in the development and management of lean supply networks。Production Planning and Control,19,35-52。  new window
14.Agus, Arawati、Hajinoor, Mohd Shukri(2012)。Lean production supply chain management as driver towards enhancing product quality and business performance: Case study of manufacturing companies in Malaysia。International Journal of Quality and Reliability Management,29(1),92-121。  new window
15.Anantatmula, V. S.(2008)。Leadership role in making effective use of KM。VINE Journal of Information and Knowledge Management Systems,38(4),445-460。  new window
16.Bhasin, Sanjay、Burcher, Peter(2006)。Lean viewed as a philosophy。Journal of Manufacturing Technology Management,17,56-72。  new window
17.Bolaños, Ricardo、Fontela, Emilio、Nenclares, Alfredo、Pastor, Pablo(2005)。Using interpretive structural modelling in strategic decision‐making groups。Management Decision,43(6),877-895。  new window
18.Charan, P.、Shankar, R.、Baisya, R. K.(2008)。Analysis of interactions among the variables of supply chain performance measurement system implementation。Business Process Management Journal,14,512-529。  new window
19.Andrew Cox、Daniel Chicksand、Martin Palmer(2007)。Stairways to heaven or treadmills to oblivion?: Creating sustainable strategies in red meat supply chains。British Food Journal,109(9),689-720。  new window
20.Faisal, Mohd. Nishat(2010)。Analysing the barriers to corporate social responsibility in supply chains: an interpretive structural modelling approach。International Journal of Logistics Research and Applications,13(3),179-195。  new window
21.Fung, P.(1999)。Managing purchasing in a supply chain context-evolution and resolution。Logistics Information Management,12,362-367。  new window
22.Hines, P.(1996)。Purchasing for lean production: The new strategic agenda。International Journal of Purchasing and Materials Management,32,2-10。  new window
23.Inman, R. R.(1999)。Are you implementing a pull system by putting the cart before the horse。Production and Inventory Management Journal,40,67-71。  new window
24.Iyer, K. C.、Sagheer, M.(2010)。Hierarchical structuring of PPP risks using interpretative structural modeling。Journal of Construction Engineering and Management,136,151-159。  new window
25.Jabbour Ana Beatriz Lopes de Sousa、Omodei Junior Jose Carlos、Jabbour Charbel Jose Chiappetta(2014)。Extending lean manufacturing in supply chains: A successful case in brazil。Benchmarking: An International Journal,21,1070-1083。  new window
26.Jasti, N. V.、Kodali, R.(2015)。A critical review of lean supply chain management frameworks: proposed framework。Production Planning and Control,26,1051-1068。  new window
27.Jha, K. N.、Devaya, M. N.(2008)。Modelling the risks faced by Indian construction companies assessing international projects。Construction Management and Economics,26,337-348。  new window
28.Jones, D. T.、Hines, P.、Rich, N.(1997)。Lean logistics。International Journal of Physical Distribution and Logistics Management,27,153-173。  new window
29.Kanungo, S.(2009)。Two organizational case studies of IT-Enabled value。Systems Research and Behavioral Science,26,689-706。  new window
30.Kanungo, S.、Bhatnagar, V. V.(2002)。Beyond generic models for information system quality: the use of interpretive structural modeling (ISM)。Systems Research and Behavioral Science,19,531-549。  new window
31.Kumar, P.、Shankar, R.、Yadav, S. S.(2008)。Flexibility in global supply chain: modeling the enablers。Journal of Modelling in Management,3,277-297。  new window
32.Lambert, D. M.、A. M. Knemeyer、J. T. Gardner(2004)。Supply chain partnerships: Model validation and implementation。Journal of Business Logistics,25,21-42。  new window
33.Liu, S.、M. Leat、J. Moizer、P. Megicks、D. Dulekha Kasturiratne(2013)。A decision-focused knowledge management framework to support collaborative decision making forlean supply chain management。International Journal of Production Research,51,2123-2137。  new window
34.Manoharan, T. R.、C. Muralidharan、S. G. Deshmukh(2010)。Analyzing the interaction of performance appraisal factors using interpretive structural modelling。Performance Improvement,49,25-35。  new window
