:::

詳目顯示

回上一頁
題名:An Integrated Inventory Model with Immediate Return for Defective Items under Unequal-Sized Shipments
書刊名:工業工程學刊
作者:Yu, Hong-fwuhsu, wen-kai 引用關係
出版日期:2017
卷期:34:1
頁次:頁70-77
主題關鍵詞:Imperfect qualityImmediate returnIntegrated production-inventory modelUnequal-sized shipments
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(0) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:0
  • 共同引用共同引用:2
  • 點閱點閱:2
期刊論文
1.Hsu, W. K.、Yu, H. F.(2011)。Economic order quality model with immediate return for defective items。ICIC Express Letters,5(7),2215-2220。  new window
2.Cárdenas-Barrón, L. E.(2000)。Observation on: "Economic production quantity model for items with imperfect quality"。International Journal of Production Economics,64,59-64。  new window
3.Cárdenas-Barrón, L. E.(2000)。Observation on: "Economic production quantity model for items with imperfect quality"。International Journal of Production Economics,67(2)。  new window
4.Goyal, S. K.、Cardenas-Barron, Leopoldo Eduardo(2002)。Note on: economic production quantity model for items with imperfect quality--a practical approach。International Journal of Production Economics,77(1),85-87。  new window
5.Hoque, M. A.、Goyal, S. K.(2000)。An optimal policy for a single-vendor single-buyer integrated production-inventory system with capacity constraint of the transport equipment。International Journal of Production Economics,65(3),305-315。  new window
6.Lu, L.(1995)。A one-vendor multi-buyer integrated inventory model。European Journal of Operational Research,81(2),312-323。  new window
7.Ben-Daya, M.、Darwish, M.、Ertogral, K.(2008)。The joint economic lot sizing problem: Review and extensions。European Journal of Operational Research,185,726-742。  new window
8.Kim, S. L.、Ha, D.(2003)。A JIT lot-splitting model for supply chain management: Enhancing buyer-supplier linkage。International Journal of Production Economics,86,1-10。  new window
9.Yang, P. C.、Wee, H. M.(2000)。Economic ordering policy of deteriorated item for vendor and buyer: An integrated approach。Production Planning and Control,11,41-47。  new window
10.Yao, M. J.、Hsu, T. C.(2009)。An efficient search algorithm for obtaining the optimal replenishment strategies in multistage just-in-time supply chain systems。Journal of Industrial and Management Optimization,5,11-32。  new window
11.Banerjee, A.、Burton, S.(1994)。Coordinated vs. independent inventory replenishment policies for a vendor and multiple buyers。International Journal of Production Economics,35,215-222。  new window
12.Banerjee, A.、Kim, S. L.(1995)。An integrated JIT inventory model。International Journal of Operations and Production Management,15,237-244。  new window
13.Goyal, S. K.、Huang, C. K.、Chen, K. C.(2003)。A simple integrated production policy of an imperfect item for vendor and buyer。Production Planning and Control,14(7),596-602。  new window
14.Huang, C. K.(2002)。An integrated vendor-buyer cooperative inventory model for items with imperfect quality。Production Planning and Control,13(4),355-361。  new window
15.Goyal, S. K.(1995)。A one-vendor multi-buyer integrated inventory model: A common。European Journal of Operational Research,82,209-210。  new window
16.Yao, M. J.、Chiou, C. C.(2004)。On a replenishment coordination model in an integrated supply chain with one vendor and multiple buyers。European Journal of Operational Research,159,406-419。  new window
17.Yu, Hong-fwu、Hsu, Wen-kai、Huang, Yu-xiu(20130600)。The Integrated Policy with Immediate Return for Defective Items。工業工程學刊,30(4),230-237。new window  new window
18.Goyal, S. K.、Szendrovits, A. Z.(1986)。A constant lot size model with equal and unequal sized batch shipments between production stages。Engineering Costs and Production Economics,10,203-210。  new window
19.Hill, R. M.(1997)。The single-vendor single-buyer integrated production-inventory model with a generalised policy。European Journal of Operational Research,97,493-499。  new window
20.Pal, B.、Sana, S. S.、Chaudhuri, K.(2012)。Three-layer supply chain--a production-inventory model for reworkable items。Appl. Math. Comput.,219(2),530-543。  new window
