Two types of train control system are used in the Taipei MRT: One is a traditional fixed block system for the high-capacity transit system; the other, the Communications-based Train Control (CBTC) System, is for the medium-capacity transit system. The Wenhu line is the first Taipei MRT project to use the CBTC system. Using less equipment in trackside and signaling equipment rooms (SERs) than the traditional fixed block system, the CBTC system causes less impact on the commercial service during retrofitting. This paper introduces comparison between these two types of train control systems.