:::

詳目顯示

回上一頁
題名:A Two-Warehouse Inventory Model for Non-Instantaneous Deteriorating Items over Stochastic Planning Horizon
書刊名:工業工程學刊
作者:Mohanty, Dipana JyotiKumar, Ravi ShankarGoswami, A.
出版日期:2016
卷期:33:8
頁次:頁516-532
主題關鍵詞:InventoryRandom time horizonTwo-warehouseNon-instantaneous deteriorationPartial backlogging
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(0) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:0
  • 共同引用共同引用:3
  • 點閱點閱:5
期刊論文
1.Ray, J.、Goswami, A.、Chaudhuri, K. S.(1998)。On an Inventory Model with Two Levels of Storage and Stock-dependent Demand Rate。International Journal of Systems Science,29(3),249-254。  new window
2.楊惠齡(2004)。Two-warehouse Inventory Models for Deteriorating Items with Shortages under Inflation。European Journal of Operational Research,157(2),344-356。  new window
3.Maihami, R.、Abadi, I. N. K.(2012)。Joint control of inventory and its pricing for non-instantaneously deteriorating items under permissible delay in payments and partial backlogging。Mathematical and Computer Modelling,55,1722-1733。  new window
4.Ouyang, L. Y.、Wu, K. S.、Yang, C. T.(2006)。A study on an inventory model for non-instantaneous deteriorating items with permissible delay in payments。Computers and Industrial Engineering,51(4),637-651。  new window
5.Sarkar, B.(2012)。An EOQ model with delay-in payments and time-varying deterioration rate。Mathematical and Computer Modelling,55,367-377。  new window
6.Sarkar, B.、Saren, S.、Wee, H. M.(2013)。An inventory model with variable demand component cost and selling price for deteriorating items。Economic Modelling,30,306-310。  new window
7.Sarkar, B.、Sarkar, S.(2013)。An improved inventory model with partial backlogging, time varying deterioration and stock-dependent demand。Economic Modelling,30,924-932。  new window
8.Sarkar, B.(2013)。A production-inventory model with probabilistic deterioration in two-echelon supply chain management。Applied Mathematical Modelling,37(5),3138-3151。  new window
9.Chang, C. T.、Teng, J. T.、Goyal, S. K.(2010)。Optimal replenishment policies for non-instantaneous deteriorating items with stock-dependent demand。International Journal of Production Economics,123(1),62-68。  new window
10.Geetha, K. V.、Uthayakumar, R.(2010)。Economic design of an inventory policy for non-instantaneous deteriorating items under permissible delay in payments。Journal of Computational and Applied Mathematics,233(10),2492-2505。  new window
11.Shah, N. H.、Soni, H. N.、Patel, K. A.(2013)。Optimizing inventory and marketing policy for non-instantaneous deteriorating items with generalized type deterioration and holding cost rates。Omega,41(2),421-430。  new window
12.Sarkar, B.、Gupta, H.、Chaudhuri, K.、Goyal, S. K.(2014)。An integrated inventory model with variable lead time, defective units and delay in payments。Applied Mathematics and Computation,237(15),650-658。  new window
13.Ghare, P. M.、Schrader, G. F.(1963)。A model for exponentially decaying inventory。Journal of Industrial Engineering,14,238-243。  new window
14.Kar, S.、Bhunia, A. K.、Maiti, M.(2001)。Deterministic inventory model with two levels of storage, a linear trend in demand and a fixed time horizon。Computers & Operations Research,28(13),1315-1331。  new window
15.Sarma, K. V. S.(1987)。A deterministic order-level inventory model for deteriorating items with two storage facilities。European Journal of Operational Research,29(1),70-73。  new window
16.Yang, H.-L.(2006)。Two-warehouse partial backlogging inventory models for deteriorating items under inflation。International Journal of Production Economics,103(1),362-370。  new window
17.Goswami, A.、Chaudhuri, K. S.(1992)。An economic order quantity model for items with two levels of storage for a linear trend in demand。Journal of the Operational Research Society,43(2),157-167。  new window
18.Ghiami, Y.、Williams, T.、Wu, Y.(2013)。A two echelon inventory model for a deteriorating item with stock-dependent demand, partial backlogging and capacity constraints。European Journal of Operational Research,231,587-597。  new window
19.Jaggi, C. K.、Khanna, A.、Verma, P.(2011)。Two-warehouse partial backlogging inventory model for deteriorating items with linear trend in demand under inflationary conditions。International Journal of Systems Science,42(7),1185-1196。  new window
20.Sett, B. K.、Sarkar, B.、Goswami, A.(2012)。A two-warehouse inventory model with increasing demand and time varying deterioration。Scientia Iranica,19,1969-1977。  new window
21.Agrawal, S.、S. Banerjee、S. Papachristos(2013)。Inventory model with deteriorating items, ramp-type demand and partially backlogged shortages for a two warehouse system。Applied Mathematical Modelling,37,8912-8929。  new window
22.Bhunia, A. K.、Jaggi, C. K.、Sharma, A. K.、Sharma, R.(2014)。A two-warehouse inventory model for deteriorating items under permissible delay in payment with partial backlogging。Applied Mathematics and Computation,232,1125-1137。  new window
23.Bhunia, Asoke Kumar、Shaikh, Ali Akbar、Sharma, Garima、Pareek, Sarala(20150600)。A Two Storage Inventory Model for Deteriorating Items with Variable Demand and Partial Backlogging。工業工程學刊,32(4),263-272。new window  new window
24.Leopoldo Eduardo Cárdenas-Barrón、Biswajit Sarkar、Gerardo Treviño-Garza(2013)。Easy and Improved Algorithms to Joint Determination of the Replenishment Lot Size and Number of Shipments for an EPQ Model with Rework。Mathematical and Computational Applications,18(2),132-138。  new window
25.Chun-Tao Chang、Mei-Chuan Cheng、Liang-Yuh Ouyang(2015)。Optimal pricing and ordering policies for non-instantaneously deteriorating items under order-size-dependent delay in payments。Applied Mathematical Modelling,39(2),747-763。  new window