35.McIvor, R.(2001)。Lean supply: The design and cost reduction dimensions。European Journal of Purchasing and Supply Management,7(4),227-242。  new window
36.Michaels, L. M. J.(1999)。The making of a lean aerospace supply chain。Supply Chain Management: An International Journal,4,135-145。  new window
37.Nabhani, F.、A. Shokri(2009)。Reducing the delivery lead time in a food distribution SME through the implementation of six sigma methodology。Journal of Manufacturing Technology Management,20,957-974。  new window
38.Ottenbacher, M. C.、R. H. Harrington(2010)。Strategies for achieving success for innovative versus incremental new services。Journal of Services Marketing,24,3-15。  new window
39.Parks, L.(2001)。Wal-Mart gets onboard early with collaborative planning。Drug Store News,23,14-19。  new window
40.Catalina Perez、Rodolfo de Castro、David Simons、Gerusa Gimenez(2010)。Development of lean supply chains: a case study of the Catalan pork sector。Supply Chain Management: An International Journal,15(1),55-68。  new window
41.Qi, Y.、K. K. Boyer、X. Zhao(2009)。Supply chain strategy, product characteristics, and performance impact: Evidence from Chinese manufacturers。Decision Sciences,40,667-695。  new window
42.Raj, T.、R. Shankar、M. Suhaib(2008)。An ISM approach for modelling the enablers of flexible manufacturing system: The case for India。International Journal of Production Research,46,6883-6912。  new window
43.Reisinger, Y.、F. Mavondo(2007)。Structural Equation Modeling。Journal of Travel and Tourism Marketing,21,41-71。  new window
44.Simatupang, T. M.、R. Sridharan(2003)。The collaborative supply chain。International Journal of Logistics Management,13,15-30。  new window
45.Simons, D.、K. Zokaei(2005)。Application of lean paradigm in red meat processing。British Food Journal,107,192-211。  new window
46.Smeds, R.(1994)。Managing Change towards Lean Enterprises。International Journal of Operations and Production Management,14,66-82。  new window
47.Sohal, A.、A. Eggleston(1994)。Lean production: experience amongst Australian organizations。International Journal of Operations & Production Management,14,1-17。  new window
48.Soni, G.、R. Kodali(2012)。Evaluating reliability and validity of lean, agile and leagile supply chain constructs in Indian manufacturing industry。Production Planning and Control,23,864-884。  new window
49.Taylor, D.(1999)。Parallel incremental transformation strategy: An approach to the development of lean supply chains。International Journal of Logistics: Research and Applications,2,305-323。  new window
50.Taylor, D. H.(2006)。Strategic considerations in the development of lean agri-food supply chains: a case study of the UK pork sector。Supply Chain Management: An International Journal,11,271-280。  new window
51.Vlachos, I.(2015)。Applying lean thinking in the food supply chains: a case study。Production Planning and Control,26(16),1351-1367。  new window
52.Walker, B.、D. Bovet、J. Martha(2000)。Unlocking the supply chain to build competitive advantage。The International Journal of Logistics Management,11,1-8。  new window
53.Yenradee, P.、R. Dangton(2000)。Implementation sequence of engineering and management techniques for enhancing the effectiveness of production and inventory control system。International Journal of Production Research,38,2689-2707。  new window
54.Ilyas R. Mohammed、Ravi Shankar、D. K. Banwet(2008)。Creating flex-lean-agile value chain by outsourcing。Business Process Management Journal,14,338-389。  new window
55.Francis, M.(1998)。Lean information and supply chain effectiveness。International Journal of Logistics: Research and Applications,1,93-108。  new window
56.Fynes, B.、A. Ainamo(1998)。Organizational learning and lean supply relationships the case of Apple Ireland。Supply chain Management: An international Journal,3,96-107。  new window
57.Sanderson, J.、A. Cox(2008)。The challenges of supply strategy selection in a project environment: evidence from UK naval shipbuilding。Supply Chain Management: An International Journal,13,16-25。  new window
58.Towill, R. D.(2005)。The impact of business policy on bullwhip induced risk in supply chain management。International Journal of Physical Distribution & Logistics Management,35,555-575。  new window