21.Cárdenas-Barrón, L. E.、Treviño-Garza, G.、Taleizadeh, A. A.(2015)。Determining replenishment lot size and shipment policy for an EPQ inventory model with delivery and rework。Math. Prob. Eng.,1-8。  new window
22.Cárdenas-Barrón, L. E.、Chung, K. J.、Treviño-Garza, G.(2014)。Celebrating a century of the economic order quantity model in honor of Ford Whitman Harris。Int J Prod Econ,155,1-7。  new window
23.Goyal, S. K.、Gupta, Y.(1989)。Integrated inventory models: the buyervendor coordination。Eur J Oper Res,41,261-269。  new window
24.Sana, S. Sankar(2010)。An economic production lot size model in an imperfect production system。Eur. J. Oper. Res.,201(1),158-170。  new window
25.Modak, N. M.、Panda, S.、Sana, S. S.(20161100)。Two-echelon Supply Chain coordination among manufacturer and duopolies retailers with recycling facility。Int J Adv Manuf Technol,87,1531-1546。  new window
26.Sana, Shib Sankar(2011)。A production-inventory model of imperfect quality products in a three-layer supply chain。Decision Support Systems,50(2),539-547。  new window
27.Goyal, S. K.(1988)。A joint economic-lot-size model for purchaser and vendor: a common。Decisi Sci,19,236-241。  new window
28.Aderohunmu, R.、Mobolurin, A.、Bryson, N.(1995)。Joint vendorbuyer policy in JIT manufacturing。J Oper Res Soc,46,375-385。  new window
29.Goyal, S. K.、Nebebe, F.(2000)。Determination of economic production-shipment policy for a single-vendor-singlebuyer system。Eur J Oper Res,121,175-178。  new window
30.Bogaschewsky, R. W.、Buscher, U. D.、Lindner, G.(2001)。Optimizing multistage production with constant lot size and varying number of unequal sized batches。Omega,29,183-191。  new window
31.Hoque, M. A.(2013)。A manufacturer-buyer integrated inventory model with stochastic lead times for delivering equaland/ or unequal-sized batches of a lot。Comput Oper Res,40,2740-2751。  new window
32.Treviño-Garza, G.、Castillo-Villar, K. K.、Cárdenas-Barrón, L. E.(2015)。Joint determination of the lot size and number of shipments for a family of integrated vendor-buyer systems considering defective products。Int J Syst Sci,46(9),1705-1716。  new window
33.Huang, C. K.(2004)。An optimal policy for a single-vendor singlebuyer integrated production-inventory problem with process unreliability consideration。Int J Prod Econ,91,91-98。  new window
34.Roy, M. D.、Sana, S. S.、Chaudhuri, K.(2011)。An economic order quantity model of imperfect quality items with partial backlogging。International Journal of Systems Science,42(8),1409-1419。  new window
35.Pal, B.、Sana, S. S.、Chaudhuri, K.(2014)。Joint pricing and ordering policy for two echelon imperfect production inventory model with two cycles。International Journal of Production Economics,155,229-238。  new window
36.Shu, H.、Zhou, X.(2014)。An optimal policy for a single-vendor and a single-buyer integrated system with setup cost reduction and process-quality improvement。Int J Syst Sci,45(5),1242-1252。  new window
37.Yang, Ming-feng、Lo, Ming-cheng、Lu, Ta-ping(20131000)。A Vendor-Buyers Integrated Inventory Model Involving Quality Improvement Investment in a Supply Chain。Journal of Marine Science and Technology,21(5),586-593。  new window
38.Banerjee, Avijit(1986)。A joint economic-lot-size model for purchaser and vendor。Decision Sciences,17(3),292-311。  new window
39.Goyal, S. K.(1977)。An Integrated Inventory Model for a Single Supplier-Single Customer Problem。International Journal of Production Research,15(1),107-111。  new window
40.Ha, D.、Kim, S. L.(1997)。Implementation of JIT Purchasing: An Integrated Approach。Production Planning and Control,8(2),152-157。  new window
41.Salameh, M. K.、Jaber, M. Y.(2000)。Economic production quantity model for items with imperfect quality。International journal of production economics,64(1-3),59-64。  new window
圖書
1.Silver, E. A.、Pyke, D. F.、Peterson, R.(1998)。Inventory Management and Production Planning and Scheduling。New York:Wiley。  new window
2.Herstein, I. N.(1975)。Topics in algebra。Taipei:The Southeast Book Company。  new window
圖書論文
1.Harris, F. W.(1915)。What quantity to make at once。The Library of Factory Management, Vol. V, Operations and costs。Chicago:A. W. Shaw Company。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top
QR Code
QRCODE