26.Chiang, C.(2008)。Periodic review inventory models with stochastic supplier's visit intervals。International Journal of Production Economics,115,433-438。  new window
27.Cohen, M. A.(1976)。Analysis of single critical number ordering policies for perishable inventories。Operations Research,24,726-741。  new window
28.Dye, C.-Y.(2013)。The eff ect of preservation technology investment on a non-instantaneous deteriorating inventory model。Omega,41,872-880。  new window
29.Ertogral, K.、M. Rahim(2005)。Replenish-up-to inventory control policy with random replenishment intervals。International Journal of Production Economics,93/94,399-405。  new window
30.Ghosh, S. K.、Khanra, S.、Chaudhuri, K. S.(2011)。Optimal price and lot size determination for a perishable product under conditions of finite production, partial backordering and lost sale。Applied Mathematics and Computation,217(13),6047-6053。  new window
31.Karimi-Nasab, M.、I. Konstantaras(2013)。An inventory control model with stochastic review interval and special sale offer。European Journal of Operational Research,227,81-87。  new window
32.Maihami, R.、I. Nakhai Kamalabadi(2012)。Joint pricing and inventory control for non-instantaneous deteriorating items with partial backlogging and time and price dependent demand。International Journal of Production Economics,136,116-122。  new window
33.M. Maitia、M. K. Maiti、A. K. Maiti(2006)。Two storage inventory model with random planning horizon。Applied Mathematics and Computation,183(2),1084-1097。  new window
34.Mohanty, D. J.、R. S. Kumar、A. Goswami(2016)。An improved inventory model with random review period and temporary price discount for deteriorating items。International Journal of System Assurance Engineering and Management,7,62-72。  new window
35.Panda, D.、M. K. Maiti、M. Maiti(2010)。Two warehouse inventory models for single vendor multiple retailers with price and stock dependent demand。Applied Mathematical Modelling,34,3571-3585。  new window
36.Sana, S. S.(2010)。Demand influenced by enterprises' initiatives--A multi-item EOQ model of deteriorating and ameliorating items。Mathematical and Computer Modelling,52(1/2),284-302。  new window
37.Sana, S. S.(2010)。Optimal selling price and lotsize with time varying deterioration and partial backlogging。Applied Mathematics and Computation,217(1),185-194。  new window
38.Sana, S. S.(2011)。Price-sensitive demand for perishable items--an EOQ model。Applied Mathematics and Computation,217(13),6248-6259。  new window
39.Sarkar, B.、Sana, S. S.、Chaudhuri, K.(2010)。Optimal reliability, production lot size and safety stock: an economic manufacturing quantity model。International Journal of Management Science and Engineering Management,5(3),192-202。  new window
40.Sarkar, B.、S. S. Sana、K. Chaudhuri(2013)。An inventory model with finite replenishment rate, trade credit policy and price-discount offer。Journal of Industrial Engineering,2013,1-18。  new window
41.Sarkar, Biswajit、Saren, Sharmila、Cárdenas-Barrón, Leopoldo Eduardo(2015)。An inventory model with trade-credit policy and variable deterioration for fixed lifetime products。Annals of Operations Research,229(1),677-702。  new window
42.Sarkar, B.、B. K. Sett、A. Goswami、S. Sarkar(2015)。Mitigation of high-tech products with probabilistic deterioration and inflations。American Journal of Industrial and Business Management,5,73-89。  new window
43.Shabani, Sonia、Mirzazadeh, Abolfazl、Sharifi, Ehsan(20160300)。A Two-warehouse Inventory Model with Fuzzy Deterioration Rate and Fuzzy Demand Rate under Conditionally Permissible Delay in Payment。工業工程學刊,33(2),134-142。new window  new window
44.Taleizadeh, A. A.、Nematollahi, M. R.(2014)。An inventory control problem for deteriorating items with back-ordering and financial considerations。Applied Mathematical Modelling,38(1),93-109。  new window
45.Tan, Y.、M. X. Weng(2013)。A discrete-in-time deteriorating inventory model with time-varying demand, variable deterioration rate and waiting-time-dependent partial backlogging。International Journal of Systems Science,44,1483-1493。  new window
46.Yang, H.-L.(2011)。A partial backlogging production-inventory lot-size model for deteriorating items with time-varying production and demand rate over a finite time horizon。International Journal of Systems Science,42,1397-1407。  new window
47.Yu, J. C.、K.-J. Wang、Y.-S. Lin(2016)。Managing dual warehouses with an incentive policy for deteriorating items。International Journal of Systems Science,47,586-602。  new window
48.黃惠民、游兆鵬、羅時添(20051100)。Two-warehouse Inventory Model with Partial Backordering and Weibull Distribution Deterioration under Inflation。工業工程學刊,22(6),451-462。new window  延伸查詢new window
49.Goyal, S. K.、Giri, B. C.(2001)。Recent trends in modeling of deteriorating inventory。European Journal of Operational Research,134(1),1-16。  new window
50.Wu, K. S.、Ouyang, L. Y.、Yang, C. T.(2006)。An optimal replenishment policy for non-instantaneous deteriorating items with stock-dependent demand and partial backlogging。International Journal of Production Economics,101(2),369-384。  new window
會議論文
1.Bao-zheng Liu、Chuan Zhang、Ding-wei Wang(2009)。Replenish-up-to inventory control policy with stochastic replenishment intervals for perishable merchandise。Guilin, China:IEEE。4804-4808。  new window
圖書
1.Hartely, R. V.(1976)。Operations Research--A Managerial Emphasis。California, CA:Goodyear Publishing Company。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top
:::
無相關博士論文
 
