期刊論文1. | Suganthia, L.、Samuelb, Anand A.(2012)。Energy models for demand forecasting: A review。Renewable and Sustainable Energy Reviews,16,1223-1240。 |
2. | Hamzaçebi, C.(2007)。Forecasting of Turkey's net electricity energy consumption on sectoral bases。Energy Policy,35(3),2009-2016。 |
3. | Xiao, Z.、Ye, S. J.、Zhong, B.、Sun, C. X.(2009)。BP neural network with rough set for short term load forecasting。Expert Systems with Applications,36(1),273-279。 |
4. | Zhang, G. P.(2003)。Time series forecasting using a hybrid ARIMA and neural network model。Neurocomputing,50(1),159-175。 |
5. | Hippert, H. S.、Pedreira, C. E.、Souza, R. Castro(2001)。Neural Networks for Short-term Load Forecasting: A Review and Evaluation。IEEE Trans. On Power Systems,16,44-55。 |
6. | Narayan, P. K.、Smyth, R. S.(2005)。Electricity consumption, employment and real income in Australia evidence from multivariate Granger causality tests。Energy policy,33,1109-1116。 |
7. | Ahmad, A. S.、Hassan, M. Y.、Abdullah, M. P.、Rahman, H. A.、Hussin, F.、Abdullah, H.、Saidur, R.(2014)。A review on applications of ANN and SVM for building electrical energy consumption forecasting。Renewable and Sustainable Energy Reviews,33(5),102-109。 |
8. | Erdogdu, E.(2007)。Electricity demand analysis using cointegration and ARIMA modelling: A case study of Turkey。Energy Policy,35(2),1129-1146。 |
9. | Fard, Abdollah Kavousi、Akbari-Zadeh, M. R.(2014)。A hybrid method based on wavelet, ANN and ARIMA model for short-term load forecasting。Journal of Experimental & Theoretical Artificial Intelligence,26(2),167-182。 |
10. | Khashei, M.、Bijari, M.(2011)。A novel hybridization of artificial neural networks and ARIMA models for time series forecasting。Applied Soft Computing,11(2),2664-2675。 |
11. | Chavez, S. G.、Bernat, J. X.、Coalla, H. L.(1999)。Forecasting of energy production and consumption in Asturias (northern Spain)。Energy,24(3),183-198。 |
12. | Catalao, J. P. S.、Mariano, S. J. P. S.、Mendes, V.(2007)。Short-term electricity prices forecasting in a competitive market: a neural network approach。Electric Power Systems Research,77(3),1297-1304。 |
13. | Chen, Chuen-jyh、Yang, Shih-ming、Wang, Zi-cheng(20120900)。Development of a Neuro-Fuzzy Model for Airline Passenger Forecasting。Journal of Aeronautics, Astronautics and Aviation. Series A,44(3),169-175。 |
14. | Do, L. P.、Lin, K. H.、Molnára, P.(2016)。Electricity consumption modelling: a case of Germany。Economic Modelling,55,92-101。 |
15. | Ekonomou, L.(2010)。Greek long-term energy consumption prediction using artificial neural networks。Energy,35,512-517。 |
16. | Huang S. J.、Shih, K. R.(2003)。Short-term load forecasting via ARIMA model identification including non-Gaussian process considerations。IEEE Transactions on Power Systems,18(2),673-679。 |
17. | Liu, Y. C.、Sun, S. H.、Yang, S. M.、Chuang, C.(2013)。Application of genetic algorithm in production scheduling: a case study on the food processing business。Information: An International Interdisciplinary Journal,15(12),6063-6075。 |
18. | Sarangi, P. K.、Singh, N.、Chauhan, R. K.、Singh, R.(2009)。Short term load forecasting using artificial neural network: a comparison with genetic algorithm implementation。Asian Research Publishing Network Journal of Engineering and Applied Sciences,4(9),88-93。 |
19. | Su, C. L.、Yang, S. M.、Huang, W. L.(2011)。A two-stage algorithm integrating genetic algorithm and modified newton method for neural network training in engineering systems。Expert Systems with Applications,38(10),12189-12194。 |
20. | Yalcinoz, T.、Yalcinoz, U.(2005)。Short term and medium-term power distribution load forecasting by neural networks。Energy Conversion and Management,46,1393-1405。 |
21. | Chuang, F. K.、Hung, C. Y.、Chang, C. Y.、Kuo, K. C.(2013)。Deploying ARIMA and artificial neural networks models to predict energy consumption in Taiwan。Sensor Lett,11,2333-2340。 |
22. | Deb, C.、Zhang, F.、Yang, J.、Lee, S. E.、Shah, K. W.(2017)。A review on time series forecasting techniques for building energy consumption。Renewable and Sustainable Energy Reviews,74,902-924。 |
23. | Ferreira, V. H.、Da Silva, A. P. A.(2007)。Toward estimating autonomous neural network-based electric load forecasters。IEEE T. Power. Syst.,22,1554-1562。 |
24. | Faruk, D. O.(2010)。A hybrid neural network and ARIMA model for water quality time series prediction。Eng. Appl. Artif. Intel.,23,586-594。 |
25. | Fumo, N.(2014)。A review on the basics of building energy estimation。Renew Sustain Energy Rev.,31,53-60。 |
26. | Khashei, M.、Bijar, M.(2011)。A new hybrid methodology for nonlinear time series forecasting。Modelling and Simulation in Engineering,2011,(379121)1-(379121)5。 |
27. | Martínez-Álvarez, F.、Troncoso, A.、Asencio-Cortés, G.、Riquelme, J.(2015)。A survey on data mining techniques applied to electricity related time series forecasting。Energies,8,13162-13193。 |
28. | Mat-Daut, M. A.、Hassan, M. Y.、Abdullah, H.、Rahman, H. A.、Abdullah, M. P.、Hussin, F.(2017)。Building electrical energy consumption forecasting analysis using conventional and artificial intelligence methods: a review。Renew Sustain Energy Rev.,70,1108-1118。 |
29. | Ohtsuka, Y.、Oga, T.、Kakamu, K.(2010)。Forecasting electricity demand in Japan: a bayesian spatial autoregressive ARMA approach。Comput. Stat. Data An.,54,2721-2735。 |
30. | Raza, M. Qamar、Khosravi, A.(2015)。A review on artificial intelligence based load demand forecasting techniques for smart grid and buildings。Renew Sustain Energy Rev.,50,1352-1372。 |
31. | Tan, Z.、Zhang, J.、Wang, J.、Xu, J.(2010)。Day ahead electricity price forecasting using wavelet transform combined with ARIMA and GARCH models。Appl. Energ.,87,3606-3610。 |
32. | Wang, Z.、Srinivasan, R. S.(2017)。A review of artificial intelligence based building energy use prediction: contrasting the capabilities of single and ensemble prediction models。Renew Sustain Energy Rev.,75,796-808。 |
33. | Zhao, H.、Magoulès, F.(2012)。A review on the prediction of building energy consumption。Renew Sustain Energy Rev.,16,3586-3592。 |