期刊論文1. | Maiti, Manas Kumar、Maiti, Manoranjan(20090600)。Utilization of Multi-Objective Genetic Algorithm for One-Item Multi-Level Inventory Distribution System。International Journal of Information and Management Sciences,20(2),291-304。 |
2. | Bruni, M. E.、Beraldi, P.、Guerriero, F.、Pinto, E.(2011)。A heuristic approach for resource constrained project scheduling with uncertain activity durations。Computers & Operations Research,38,1305-1318。 |
3. | Smith-Daniels, D. E.、Aquilano, N. J.(1984)。Constrained resource project scheduling subject to material constraints。Journal of Operations Management,4(4),369-388。 |
4. | Aquilano, N. J.、Smith, D. E.(1980)。A formal set of algorithms for project scheduling with critical path method-material requirements planning。Journal of Operations Management,1,57-67。 |
5. | Chen, S. M.、Griffis, F. H.、Chen, P. H.、Chang, L. M.(2012)。Simulation and analytical techniques for construction resource planning and scheduling。Automation in Construction,21,99-113。 |
6. | Dodin, B.、Elimam, A. A.(2001)。Integrated project scheduling and material planning with variable activity duration and rewards。IIE Transactions,33(11),1005-1018。 |
7. | Dodin, B.、Elimam, A. A.(2008)。Integration of equipment planning and project scheduling。European Journal of Operational Research,184(3),962-980。 |
8. | Drezet, L. E.、Billaut, J. C.(2008)。A project scheduling problem with labour constraints and time-dependent activities requirements。International Journal of Production Economics,112,217-225。 |
9. | Erbasi, A.、Sepil, C.(1999)。A modified heuristic procedure for materials management in project networks。International Journal of Industrial Engineering-Theory,6,132-140。 |
10. | Fu, F.(2014)。Integrated scheduling and batch ordering for construction project。Applied Mathematical Modelling,38,784-797。 |
11. | Kethley, R. Bryan(20081200)。Using Taguchi Loss Functions to Develop a Single Objective Function in a Multi-Criteria Context: A Scheduling Example。International Journal of Information and Management Sciences,19(4),589-600。 |
12. | Kyriakidis, T. S.、Kopanos, G. M.、Georgiadis, M. C.(2012)。MILP formulations for singleand multi-mode resource-constrained project scheduling problems。Computers and Chemical Engineering,36,369-385。 |
13. | 梁文耀、黃俊哲(20130300)。The Genetic Algorithm with Rough Set Theory Incorporated into the Patent Composition。International Journal of Information and Management Sciences,24(1),39-55。 |
14. | Liu, S. S.、Wang, C. J.(2008)。Resource-constrained construction project scheduling model for profit maximization considering cash flow。Automation in Construction,17,966-974。 |
15. | Liu, Shixin、Yung, K. L.、Ip, W. H.(20071200)。Genetic Local Search for Resource-Constrained Project Scheduling under Uncertainty。International Journal of Information and Management Sciences,18(4),347-363。 |
16. | Long, L. D.、Ohsato, A.(2008)。Fuzzy critical chain method for project scheduling under resource constraints and uncertainty。International Journal of Project Management,26,688-698。 |
17. | Lova, A.、Tormos, P.、Cervantes, M.、Barber, F.(2009)。An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes。International Journal of Production Economics,117,302-316。 |
18. | Lu, Hai-wen、Lu, Yung-hsiang、Yang, Hui-mei(20091200)。Ordered Categorical Data in Fuzzy Ranking Applied to Service Quality for Western Restaurants。International Journal of Information and Management Sciences,20(4),505-518。 |
19. | Schmitt, T.、Faaland, B.(2004)。Scheduling recurrent construction。Naval Research Logistics,51,1102-1128。 |
20. | Sajadieh, Sheikh M.、Shadrokh, S.、Hassanzadeh, F.(2009)。Concurrent Project Scheduling and Material Planning: A Genetic Algorithm Approach。Scientia Iranica- Transaction E: Industrial Engineering,16,91-99。 |
21. | Smith-Daniels, D. E.、Smith-Daniels, V. L.(1987)。Optimal project scheduling with materials ordering。IIE Transactions,19,122-129。 |
22. | Wuliang, P.、Chengen, W.(2009)。A multi-mode resource-constrained discrete time-cost tradeoff problem and its genetic algorithm based solution。International Journal of Project Management,27,600-609。 |
23. | Yang, T.、Shen, Y. A.、Cho, C.、Lin, Y. R.(2012)。The use of a simulation, a hybrid Taguchi and dual response surface methods in the automated material handling system tool-to-tool strategy for a 300-mm fab。European Journal of Industrial Engineering,6,281-300。 |
24. | 張文學、張海宏(20130600)。Task Assignment Optimization for the Batch Casualty Surgeries in Emergencies based on Extended Genetic Algorithm。International Journal of Information and Management Sciences,24(2),a7+117-129。 |
25. | Kolisch, R.(1996)。Serial and Parallel Resource-constrained Project Scheduling Methods Revisited: Theory and Computation。European Journal of Operational Research,90,320-333。 |