無相關書籍
 
無相關著作
 
1. A Branch-and-Bound Algorithm for Identical Parallel Machine Total Tardiness Scheduling Problem with preemption
2. Bi-Objective Optimization for Integrating Production and Preventive Maintenance Scheduling in Two-Stage Assembly Flow Shop Problem
3. Minimizing the Number of Tardy Jobs on a Two-Stage Assembly Flowshop
4. A Branch-and-Bound Algorithm for Identical Parallel-Machine Total Completion Time Scheduling Problem with Preemption and Release Times
5. An Exploration on Debugging Performance for Software Reliability Growth Models with Learning Effects and Change-Points
6. A Study on Nurse Day-Off Scheduling under the Consideration of Binary Preference
7. A Production Inventory Model for Vendor–Buyer Coordination with Quantity Discount, Backordering and Rework for Fixed Life Time Products
8. Secondary Use of Electric Vehicle Batteries and Potential Impacts on Business Models
9. 3-D Modeling and Hexahedral Mesh Generation Method Based on Failure Characteristics of Remanufactured Centrifugal Compressor Impeller
10. Effects of Environmental Impact Based on Alternative Materials and Process Selection in Automotive Component Design
11. Product Design and Business Model Strategies for a Circular Economy
12. A Proposed Approach to Improve Current Sustainable Product Development
13. Editorial for the Special Issue of Sustainable Design and Manufacturing for Circular Economy
14. A Pre-Dispatching Vehicle Method for a Diffusion Area in a 300 mm Wafer Fab
15. Measuring Schedule Uncertainty for a Stochastic Resource-Constrained Project Using Scenario-Based Approach with Utility-Entropy Decision Model
 
QR Code
QRCODE