期刊論文1. | Wei, J.、Zhao, J.(2011)。Pricing decisions with retail competition in a fuzzy closed-loop supply chain。Expert Systems with Applications,38,11209-11216。 |
2. | Xie, Y.、Petrovic, D.、Burnham, K.(2006)。A heuristic procedure for the two-level control of serial supply chains under fuzzy customer demand。International Journal Production Economics,102,37-50。 |
3. | Min, H.、Ko, C. S.、Ko, H. J.(2006)。The spatial and temporal consolidation of returned products in a closed-loop supply chain network。Computers & Industrial Engineering,51,309-320。 |
4. | Ahmadi-Javid, Amir、Azad, Nader(2010)。Incorporating Location, Routing and Inventory Decisions in Supply Chain Network Design。Transportation Research Part E: Logistics and Transportation Review,46(5),582-597。 |
5. | Konstantaras, I.、Papachristos, S.(2007)。Optimal policy and holding cost stability regions in a periodic review inventory system with manufacturing and remanufacturing options。European Journal of Operational Research,178(2),433-448。 |
6. | El-Sayed, M.、Afia, N.、El-Kharbotly, A.(2010)。A stochastic model for forward reverse logistics network design under risk。Computers & Industrial Engineering,58,423-431。 |
7. | Easwaran, G.、Üster, H.(2009)。Tabu search and benders decomposition approaches for a capacitated closed-loop supply chain network design problem。Transportation Science,43,301-320。 |
8. | Subramanian, P.、Ramkumar, N.、Narendran, T. T.、Ganesh, K.(2013)。PRISM: PRIority based SiMulated Annealing for a closed loop supply chain network design problem。Applied Soft Computing,13,1121-1135。 |
9. | Wang, Hsiao-Fan、Hsu, Hsin-Wei(2010)。A closed-loop logistic model with a spanning-tree based genetic algorithm。Computers and Operations Research,37(2),376-389。 |
10. | Kannan, G.、Sasikumar, P.、Devika, K.(2010)。A genetic algorithm approach for solving a closed loop supply chain model: A case of battery recycling。Applied Mathematical Modeling,34(3),655-670。 |
11. | Pishvaee, M. S.、Rabbani, M.、Torabi, S. A.(2011)。A robust optimization approach to closed-loop supply chain network design under uncertainty。Applied Mathematical Modelling,35(2),637-649。 |
12. | Ramezani, M.、Bashiri, M.、Tavakkoli-Moghaddam, R.(2013)。A robust design for a closed-loop supply chain network under an uncertain environment。The International Journal of Advanced Manufacturing Technology,66(5),825-843。 |
13. | Saeidifar, A.、Pasha, E.(2009)。The possibilistic moments of fuzzy numbers and their applications。Journal of Computation and Applied Mathematics,223,1028-1042。 |
14. | Aryanezhad, M. B.、Kheirkhah, A. S.、Deljoo, V.、Mirzapour Al-e-hashem, S. M. J.(2009)。Designing safe job rotation schedules based upon workers' skills。The International Journal of Advanced Manufacturing Technology,41(1/2),193-199。 |
15. | Azaron, A.、Brown, K. N.、Tarim, S. A.、Modarres, M. A.(2008)。A multi-objective stochastic programming approach for supply chain design considering risk。International Journal of Production Economics,116,129-138。 |
16. | Cao, X. G.、Zheng, B. R.、Wu, J. F.、Li, J. Z.、Wen, H.(2014)。Equilibrium analysis of closed-loop supply chain based on the stochastic demand and risk decision-making。Operations Research and Management Science,23,89-98。 |
17. | Das, D.、Dutta, P.(2015)。Design and analysis of a closedloop supply chain in presence of promotional offer。International Journal of Production Research,53,141-165。 |
18. | Giri, B. C.、Sharma, S.(2015)。Optimizing a closed-loop supply chain with manufacturing defects and quality dependent return rate。Journal of Manufacturing Systems,35,92-111。 |
19. | Haimes, Y. Y.、Lasdon, L. S.、Wismer, D. A.(1971)。On a bicriterion formulation of the problems of integrated system identification and system optimization。IEEE Transactions on Systems Man and Cybernetics,1,296-297。 |
20. | Jubril, A. M.(2012)。Nonlinear weights selection in weighted sum for convex multiobjective optimization。Facta Universitatis,3,357-372。 |
21. | Kim, T.、Glock, C. H.、Kwon, Y. A.(2014)。A closed-loop supply chain for deteriorating products under stochastic container return times。Omega,43,30-40。 |
22. | Li, Y.、Dang, X. H.(2014)。Coordination contract design of closed-loop supply chain with a risk-averse retailer。Economic Problem,37,95-98。 |
23. | Li, R.、Leung, Y.、Lin, H.、Huang, B.(2013)。An adaptive compromise programming method for multi-objective path optimization。Journal of Geographical Systems,15,211-228。 |