59.Demirbag, K.、B. Tatoglu、T. Zaim(2007)。The impact of supply chain management practices on performance of SMEs。Industrial Management & Data Systems,107,103-124。  new window
60.McDonald, Roderick P.、Ho, Moon-Ho Ringo(2002)。Principles and practice in reporting structural equation analyses。Psychological Methods,7(1),64-82。  new window
61.Christopher, M.、Towill, D. R.(2002)。Developing Market Specific Supply Chain Strategies。International Journal of Logistics Management,13(1),1-14。  new window
62.Rachel Mason‐Jones、Ben Naylor、Denis R. Towill(2000)。Engineering the leagile supply chain。International Journal of Agile Management Systems,2(1),54-61。  new window
63.Towill, D. R.、Christopher, M.(2002)。The Supply Chain Strategy Conundrum: To be Lean or Agile or to be Lean and Agile。International Journal of Logistics: Research and Applications,5(3),299-309。  new window
64.Liker, Jeffrey K.、Kamath, Rajan R.、Wasti, S. Nazli(1998)。Supplier Involvement in Design: A Comparative Survey of Automotive Suppliers in the USA, UK, and Japan。International Journal of Quality Science,3(3),214-238。  new window
65.Sahney, S.、Banwet, D. K.、Karunes, S.(2006)。An integrated framework for quality in education: Application of quality function deployment, interpretive structural modelling and path analysis。Total Quality Management and Business Excellence,17(2),265-285。  new window
66.Vitasek, K.、Manrodt, K. B.、Abbott, J.(2005)。What Makes a Lean Supply Chain?。Supply Chain Management Review,9,39-45。  new window
圖書
1.Davis, M.、Heineke, J.(2005)。Operations Management: Integrating Manufacturing and Services。New York:McGraw-Hill。  new window
2.Hutcheson, G. D.、Sofroniou, N.(1999)。The multivariate social scientist: Introductory statistics using generalized linear models。Thousand Oaks, CA:Sage Publications。  new window
3.Comrey, A. L.、Lee, Howard B.(1992)。A First Course in Factor Analysis。Hillsdale, New Jersey:Lawrence Erlbaum Associates。  new window
4.Sage, A. P.(1977)。Interpretive Structural Modeling: Methodology for Large Scale Systems。New York:Mc-Graw-Hill。  new window
5.Alabama Technology Network(1998)。Lean Manufacturing Handbook。Huntsville, AL:University of Alabama。  new window
6.Imai, M.、Kaizen, Gemba(1997)。Gemba Kaizen: A common-sense low-cost approach to management。New York, NY:McGraw-Hill。  new window
圖書論文
1.Kline, R. B.(2006)。Reverse arrow dynamics。Structural equation modeling: A second course。Greenwich, CT:Information Age Publishing。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top
:::
無相關博士論文
 
無相關書籍
 
無相關著作
 
1. Modified Single-Vendor Single-Buyer Supply Chain Model with Quality Loss for Product
2. A Branch-and-Bound Algorithm for Identical Parallel Machine Total Tardiness Scheduling Problem with preemption
3. Unrelated Parallel-machine Scheduling with Controllable Processing Times and Eligibility Constraints to Minimize the Makespan
4. Slide Operation Method for a Touch Screen--The Concept of Connecting Audio Component
5. Bi-Objective Optimization for Integrating Production and Preventive Maintenance Scheduling in Two-Stage Assembly Flow Shop Problem
6. Minimizing the Number of Tardy Jobs on a Two-Stage Assembly Flowshop
7. A Branch-and-Bound Algorithm for Identical Parallel-Machine Total Completion Time Scheduling Problem with Preemption and Release Times
8. An Exploration on Debugging Performance for Software Reliability Growth Models with Learning Effects and Change-Points
9. A Study on Nurse Day-Off Scheduling under the Consideration of Binary Preference
10. A Production Inventory Model for Vendor–Buyer Coordination with Quantity Discount, Backordering and Rework for Fixed Life Time Products
11. Secondary Use of Electric Vehicle Batteries and Potential Impacts on Business Models
12. A Pre-Dispatching Vehicle Method for a Diffusion Area in a 300 mm Wafer Fab
13. Pricing and Collection Effort Decisions in a Closed-Loop Supply Chain
14. Measuring Schedule Uncertainty for a Stochastic Resource-Constrained Project Using Scenario-Based Approach with Utility-Entropy Decision Model
 
QR Code
QRCODE