期刊論文1. | Cheng, R.、Gen, M.、Tsujimura, Y.(1996)。A tutorial survey of job-shop scheduling problems using genetic algorithms-I. representation。Computers & Industrial Engineering,30(4),983-997。 |
2. | Laarhoven, P. V.、Lenstra, J.、Arts, E.(1992)。Job shop scheduling by simulated annealing。Operations Research,40(1),113-125。 |
3. | Hutchison, J.、Leong, K.、Snyder, D.、Ward, P.(1991)。Scheduling approaches for random job shop flexible manufacturing systems。International Journal of Production Research,29(5),1053-1067。 |
4. | Nakasuka, S.、Yoshida, T.(1992)。Dynamic Scheduling System Utilizing Machine Learning as a Knowledge Acquisition Tool。International Journal of Production Research,30(2),411-431。 |
5. | Panwalkar, S. S.、Iskander, W.(1977)。A Survey of Scheduling Rules。Operations Research,25(1),45-61。 |
6. | Blackstone, J. H. Jr、Phillips, D. T.、Hogg, G. L.(1982)。A State-of-the-Art Survey of Dispatching Rules for Manufacturing Job Shop Operations。International Journal of Production Research,20(1),27-45。 |
7. | Croce, F. D.、Tadei, R.、Volta, G.(1995)。A Genetic Algorithm for the Job Shop Problem。Computers & Operations Research,22(1),15-24。 |
8. | Wu, S. D.、Wysk, R. A.(1989)。An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing。International Journal of Production Research,27(9),1603-1623。 |
9. | Chiu, C.、Yih, Y.(1995)。A learning-based methodology for dynamic scheduling in distributed manufacturing systems。International Journal of Production Research,33(11),3217-3232。 |
10. | Enns, S. T.(1995)。A dynamic forecasting model for job shop flow time prediction and tardiness control。International Journal of Production Research,33(5),1295-1312。 |
11. | Miyazaki, S.(1981)。Combined scheduling system for reducing job tardiness in a job shop。International Journal of Production Research,19,201-211。 |
12. | Cheng, T. C. E.(1985)。Analysis of flow-time in a job shop。Journal of the Operational Research Society,36,225-230。 |
13. | Enns, S. T.(1993)。Job shop flow time prediction and tardiness control using queuing analysis。International Journal of Production Research,31,2045-2057。 |
14. | Dell'Amico, M.、Trubian, M.(1993)。Applying tabu search to the job shop scheduling problem。Annals of Operational Research,41(2),231-252。 |
15. | Wan, Y. -W.(1995)。Which is better, off-line or real-time scheduling?。International Journal of Production Research,33(7),2053-2059。 |
16. | Yamamoto, M.、Nof, S. Y.(1985)。Scheduling/ rescheduling in a manufacturing operation system environment。International Journal of Production Research,23(4),705-722。 |
17. | Hutchison, J.、Khumawala, B.(1990)。Scheduling random flexible manufacturing systems with dynamic environments。Journal of Operations Management,9(3),335-351。 |
18. | Kim, Y.(1990)。A comparison of dispatching rules for job shops with multiple identical jobs, and alternative routings。International Journal of Production Research,28(5),953-962。 |
19. | Holthaus, O.、Rajendran, C.(1997)。Efficient dispatching rules for scheduling in a job shop。International Journal of Production Economics,48(1),87-105。 |
20. | Wu, S. D.、Wysk, R. A.(1988)。Multi-pass expert control system - a control/ scheduling for flexible manufacturing cells。Journal of Manufacturing Systems,7,107-120。 |
21. | Ishii, N.、Talavage, J.(1991)。A transient-based real-time scheduling algorithm in FMS。International Journal of Production Research,29(12),2501-2520。 |
22. | Thesen, A.、Lei, L.(1988)。An expert scheduling system for material handling hoists。Journal of Manufacturing System,9(3),247-252。 |
23. | Yih, Y.(1990)。Trace-driven knowledge acquisition for rule-based real time scheduling。Journal of Intelligent Manufacturing,1,217-230。 |
24. | Golovin, J. J.(1986)。A total framework for semiconductor production planning and scheduling。Solid State Technology,May,167-170。 |
25. | Gilkinson, J. C.、Rabelo, L. C.、Bush, B. O.(1995)。A real-world scheduling problem using genetic algorithms。Computers and Industrial Engineering,29(1-4),177-181。 |
26. | Sikora, R.(1996)。A genetic algorithm for integrating lot-sizing and sequencing in scheduling a capacitated flow line。Computers and Industrial Engineering,30(4),969-981。 |