:::

詳目顯示

回上一頁
題名:在緊急訂單與延遲成本考量下零工型排程問題派工法之研究
書刊名:工業工程學刊
作者:李慶恩陳昭文
作者(外文):Lee, Ching-enChen, Chaw-wen
出版日期:1999
卷期:16:1
頁次:頁129-146
主題關鍵詞:緊急訂單延遲成本派工基因演算法模擬Rush orderDelay costDispatchingGenetic algorithmSimulation
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(0) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:0
  • 共同引用共同引用:0
  • 點閱點閱:20
期刊論文
1.Cheng, R.、Gen, M.、Tsujimura, Y.(1996)。A tutorial survey of job-shop scheduling problems using genetic algorithms-I. representation。Computers & Industrial Engineering,30(4),983-997。  new window
2.Laarhoven, P. V.、Lenstra, J.、Arts, E.(1992)。Job shop scheduling by simulated annealing。Operations Research,40(1),113-125。  new window
3.Hutchison, J.、Leong, K.、Snyder, D.、Ward, P.(1991)。Scheduling approaches for random job shop flexible manufacturing systems。International Journal of Production Research,29(5),1053-1067。  new window
4.Nakasuka, S.、Yoshida, T.(1992)。Dynamic Scheduling System Utilizing Machine Learning as a Knowledge Acquisition Tool。International Journal of Production Research,30(2),411-431。  new window
5.Panwalkar, S. S.、Iskander, W.(1977)。A Survey of Scheduling Rules。Operations Research,25(1),45-61。  new window
6.Blackstone, J. H. Jr、Phillips, D. T.、Hogg, G. L.(1982)。A State-of-the-Art Survey of Dispatching Rules for Manufacturing Job Shop Operations。International Journal of Production Research,20(1),27-45。  new window
7.Croce, F. D.、Tadei, R.、Volta, G.(1995)。A Genetic Algorithm for the Job Shop Problem。Computers & Operations Research,22(1),15-24。  new window
8.Wu, S. D.、Wysk, R. A.(1989)。An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing。International Journal of Production Research,27(9),1603-1623。  new window
9.Chiu, C.、Yih, Y.(1995)。A learning-based methodology for dynamic scheduling in distributed manufacturing systems。International Journal of Production Research,33(11),3217-3232。  new window
10.Enns, S. T.(1995)。A dynamic forecasting model for job shop flow time prediction and tardiness control。International Journal of Production Research,33(5),1295-1312。  new window
11.Miyazaki, S.(1981)。Combined scheduling system for reducing job tardiness in a job shop。International Journal of Production Research,19,201-211。  new window
12.Cheng, T. C. E.(1985)。Analysis of flow-time in a job shop。Journal of the Operational Research Society,36,225-230。  new window
13.Enns, S. T.(1993)。Job shop flow time prediction and tardiness control using queuing analysis。International Journal of Production Research,31,2045-2057。  new window
14.Dell'Amico, M.、Trubian, M.(1993)。Applying tabu search to the job shop scheduling problem。Annals of Operational Research,41(2),231-252。  new window
15.Wan, Y. -W.(1995)。Which is better, off-line or real-time scheduling?。International Journal of Production Research,33(7),2053-2059。  new window
16.Yamamoto, M.、Nof, S. Y.(1985)。Scheduling/ rescheduling in a manufacturing operation system environment。International Journal of Production Research,23(4),705-722。  new window
17.Hutchison, J.、Khumawala, B.(1990)。Scheduling random flexible manufacturing systems with dynamic environments。Journal of Operations Management,9(3),335-351。  new window
18.Kim, Y.(1990)。A comparison of dispatching rules for job shops with multiple identical jobs, and alternative routings。International Journal of Production Research,28(5),953-962。  new window
19.Holthaus, O.、Rajendran, C.(1997)。Efficient dispatching rules for scheduling in a job shop。International Journal of Production Economics,48(1),87-105。  new window
20.Wu, S. D.、Wysk, R. A.(1988)。Multi-pass expert control system - a control/ scheduling for flexible manufacturing cells。Journal of Manufacturing Systems,7,107-120。  new window
21.Ishii, N.、Talavage, J.(1991)。A transient-based real-time scheduling algorithm in FMS。International Journal of Production Research,29(12),2501-2520。  new window
22.Thesen, A.、Lei, L.(1988)。An expert scheduling system for material handling hoists。Journal of Manufacturing System,9(3),247-252。  new window
23.Yih, Y.(1990)。Trace-driven knowledge acquisition for rule-based real time scheduling。Journal of Intelligent Manufacturing,1,217-230。  new window
24.Golovin, J. J.(1986)。A total framework for semiconductor production planning and scheduling。Solid State Technology,May,167-170。  new window
25.Gilkinson, J. C.、Rabelo, L. C.、Bush, B. O.(1995)。A real-world scheduling problem using genetic algorithms。Computers and Industrial Engineering,29(1-4),177-181。  new window
26.Sikora, R.(1996)。A genetic algorithm for integrating lot-sizing and sequencing in scheduling a capacitated flow line。Computers and Industrial Engineering,30(4),969-981。  new window
圖書
1.Baker, K. R.(1974)。Introduction to Sequencing and Scheduling。New York, NY:John Wiley & Sons。  new window
2.Holland, J. H.(1975)。Adaptation in Natural and Artificial Systems: An Introductory Analysis with Application to Biology, Control, and Artificial Intelligence。MI:University of Michigan Press。  new window
3.Coffman, E.(1976)。Computer and job-shop scheduling theory。Wiley。  new window
4.Morton, T.、Pentico, D.(1993)。Heuristic scheduling systems - With application to a production systems and project management。Heuristic scheduling systems - With application to a production systems and project management。New York, NY。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top
QR Code
QRCODE