:::

詳目顯示

回上一頁
題名:流程型工廠單產品批量流最佳解與探索解模式之研究
書刊名:工業工程學刊
作者:邱煥能向士中
作者(外文):Chiu, Huan-nengZiang, Shih-chung
出版日期:1996
卷期:13:1
頁次:頁73-83
主題關鍵詞:最佳化生產技術批量流批量分割作業重疊瓶頸排程OPTLot streamingLot-splittingOperation-overlappingBottlenenck scheduling
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(5) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:5
  • 共同引用共同引用:0
  • 點閱點閱:14
期刊論文
1.Jacobs, F. R.、Bragg, D. J.(1988)。Repetitive Lots: Flow Time Reductions Through Sequencing and Dynamic Batch Sizing。Decision Science Journal,19(2),281-294。  new window
2.Baker, K. R.、Pyke, D. F.(1990)。Solution Procedures for the Lot Streaming Problem。Decision Sciences,21(3),475-491。  new window
3.Graves, S. C.、Kostreva, M. M.(1990)。Overlapping operations in material requirements Planning。Journal of Operations Management,6(3),283-294。  new window
4.Vickson, R. G.、Alfredsson, B. E.(1992)。Two and Three Machine Flow Shop Scheduling Problems with Equal Sized Transfer Batches。International Journal of Production Research,30,1551-1574。  new window
5.Kropp, D. H.、Smunt, T. L.(1990)。Optimal and heuristic models for lot splitting in a flow shop。Decision Sciences,21(4),691-709。  new window
6.Johnson, S. M.(1954)。Optimal two and three stage production schedules with setup times included。Naval Research Logistics Quarterly,1(1),61-68。  new window
7.Cetinkaya, F. C.、Kayaligil, M. S.(1992)。Unit sized transfer batch scheduling with setup times。Computers and Industrial Engineering,22(2),177-183。  new window
8.Hancock, T. M.(1991)。Effects of lot-splitting under various routing strategies。International Journal of Operations & Production Management,11(1),68-75。  new window
9.Stephane, D. P.、Lasserre, J. B.(1993)。An iterative procedure for lot streaming in job-shop scheduling。Computers and Industrial Engineering,25(1),231-234。  new window
10.Gelders, L. F.、Van Wassenhove, L. N.(1984)。Capacity planning in MRP, JIT and OPT: A critique。Engineering Cost and Production Economics,9,201-209。  new window
11.Granwald, H.、Striekwold, P. E. T.、Weeda, P. J.(1989)。A framework for quantitative comparison of production control concepts。International Journal of Production Research,27(2),281-292。  new window
12.Jacobs, F. R.(1983)。The OFT scheduling system: A review of a new production scheduling system。Production and Inventory Management,24,47-51。  new window
13.Karimi, I. A.(1992)。Optimal cycle times in multistage serial systems with set-up and inventory costs。Management Science,38,1467-1481。  new window
14.Lundrigan, R.(1986)。What is this thing called OPT?。Production and Inventory Management,27,2-12。  new window
15.Moily, J. P.(1986)。Optimal and heuristic procedures for component lot-splitting in multi-stage manufacturing systems。Management Science,32,113-125。  new window
16.Plcnert, G.、Best, T. D.(1986)。MRP, JIT, and OPT: What’s best?。Production and Inventory Management,2,22-28。  new window
17.Bond, T. C.(1993)。An Investigation into the Use of OPT Production Scheduling。Production Planning & Control,4(4),399-406。  new window
18.Jacobs, F. R.(1984)。OPT uncovered: many production planning and scheduling concepts can be applied with or without the software。Industrial Engineering,16(10),32-41。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top
QR Code
QRCODE