24. | Lin, J. G.(2005)。On min-norm and min-max methods of multiobjective optimization。Mathematical Programming,103,1-33。 |
25. | Lundin, J. F.(2012)。Redesigning a closed-loop supply chain exposed to risks。International Journal of Production Economics,140,596-603。 |
26. | Olugu, E. U.、Wong, K. Y.(2012)。An expert fuzzy rulebased system for closed-loop supply chain performance assessment in the automotive industry。Expert Systems with Applications,39,375-384。 |
27. | Özceylan, E.、Paksoy, T.、Bektaş, T.(2014)。Modeling and optimizing the integrated problem of closed-loop supply chain network design and disassembly line balancing。Transportation Research Part E: Logistics and Transportation Review,61,142-164。 |
28. | Özkır, V.、Başlıgil, H.(2013)。Multi-objective optimization of closed-loop supply chains in uncertain environment。Journal of Cleaner Production,41,114-125。 |
29. | Ramezani, M.、Kimiagari, A. M.、Karimi, B.(2014)。Closedloop supply chain network design: A financial approach。Applied Mathematical Modelling,38,4099-4119。 |
30. | Ramezani, M.、Kimiagari, A. M.、Karimi, B.、Hejazi, T. H.(2014)。Closed-loop supply chain network design under a fuzzy environment。Knowledge-Based Systems,59,108-120。 |
31. | Sazvar, Z.、Mirzapour Al-e-hashem, S. M. J.、Baboli, A.、Jokar, M. A.(2014)。A bi-objective stochastic programming model for a centralized green supply chain with deteriorating products。International Journal of Production Economics,150,140-154。 |
32. | Shen, Z. M.(2007)。Integrated supply chain design models: a survey and future research directions。Journal of Industrial and Management Optimization,3,1-27。 |
33. | Shi, J.、Zhang, G.、Sha, J.(2011)。Optimal production planning for a multi-product closed loop system with uncertain demand and return。Computers & Operations Research,38(3),641-650。 |
34. | Soleimani, H.、Seyyed-Esfahani, M.、Kannan, G.(2014)。Incorporating risk measures in closed-loop supply chain network design。International Journal of Production Research,52,1843-1867。 |
35. | Soleimani, H.、Seyyed-Esfahani, M.、Shirazi, M. A.(2013)。Designing and planning a multi-echelon multi-period multi-product closed-loop supply chain utilizing genetic algorithm。The International Journal of Advanced Manufacturing Technology,68,917-931。 |
36. | Subulan, K.、Taşan, A. S.、Baykasoğlu, A.(2012)。Fuzzy mixed integer programming model for medium-term planning in a closed-loop supply chain with remanufacturing option。Journal of Intelligent and Fuzzy Systems,23,345-368。 |
37. | Sun, H.、Jian, L.、Zhang, G.(2015)。Research on closed-loop supply chain network equilibrium with two-type suppliers, risk-averse manufacturers and capacity constraints。Journal of Industrial Engineering and Management,8,509-529。 |
38. | Tseng, M. L.、Lin, R. J.、Lin, Y. H.、Chen, R. H.、Tan, K.(2014)。Close-loop or open hierarchical structures in green supply chain management under uncertainty。Expert Systems with Applications,41,3250-3260。 |
39. | Wang, H. F.、Hsu, H. W.(2010)。Resolution of an uncertain closed-loop logistics model: An application to fuzzy linear programs with risk analysis。Journal of Environmental Management,91(11),2148-2162。 |
40. | Wei, J.、Zhao, J.(2013)。Reverse channel decisions for a fuzzy closed-loop supply chain。Applied Mathematical Modelling,37,1502-1513。 |
41. | Zarandi, M. H. F.、Sisakht, A. H.、Davari, S.(2011)。Design of a closed-loop supply chain (CLSC) model using an interactive fuzzy goal programming。The International Journal of Advanced Manufacturing Technology,56,809-821。 |
42. | Zeballos, L. J.、Méndez, C. A.、Barbosa-Povoa, A. P.、Novais, A. Q.(2014)。Multi-period design and planning of closed-loop supply chains with uncertain supply and demand。Computers & Chemical Engineering,66,151-164。 |
43. | Zhang, J.、Liu, X.、Tu, Y. L.(2011)。A capacitated production planning problem for closed-loop supply chain with remanufacturing。The International Journal of Advanced Manufacturing Technology,54,757-766。 |
44. | Zhang, W. G.、Liu, Y. J.、Xu, W. J.(2012)。A possibilistic mean-semivariance-entropy model for multi-period portfolio selection with transaction costs。European Journal of Operational Research,222,341-349。 |
45. | Zadeh, L. A.(1963)。Optimality and Non-scalar Valued Performance Criteria。IEEE Transactions on Automatic Control,8(1),59-60。 |
46. | Carlsson, C.、Fuller, R.(2001)。On Possibilistic Mean Value and Variance of Fuzzy Numbers。Fuzzy Sets and Systems,122(2),315-326。 |