:::

詳目顯示

回上一頁
題名:A Pre-Dispatching Vehicle Method for a Diffusion Area in a 300 mm Wafer Fab
書刊名:工業工程學刊
作者:Huang, Chih-weiLin, James T.
出版日期:2016
卷期:33:8
頁次:頁579-591
主題關鍵詞:AMHSSimulationPre-dispatchingDiffusionForm-batch manufacturing
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(0) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:0
  • 共同引用共同引用:0
  • 點閱點閱:10
期刊論文
1.Baker, B. M.、Ayechew, M. A.(2003)。A Genetic Algorithm for the Vehicle Routing Problem。Computers and Operations Research,30(5),787-800。  new window
2.Egbelu, P. J.、Tanchoco, J. M. A.(1984)。Characterization of Automatic Guided Vehicle Dispatching rules。International Journal of Production Research,22(3),359-374。  new window
3.Agrawal, G. K.、S. S. Heragu(2006)。A survey of automated material handling systems in 300-mm semiconductor fabs。IEEE Transactions on Semiconductor Manufacturing,19,112-120。  new window
4.Campbell, E.、R. Wright、J. Cheatham、M. Schulz、J. L. Berry(2000)。Simulation modelling for 300 mm semiconductor factories。Solid State Technology,43,95-104。  new window
5.Cardarelli, E.、P. M. Pelagagge(1995)。Simulation tool for design and management optimization of automated interbay material handling and storage systems for large wafer fab。IEEE Transactions on Semiconductor Manufacturing,8,44-49。  new window
6.Kim, B. I.、J. Park(2009)。Idle vehicle circulation policies in a semiconductor FAB。Journal of Intelligent Manufacturing,20,709-717。  new window
7.Kim, C. W.、J. M. A. Tanchoco(1991)。Conflict-free shortest time bidirectional AGV routing。International Journal of Production Research,29,2377-2391。  new window
8.Lin, J. T.、F. K. Fu-Kwun Wang、C. K. Chun-Kuan Wu(2003)。Simulation analysis of the connecting transport AMHS in a wafer fab。IEEE Transactions on Semiconductor Manufacturing,16,555-564。  new window
9.Lin, J. T.、F. K. Wang、P. Y. Yen(2001)。Simulation analysis of dispatching rules for an automated interbay material handling system in wafer fab。International Journal of Production Research,39,1221-1238。  new window
10.Lin, J. T.、F. K. Wang、P. Y. Yen(2004)。The maximum loading and the optimum number of vehicles in a double-loop of an interbay material handling system。Production Planning & Control,15,247-255。  new window
11.Lin, J. T.、F. K. Wang、J. R. Young(2004)。Virtual vehicle in the connecting transport automated material-handling system (AMHS)。International Journal of Production Research,42,2599-2610。  new window
12.Lin, J. T.、C. K. Wu、C. J. Yang(2002)。Vehicle management of AMHS in 300 mm wafer fab。Journal of the Chinese Institute of Industrial Engineers,19,1-10。  new window
13.Shen, Y. C.、J. E. Kobza(1998)。A dispatch-rule-based algorithm for automated guided vehicle systems design。Production Planning & Control,9,47-59。  new window
14.Wang, K. J.、J. T. Lin、G. Weigert(2007)。Agent-based interbay system control for a single-loop semiconductor manufacturing fab。Production Planning & Control,18,74-90。  new window
15.Maxwell, W. L.、Muckstadt, J. A.(1982)。Design of automatic guided vehicle systems。IIE Transactions,14(2),114-124。  new window
會議論文
1.Pierce, N. G.、R. Stafford(1994)。Modelling and simulation of material handling for semiconductor wafer fabrication。Proceedings of the 1994 Winter Simulation Conference,(會議日期: 1994/12/11-12/14)。Austin, USA。900-906。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top
:::
無相關期刊論文
 
無相關博士論文
 
無相關書籍
 
無相關著作
 
1. Secondary Use of Electric Vehicle Batteries and Potential Impacts on Business Models
2. Interpretive Structural Modeling and Path Analysis for Proposed Framework of Lean Supply Chain in Indian Manufacturing Industry
3. A Branch-and-Bound Algorithm for Identical Parallel Machine Total Tardiness Scheduling Problem with preemption
4. Unrelated Parallel-machine Scheduling with Controllable Processing Times and Eligibility Constraints to Minimize the Makespan
5. The Development of Strategic Balanced Scorecard Tool (SBST) for Malaysian Automotive Industry
6. Bi-Objective Optimization for Integrating Production and Preventive Maintenance Scheduling in Two-Stage Assembly Flow Shop Problem
7. Minimizing the Number of Tardy Jobs on a Two-Stage Assembly Flowshop
8. A Branch-and-Bound Algorithm for Identical Parallel-Machine Total Completion Time Scheduling Problem with Preemption and Release Times
9. An Exploration on Debugging Performance for Software Reliability Growth Models with Learning Effects and Change-Points
10. A Study on Nurse Day-Off Scheduling under the Consideration of Binary Preference
11. A Production Inventory Model for Vendor–Buyer Coordination with Quantity Discount, Backordering and Rework for Fixed Life Time Products
12. 3-D Modeling and Hexahedral Mesh Generation Method Based on Failure Characteristics of Remanufactured Centrifugal Compressor Impeller
13. Effects of Environmental Impact Based on Alternative Materials and Process Selection in Automotive Component Design
14. Product Design and Business Model Strategies for a Circular Economy
 
QR Code
QRCODE