:::

詳目顯示

回上一頁
題名:運用層級式在製存貨控制於半導體供應鏈管理研究
書刊名:管理學報
作者:郭瑞祥 引用關係蔣明晃 引用關係楊博鈞
作者(外文):Guo, Ruey-shanChiang, DavidYang, Po-chun
出版日期:2008
卷期:25:6
頁次:頁679-698
主題關鍵詞:半導體供應鏈層級式在製存貨CONWIPSemiconductor supply chainEchelon WIP inventory
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(2) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:2
  • 共同引用共同引用:0
  • 點閱點閱:41
期刊論文
1.Clark, A. J.、Scarf, H.(1960)。Optimal Policies for a Multi-Echelon Inventory Problem。Management Science,6(4),475-490。  new window
2.Axsatar, S.、Juntti, L.(1996)。Comparison of echelon stock and installation stock policies for two level inventory system。International Journal of Production Economics,45(1-3),303-310。  new window
3.Leachman, R. C.、Benson, R. F.、Liu, Chihwei、Raar, D. J.(1996)。IMPReSS: An Automated Production-Planning and Delivery-Quotation System at Harris Corporation - Semiconductor Sector。Interfaces,26(1),6-37。  new window
4.Diks, E. B.、De Kok, A. G.(1998)。Optimal Control of a Divergent Multi-echelon Inventory System。European Journal of Operational Research,111(1),75-97。  new window
5.Kingsman, B.、Hendry, L.(2002)。The Relative Contributions of Input and Output Controls on the Performance of a Workload Control System in Maketo-order Companies。Production Planning & Control,13(7),579-590。  new window
6.Wu, Kan(2005)。An Examination of Variability and Its Basic Properties for a Factory。IEEE Transactions on Semiconductor Manufacturing,18(1),214-221。  new window
7.Heijden, M.、Diks, E. B.、De Kok, T.(1999)。Inventory Control in Multi-echelon Divergent Systems with Random Lead Times。OR Spectrum,21(3),331-359。  new window
8.Koukoumialos, S.、Liberopoulos, G.(2005)。An Analytical Method for the Performance Evaluation of Echelon Kanban Systems。OR Spectrum,27(2/ 3),339-368。  new window
9.Vob, S.、Pahl, J.、Woodruff, D. L.(2005)。Production Planning with Load Dependent Lead Time。A Quarterly Journal of Operations Research,3(4),257-302。  new window
10.Chen, C. Y. J.、George, E. I.、Tardif, V.(2001)。A Bayesian Model of Cycle Time Prediction。IIE Transactions,33(10),921-930。  new window
11.Minner, S.、Diks, E. B.、De Kok, A. G.(2003)。A Two-echelon Inventory System with Supply Lead Time Flexibility。IIE Transactions,35(2),117-129。  new window
12.Bonvik, A. M.、Couch, C. E.(1997)。Comparison of Production-line Control Mechanisms。International Journal of Production Research,35(3),789-804。  new window
13.Axsater, S.、Rosling, K.(1993)。Notes: Installation vs. Echelon Stock Policies for Multilevel Inventory Control。Management Science,39(10),1274-1280。  new window
14.Liberopoulos, G.、Dallery, Y.(2003)。Comparative Modeling of Multi-stage Production-inventory Control Policies with Lot Sizing。International Journal of Production Research,41(6),1273-1298。  new window
15.Chen, F.(1998)。Echelon Reorder Points, Installation Reorder Points, and the Value of Centralized Demand Information。Management Science,44(12),221-234。  new window
16.Lagodimos, A. G.、De Kok, A. G.、Verrijdt, J. H. C. M.(1995)。The Robustness of Multi-echelon Service Models under Autocorrelated Demands。The Journal of the Operational Research Society,46(1),92-103。  new window
17.Karaesmen, F.、Dallery, Y.(2000)。Performance Comparison of Pull Type Control Mechanisms for Multi-stage Manufacturing。International Journal of Production Economics,68(1),59-71。  new window
18.Ovalle, O. R.、Marquez, A. C.(2003)。Exploring the Utilization of a CONWIP System for Supply Chain Management: A Comparison with Fully Integrated Supply Chains。International Journal of Production Economics,83(2),195-215。  new window
19.Verrijdt, J. H. C. M.、De Kok, A. G.(1996)。Distribution Planning for a Divergent Depotless Two-echelon Network under Service Constraints。European Journal of Operational Research,89(2),341-354。  new window
20.Diks, E. B.、De Kok, A. G.、Lagodimos, A. G.(1996)。Multi-echelon Systems: A Service Measure Perspective。European Journal of Operational Research,95(2),241-263。  new window
會議論文
1.Martin, D. P.(1998)。The Advantages of Using Short Cycle Time Manufacturing (SCM) Instead of Continuous Flow Manufacturing (CFM)。0。43-49。  new window
2.Barahona, M.、Doherty, A. C.、Sznaier, M.、Mabuchi, H.、Doyle, J. C.(2002)。Finite Horizon Model Reduction and the Appearance of Dissipation in Hamiltonian Systems。0。4563-4568。  new window
3.Johnishi, S.、Ozawa, K.、Satoh, N.(2002)。Dynamic XFactor Application for Optimizing Lot Control for Agile Manufacturing。0。281-284。  new window
4.Guo, R.、Chiang, D.、Yang, P.(2006)。Supply Chain Inventory Control in Semiconductor Manufacturing。0。66-69。  new window
5.Glassey, C. R.、Petrakian, R. G.(1989)。The Use of Bottleneck Starvation Avoidance with Queue Predictions in Shop Floor Control。0。908-917。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top
QR Code
QRCODE