期刊論文1. | Cooper, J. C.(1993)。Logistics Strategies for Global Businesses。International Journal of Physical Distribution & Logistics Management,23(4),12-23。 |
2. | Pagh, J. D.、Cooper, M. C.(1998)。Supply Chain Postponement and Speculation Strategies: How to Choose The Right Strategy: How to Choose The Right Strategy。Journal of Bminess Logistics,19(2),13-33。 |
3. | Bogaschewsky, R. W.、Buscher, U. D.、Lindner, G.(2001)。Optimizing multi-stage production with constant lot size and varying number of unequal sized batches。Omega,29,183-191。 |
4. | Feitzinger, E.、Lee, H. L.(1997)。Mass Customization at Hewlett-Packard: The Power of Postponement。Harvard Business Review,75(1),116-121。 |
5. | Zinn, W.、Bowersox, D. J.(1988)。Planning Physical Distribution with The Principle of Postponement。Journal of Business Logistics,9(2),117-135。 |
6. | Dapiran, P.(1993)。Benetton-global Logistics in Action。International Journal of Physical Distribution & Logistics Management,23(1),1-5。 |
7. | Yang, B.、Burns, N.(2003)。Implications of Postponement for the Supply Chain。International Journal of Production Research,41(9),2075-2090。 |
8. | Takeda, K.、Kuroda, M.(1997)。Analysis of Multi-stage Production and Inventory System with an Acceptable Response Time。Computers & Industrial Engineering,33(3/ 4),725-728。 |
9. | Wu, S. Y.(2004)。Analysis of Multistage Production-inventory Systems with Variable Production Rate。Journal of Commercial Modernizations,3(1),16-21。 |
10. | Nagaraj, P.、Selladurai, V.(2002)。Analysis of Optimum Batch Size in Multistage, Multifacility and Multiproduct Manufacturing Systems。The International Journal of Advanced Manufacturing Technology,19,117-124。 |
11. | Kimura, O.、Terada, H.(1981)。Design and Analysis of Pull System, A Method of Multi-stage Production Control。International Journal of Production Research,19(3),241-253。 |
12. | Goyal, S. K.(1977)。Economic Batch Quantity in a Multi-stage Production System。International Journal of Production Research,16,267-273。 |
13. | Lee, H. L.、Billington, C.、Carter, B.(1993)。Hewlett-Packard Gains Control of Inventory and Service through Design for Localization。Interfaces,23,1-11。 |
14. | Ding, H.(1994)。Initial Order Quantities in Multistage Serial Production Systems。International Journal of Production Economics,35(1-3),277-284。 |
15. | Lee, H. L.、Tang, C. S.(1997)。Modeling the Costs and Benefits of Delay Product Differentiation。Management Science,43(1),40-54。 |
16. | Lee, S. D.、Rung, J. M.(2000)。Production Lot Sizing in Failure Prone Two-stage Serial System。European Journal of Operational Research,123,42-60。 |
17. | Houshyar, A.(1992)。Single Product Multistage Production with Material Handler and Central Storage。International Journal of Production Research,30(2),353-367。 |