期刊論文1. | Jacobs, F. R.、Bragg, D. J.(1988)。Repetitive Lots: Flow Time Reductions Through Sequencing and Dynamic Batch Sizing。Decision Science Journal,19(2),281-294。 |
2. | Baker, K. R.、Pyke, D. F.(1990)。Solution Procedures for the Lot Streaming Problem。Decision Sciences,21(3),475-491。 |
3. | Graves, S. C.、Kostreva, M. M.(1990)。Overlapping operations in material requirements Planning。Journal of Operations Management,6(3),283-294。 |
4. | Vickson, R. G.、Alfredsson, B. E.(1992)。Two and Three Machine Flow Shop Scheduling Problems with Equal Sized Transfer Batches。International Journal of Production Research,30,1551-1574。 |
5. | Kropp, D. H.、Smunt, T. L.(1990)。Optimal and heuristic models for lot splitting in a flow shop。Decision Sciences,21(4),691-709。 |
6. | Johnson, S. M.(1954)。Optimal two and three stage production schedules with setup times included。Naval Research Logistics Quarterly,1(1),61-68。 |
7. | Cetinkaya, F. C.、Kayaligil, M. S.(1992)。Unit sized transfer batch scheduling with setup times。Computers and Industrial Engineering,22(2),177-183。 |
8. | Hancock, T. M.(1991)。Effects of lot-splitting under various routing strategies。International Journal of Operations & Production Management,11(1),68-75。 |
9. | Stephane, D. P.、Lasserre, J. B.(1993)。An iterative procedure for lot streaming in job-shop scheduling。Computers and Industrial Engineering,25(1),231-234。 |
10. | Gelders, L. F.、Van Wassenhove, L. N.(1984)。Capacity planning in MRP, JIT and OPT: A critique。Engineering Cost and Production Economics,9,201-209。 |
11. | Granwald, H.、Striekwold, P. E. T.、Weeda, P. J.(1989)。A framework for quantitative comparison of production control concepts。International Journal of Production Research,27(2),281-292。 |
12. | Jacobs, F. R.(1983)。The OFT scheduling system: A review of a new production scheduling system。Production and Inventory Management,24,47-51。 |
13. | Karimi, I. A.(1992)。Optimal cycle times in multistage serial systems with set-up and inventory costs。Management Science,38,1467-1481。 |
14. | Lundrigan, R.(1986)。What is this thing called OPT?。Production and Inventory Management,27,2-12。 |
15. | Moily, J. P.(1986)。Optimal and heuristic procedures for component lot-splitting in multi-stage manufacturing systems。Management Science,32,113-125。 |
16. | Plcnert, G.、Best, T. D.(1986)。MRP, JIT, and OPT: What’s best?。Production and Inventory Management,2,22-28。 |
17. | Bond, T. C.(1993)。An Investigation into the Use of OPT Production Scheduling。Production Planning & Control,4(4),399-406。 |
18. | Jacobs, F. R.(1984)。OPT uncovered: many production planning and scheduling concepts can be applied with or without the software。Industrial Engineering,16(10),32-41。 |