:::

詳目顯示

回上一頁
題名:橋樑定期檢測作業排程最佳化模式之研究
書刊名:運輸計劃
作者:顏上堯范琇綾陳怡君
作者(外文):Yan, ShangyaoFan, Hsiu-lingChen, Yi-chun
出版日期:2016
卷期:45:1
頁次:頁63-79
主題關鍵詞:橋樑定期檢測作業排程含額外限制之整數網路流動問題啟發解法Regular bridge inspectionRouting and schedulingNetwork flow problem with side constraintsHeuristic algorithm
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(0) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:0
  • 共同引用共同引用:0
  • 點閱點閱:16
期刊論文
1.Yan, S.、Wang, S. S.、Wu, M. W.(2012)。A Model with a Solution Algorithm for the Cash Transportation Vehicle Routing and Scheduling Problem。Computers and Industrial Engineering,63(2),464-473。  new window
2.Yan, S.、Tang, C. H.、Fu, T. C.(2008)。An Airline Scheduling Model and Solution Algorithms under Stochastic Demands。European Journal of Operational Research,190(1),22-39。  new window
3.Barnhart, C.、Johnson, E. L.、Nemhauser, G. L.、Savelsbergh, M. W. P.、Vance, P. H.(1998)。Branch-and-price: column generation for solving huge integer programs。Operations Research,46(3),316-329。  new window
4.顏上堯、姜蔚宗(20130900)。公路橋梁檢測最佳化模式分析。臺灣公路工程,39(9),2-42。  延伸查詢new window
5.Dai, K.、Smith, H. B.、Chen, S. E.、Sun, L.(2014)。Comparative Study of Bridge Management Programmes and Practices in the USA and China。Structure and Infrastructure Engineering,10(5),577-588。  new window
6.Matos, A. C.、Oliveira R. C.(2004)。An Experimental Study of the Ant Colony System for the Period Vehicle Routing Problem。Lecture Notes in Computer Science,3172,286-293。  new window
7.Wen, M.、Cordeau, J. F.、Laporte, G.、Larsen, J.(2010)。The Dynamic Multi-Period Vehicle Routing Problem。Computers and Operations Research,37(9),1615-1623。  new window
8.Yu, B.、Yang, Z. Z.(2011)。An Ant Colony Optimization Model: The Period Vehicle Routing Problem with Time Windows。Transportation Research Part E,47(2),166-181。  new window
9.Yan, S.、Chen, S. C.、Chen, C. H.(2006)。Air Cargo Fleet Routing and Timetable Setting with Multiple On-Time Demands。Transportation Research Part E,42(5),409-430。  new window
10.Yan, Shangyao、Shih, Yu-Lin(20070100)。A Time-Space Network Model for Work Team Scheduling after a Major Disaster。中國工程學刊,30(1),63-75。  new window
11.Lu, H. A.、Chen, C. Y.(2011)。A Time-Space Network Model for Unit Load Device Stock Planning in International Airline Services。Journal of Air Transport Management,17(2),94-100。  new window
12.Yan, S.、Hsiao, F. Y.、Guo, J. J.、Chen, Y. C.(2011)。Effective Aircraft Maintenance Schedule Adjustment Following Incidents。Transportation Planning and Technology,34(8),727-745。  new window
13.Yan, S.、Chen, C. Y.、Chang, S. C.(2014)。A Carpooling Model and Solution Method with Stochastic Vehicle Travel Times。IEEE Transactions on Intelligent Transportation Systems,15(1),47-61。  new window
14.Yan, S.、Wang, S. S.、Chang, Y. H.(2014)。Cash Transportation Vehicle Routing and Scheduling under Stochastic Travel Times。Engineering Optimization,46(3),289-307。  new window
學位論文
1.延允中(2004)。橋梁維護管理機制、成效查核與經費編列探討-以公路總局為例(碩士論文)。國立中央大學。  延伸查詢new window
2.吳秋木(2006)。橋梁目視檢測系統安全因子篩選之研究(碩士論文)。國立嘉義大學。  延伸查詢new window
3.柴志傑(2009)。臺灣地區橋梁目視檢測行程最佳化之研究(碩士論文)。國立中央大學。  延伸查詢new window
圖書
1.交通部公路總局(2012)。公路養護手冊。  延伸查詢new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top
QR Code
QRCODE