:::

詳目顯示

回上一頁
題名:Discount Strategies Investigation in Integrated Project Scheduling and Material Procurement
書刊名:International Journal of Information and Management Sciences
作者:Tabrizi, B. H.Ghaderi, S. F.Haji-Yakhchali, S.
出版日期:2017
卷期:28:2
頁次:頁a6+67-82
主題關鍵詞:專案排程物料採購田口方法基因演算法Project schedulingMaterial purchasingTaguchi methodGenetic algorithm
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(0) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:0
  • 共同引用共同引用:4
  • 點閱點閱:7
期刊論文
1.Maiti, Manas Kumar、Maiti, Manoranjan(20090600)。Utilization of Multi-Objective Genetic Algorithm for One-Item Multi-Level Inventory Distribution System。International Journal of Information and Management Sciences,20(2),291-304。new window  new window
2.Bruni, M. E.、Beraldi, P.、Guerriero, F.、Pinto, E.(2011)。A heuristic approach for resource constrained project scheduling with uncertain activity durations。Computers & Operations Research,38,1305-1318。  new window
3.Smith-Daniels, D. E.、Aquilano, N. J.(1984)。Constrained resource project scheduling subject to material constraints。Journal of Operations Management,4(4),369-388。  new window
4.Aquilano, N. J.、Smith, D. E.(1980)。A formal set of algorithms for project scheduling with critical path method-material requirements planning。Journal of Operations Management,1,57-67。  new window
5.Chen, S. M.、Griffis, F. H.、Chen, P. H.、Chang, L. M.(2012)。Simulation and analytical techniques for construction resource planning and scheduling。Automation in Construction,21,99-113。  new window
6.Dodin, B.、Elimam, A. A.(2001)。Integrated project scheduling and material planning with variable activity duration and rewards。IIE Transactions,33(11),1005-1018。  new window
7.Dodin, B.、Elimam, A. A.(2008)。Integration of equipment planning and project scheduling。European Journal of Operational Research,184(3),962-980。  new window
8.Drezet, L. E.、Billaut, J. C.(2008)。A project scheduling problem with labour constraints and time-dependent activities requirements。International Journal of Production Economics,112,217-225。  new window
9.Erbasi, A.、Sepil, C.(1999)。A modified heuristic procedure for materials management in project networks。International Journal of Industrial Engineering-Theory,6,132-140。  new window
10.Fu, F.(2014)。Integrated scheduling and batch ordering for construction project。Applied Mathematical Modelling,38,784-797。  new window
11.Kethley, R. Bryan(20081200)。Using Taguchi Loss Functions to Develop a Single Objective Function in a Multi-Criteria Context: A Scheduling Example。International Journal of Information and Management Sciences,19(4),589-600。new window  new window
12.Kyriakidis, T. S.、Kopanos, G. M.、Georgiadis, M. C.(2012)。MILP formulations for singleand multi-mode resource-constrained project scheduling problems。Computers and Chemical Engineering,36,369-385。  new window
13.梁文耀、黃俊哲(20130300)。The Genetic Algorithm with Rough Set Theory Incorporated into the Patent Composition。International Journal of Information and Management Sciences,24(1),39-55。new window  new window
14.Liu, S. S.、Wang, C. J.(2008)。Resource-constrained construction project scheduling model for profit maximization considering cash flow。Automation in Construction,17,966-974。  new window
15.Liu, Shixin、Yung, K. L.、Ip, W. H.(20071200)。Genetic Local Search for Resource-Constrained Project Scheduling under Uncertainty。International Journal of Information and Management Sciences,18(4),347-363。new window  new window
16.Long, L. D.、Ohsato, A.(2008)。Fuzzy critical chain method for project scheduling under resource constraints and uncertainty。International Journal of Project Management,26,688-698。  new window
17.Lova, A.、Tormos, P.、Cervantes, M.、Barber, F.(2009)。An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes。International Journal of Production Economics,117,302-316。  new window
18.Lu, Hai-wen、Lu, Yung-hsiang、Yang, Hui-mei(20091200)。Ordered Categorical Data in Fuzzy Ranking Applied to Service Quality for Western Restaurants。International Journal of Information and Management Sciences,20(4),505-518。new window  new window
19.Schmitt, T.、Faaland, B.(2004)。Scheduling recurrent construction。Naval Research Logistics,51,1102-1128。  new window
20.Sajadieh, Sheikh M.、Shadrokh, S.、Hassanzadeh, F.(2009)。Concurrent Project Scheduling and Material Planning: A Genetic Algorithm Approach。Scientia Iranica- Transaction E: Industrial Engineering,16,91-99。  new window
21.Smith-Daniels, D. E.、Smith-Daniels, V. L.(1987)。Optimal project scheduling with materials ordering。IIE Transactions,19,122-129。  new window
22.Wuliang, P.、Chengen, W.(2009)。A multi-mode resource-constrained discrete time-cost tradeoff problem and its genetic algorithm based solution。International Journal of Project Management,27,600-609。  new window
23.Yang, T.、Shen, Y. A.、Cho, C.、Lin, Y. R.(2012)。The use of a simulation, a hybrid Taguchi and dual response surface methods in the automated material handling system tool-to-tool strategy for a 300-mm fab。European Journal of Industrial Engineering,6,281-300。  new window
24.張文學、張海宏(20130600)。Task Assignment Optimization for the Batch Casualty Surgeries in Emergencies based on Extended Genetic Algorithm。International Journal of Information and Management Sciences,24(2),a7+117-129。new window  new window
25.Kolisch, R.(1996)。Serial and Parallel Resource-constrained Project Scheduling Methods Revisited: Theory and Computation。European Journal of Operational Research,90,320-333。  new window
圖書
1.Taguchi, Genichi(1986)。Introduction to Quality Engineering。White Plains, NY:Asian Productivity Organization, UNIPUB。  new window
2.Holland, J. H.(1975)。Adaptation in Natural and Artificial Systems: An Introductory Analysis with Application to Biology, Control, and Artificial Intelligence。MI:University of Michigan Press。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top
:::
無相關書籍
 
無相關著作
 
QR Code
QRCODE