:::

詳目顯示

回上一頁
題名:An Integrated Vendor-buyer Inventory Model with Defective Items and Trade Credit under Holding Cost Reduction
書刊名:International Journal of Information and Management Sciences
作者:Hsieh, Tsu-pangWeng, Ming-weiSu, Rung-hungLai, Kuei-kuei
出版日期:2018
卷期:29:2
頁次:頁145-169
主題關鍵詞:Supply chain coordinationHolding cost reductionDefective itemsDelay in paymentPrecision machine industry
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(0) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:0
  • 共同引用共同引用:0
  • 點閱點閱:5
期刊論文
1.Alfares, H. K.(2007)。Inventory model with stock-level dependent demand rate and variable holding cost。International Journal of Production Economics,108,259-265。  new window
2.Chung, K. J.、Huang, Y. F.(2006)。Retailer's optimal cycle times in the EOQ model with imperfect quality and a permissible credit period。Quality and Quantity,40(1),59-77。  new window
3.Teng, Jinn Tsair、Cárdenas-Barrón, Leopoldo Eduardo、Lou, Kuo Ren(2011)。The economic lot size of the integrated vendor-buyer inventory system derived without derivatives: a simple derivation。Applied Mathematics and Computation,217(12),5972-5977。  new window
4.Hsu, J. T.、Hsu, L. F.(2013)。An EOQ model with imperfect quality items, inspection errors, shortage backordering, and sales returns。International Journal of Production Economics,143,162-170。  new window
5.Ouyang, L.-Y.、Chang, C.-T.(2013)。Optimal production lot with imperfect production process under permissible delay in payments and complete backlogging。International Journal of Production Economics,144(2),610-617。  new window
6.Su, C. H.(2012)。Optimal replenishment policy for an integrated inventory system with defective items and allowable shortage under trade credit。International Journal of Production Economics,139(1),247-256。  new window
7.Yassine, A.、Maddah, B.、Salameh, M.(2012)。Disaggregation and consolidation of imperfect quality shipments in an extended EPQ model。International Journal of Production Economics,135,345-352。  new window
8.Billington, P. J.(2003)。Holding cost reduction in the EOQ model。Journal of American Academy of Business,3,409-415。  new window
9.Jaber, M. Y.、Osman, I. H.(2006)。Coordinating a two-level supply chain with delay in payments and profit sharing。Computers and Industrial Engineering,50(4),385-400。  new window
10.Shah, N. H.、Soni, H. N.、Patel, K. A.(2013)。Optimizing inventory and marketing policy for non-instantaneous deteriorating items with generalized type deterioration and holding cost rates。Omega,41(2),421-430。  new window
11.Jaber, M. Y.、Goyal, S. K.(2009)。A basic model for coordinating a four-level supply chain of a product with a vendor, multiple buyers and tier-1 and tier-2 suppliers。International Journal of Production Research,47(13),3691-3704。  new window
12.Lin, T. Y.(2010)。An economic order quantity with imperfect quality and quantity discounts。Applied Mathematical Modelling,34(10),3158-3165。  new window
13.Wee, H. M.、Yu, J.、Chen, M. C.(2007)。Optimal inventory model for items with imperfect quality and shortage backordering。Omega,35(1),7-11。  new window
14.Khan, M.、Jaber, M. Y.(2011)。Optimal inventory cycle in a two-stage supply chain incorporating imperfect items from suppliers。International Journal of Operational Research,10,442-457。  new window
15.Khan, M.、Jaber, M. Y.、Guiffrida, A. L.、Zolfaghari, S.(2011)。A review of the extensions of a modified EOQ model for imperfect quality items。International Journal of Production Economics,132,1-12。  new window
16.Wahab, M. I. M.、Jaber, M. Y.(2010)。Economic order quantity model for items with imperfect quality, different holding costs, and learning effects: A note。Computers & Industrial Engineering,58(1),186-190。  new window
17.Papachristos, S.、Konstantaras, I.(2006)。Economic ordering quantity models for items with imperfect quality。International Journal of Production Economics,100,148-154。  new window
18.Eroglu, A.、Ozdemir, G.(2007)。An economic order quantity model with defective items and shortages。International Journal of Production Economics,106(2),544-549。  new window
19.Maddah, B.、Jaber, M. Y.(2008)。Economic order quantity for items with imperfect quality: Revisited。International Journal of Production Economics,112(2),808-815。  new window
20.Jaber, M. Y.、Goyal, S. K.(2008)。Coordinating a three-level supply chain with multiple suppliers, a vendor and multiple buyers。International Journal of Production Economics,116,95-103。  new window
21.Roy, M. D.、Sana, S. S.、Chaudhuri, K.(2011)。An economic order quantity model of imperfect quality items with partial backlogging。International Journal of Systems Science,42(8),1409-1419。  new window
22.Badami, V. G.、Smith, S. T.、Raja, J.、Hocken, R. J.(1996)。A portable three-dimensional stylus profile measuring instrument。Precision Engineering,18,147-156。  new window
23.Chen, L. H.、Kang, F. S.(2010)。Coordination between vendor and buyer considering trade credit and items of imperfect quality。International Journal of Production Economics,123,52-61。  new window
24.Fujiwara, O.、Perera, U.(1993)。EOQ models for continuously deteriorating products using linear and exponential penalty costs。European Journal of Operational Research,70(1),104-114。  new window
25.Jaggi, C. K.、Goel, S. K.、Mittal, M.(20130116)。Credit financing in economic ordering policies for defective items with allowable shortages。Applied Mathematics and Computation,219(10),5268-5282。  new window
26.Lin, Y. J.、Ouyang, L. Y.、Dang, Y. F.(2012)。A joint optimal ordering and delivery policy for an integrated supplier-retailer inventory model with trade credit and defective items。Applied Mathematics and Computation,218,7498-7514。  new window
27.Pando, V.、Garcla-Laguna, J.、San-José, L. A.、Sicilia, J.(2012)。Maximizing profits m an inventory model with both demand rate and holding cost per unit time dependent on the stock level。Computers & Industrial Engineering,62,599-608。  new window
28.Rezaei, J.、Davoodi, M. A.(2008)。Deterministic, multi-item inventory model with supplier selection and imperfect quality。Applied Mathematical Modelling,32,2106-2116。  new window
29.Teng, Jinn-Tsair、Yang, Hui-Ling(20070600)。Deterministic Inventory Lot-Size Models with Time-Varying Demand and Cost under Generalized Holding Costs。International Journal of Information and Management Sciences,18(2),113-125。new window  new window
30.Rosenblatt, Meir J.、Lee, Hau L.(1986)。Economic production cycles with imperfect production processes。IIE Transactions,18(1),48-55。  new window
31.Porteus, Evan L.(1986)。Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction。Operations Research,34(1),137-144。  new window
32.Salameh, M. K.、Jaber, M. Y.(2000)。Economic production quantity model for items with imperfect quality。International journal of production economics,64(1-3),59-64。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top
:::
QR Code
QRCODE