Facing the progress of the technology era, and the improvement of the factory has become increasingly important, in order to ensure the competition of enterprises, in addition to the focus on product quality and cost reduction, the quasi-delivery period is becoming more and more important. In order to enhance their competitive advantage, improve delivery speed, improve production system and reduce production time compared with other competitors, It is important to achieve the best reach, so this study uses system simulation software to improve the current plant's own planning, how to get the best production capacity, which is an industry that can strengthen its own essence and make a quick response to customers. This study takes the embossing wheel industry as a research case, the analysis and study of its production process, with the Arena system model simulations software into a case production model of the mold simulations structure, and choose the six time-consuming workstation as the experiment factor as well as the intersection rate and the production time as the two response variable of this study.