| 期刊論文1. | Kager, P. W.、Lou, S.(1989)。A robust production control policy for VLSI wafer fabrication。IEEE Transactions on Semiconductor Manufacturing,2,159-164。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 2. | Glassey, C. R.、Resende, M. G. C.(1988)。Closed-loop Job Release Control for VLSI Circuit Manufacturing。IEEE Transactions on Semiconductor Manufacturing,1(1),36-46。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 3. | Spearman, Mark L.、Woodruff, David L.、Hopp, Wallace J.(1990)。CONWIP: A Pull Alternative to Kanban。International Journal of Production Research,28(5),879-894。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 4. | Deosthali, P.、Gardel, S. S. A.、Louis, S.、Yan, H.(1992)。Testing the robustness of various production control policies in semiconductor manufacturing。IEEE Transactions on Semiconductor Manufacturing,5,1-24。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 5. | Ronen, B.、Schragenheim, E.(1990)。Drum-Buffer-Rope Shop Floor Control。Production and Inventory Management Journal,31(3),18-23。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 6. | Schragenheim, E.、Ronen, B.(1990)。Buffer Management: A Diagnostic Tool For Production Control。Production and Inventory Management Journal,Third Quarter,74-79。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 7. | Ronen, B.、Spector, Y.(1992)。Managing system constraint: a cost/ utilization approach。International Journal of Production Research,30(9),2045-2061。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 會議論文1. | Zuanich, D.、Whitney, R.、Wein, L. M.、Henderson, R.、Drake, A.、Lawton, J. W.(1990)。Workload regulating wafer release in a gaas facility。沒有紀錄。33-38。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 2. | Abraham, J. A.、Levitt, M. E.(1990)。Just-In-Time Methods for Semiconductor Manufacturing。沒有紀錄。3-9。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 學位論文1. | 黃宏文(1995)。晶圓製造廠生產作業控制策略之構建(碩士論文)。國立交通大學。 延伸查詢![new window](/gs32/images/newin.png) | 2. | 李國禎(1995)。晶圓製造廠生產規劃模式之構建,0。 延伸查詢![new window](/gs32/images/newin.png) | 3. | 鄭照明(1996)。晶圓製造廠交期指定模式之構建,0。 延伸查詢![new window](/gs32/images/newin.png) | 4. | 施盈志(1996)。晶圓製造廠在製品水準之規劃與控制,沒有紀錄。 延伸查詢![new window](/gs32/images/newin.png) | 圖書1. | Goldratt, E. M.(1990)。The Haystack Syndrome: Sifting Information Out of the Data Ocean。Croton-on-Hudson, New York:North River Press。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 2. | 大野耐一、日本能率協會(1981)。豐田生產方式與現場管理。豐田生產方式與現場管理。臺北市。 延伸查詢![new window](/gs32/images/newin.png) | 3. | 門田安宏(1987)。豐田生產體系。豐田生產體系。沒有紀錄。 延伸查詢![new window](/gs32/images/newin.png) | |