| 期刊論文1. | 孫智陸(19930900)。生命週期利潤、成本、產品供給及要素需求之系統分析。經濟論文,21(2),425-467。 延伸查詢 | 2. | 陳堯、劉崇堅(19920700)。價格上限管制制度及其在國內電信事業實施可能性初探。經社法制論叢,10,143-158。 延伸查詢 | 3. | Balestra, P.、Nerlove, M.(1966)。Pooling Cross Section and Time Series Data in Estimation of a Dynamic Model: The Demand for Natural Gas。Econometrica,34(3),585-612。 | 4. | Epstein, L. G.、Yatchew, A. J.(1985)。The Empirical Determination of Technology and Expectations: A Simplified Procedure。Journal of Econometrics,27(2),235-258。 | 5. | Kennan, J.(1979)。The Estimation of Partial Adjustment Models with Rational Expectations。Econometrica,47,1441-1456。 | 6. | Kolstad, C. D.、Lee, J.-K.(1993)。The Specification of Dynamics in Cost Function and Factor Demand Estimation。The Review of Economics and Statistics,75(4),721-726。 | 7. | Kokkelenberg, E. C.(1984)。The Specification and Estimation of Interrelated Factor Demands Under Uncertainty。Journal of Economic Dynamics and Control,7,181-207。 | 8. | Kollintzas, T.(1985)。The Symmetric Linear Rational Expectations Model。Econometrica,53,963-976。 | 9. | Kollintzas, T.(1986)。A Non-recursive Solution for the Linear Rational Expectations Models。Journal of Economic Dynamics and Control,10,327-332。 | 10. | Lee, Y. J.、Nah, H. S.、Lee, D. S.(1994)。A Study on the Production Structure for the Japanese, Korean and Taiwanese Manufacturing Industries: An Interrelated Factor Demand Model Approach。Journal of Economic Development,19,107-136。 | 11. | Mohen, P. A.、Nadiri, M. I.、Prucha, I. R.(1986)。Production Structure and Rates of Return in the U. S., Japanese and German Manufacturing Sectors: A Non-separable Dynamic Factor Demand Model。European Economic Review,30,749-771。 | 12. | Morrison, C.、Berndt, E.(1981)。Short-run Labor Productivity in a Dynamic Model。Journal of Econometrics,15,339-365。 | 13. | Nadiri, M. I.、Rosen, M. S.(1969)。Interrelated Factor Demand Functions。American Economic Review,59,457-471。 | 14. | Nadiri, I. M.、Prucha, I. R.(1996)。Endogenous Capital Utilization and Productivity Measurement in Dynamic Factor Demand Models Theory and an Application to the U. S. Electrical Machinery Industry。Journal of Econometrics,71,343-379。 | 15. | Pindyck, R. S.、Rotemberg, J. J.(1983)。Dynamic Factor Demands Under Rational Expectations。Scandinavian Journal of Economics,85,223-238。 | 16. | Pindyck, R. S.、Rotemberg, J. J.(1983)。Dynamic Factor Demands and the Effects of Energy Price Shocks。American Economic Review,73,1066-1079。 | 17. | Prucha, I. R.、Nadiri, M. I.(1986)。A comparison of alternative methods for the estimation of dynamic factor demand models under non-static expectations。Journal of Econometrics,33,187-211。 | 18. | Sargent, Thomas J.(1978)。Estimation of Dynamic Labor Demand Schedules Under Rational Expectation。Journal of Political Economy,86(6),1009-1044。 | 19. | Treadway, A. B.(1974)。The Globally Optimal Flexible Accelerator。Journal of Economic Theory,7(1),17-39。 | 20. | 劉崇堅(19960300)。新電信法之事業行為管制分析。臺灣經濟研究月刊,19(3)=219,27-32。 延伸查詢 | 21. | Hansen, Lars Peter、Singleton, Kenneth J.(1982)。Generalized Instrumental Variables Estimation of Nonlinear Rational Expectations Models。Econometrica,50(5),1269-1286。 | 會議論文1. | 蔡蕙安(1998)。台灣本國銀行之實證模型研究--涵括調整成本與多維風險之分析。台灣經濟學會年會,249-277。 延伸查詢 | 研究報告1. | 鄭秀玲、林宇庭(1994)。台灣電信事業技術變動之經濟分析。 延伸查詢 | 2. | 蔡蕙安(1997)。台灣產業動態實証模型 (計畫編號:NSC86-2415-E-110-006)。 延伸查詢 | 3. | Nadiri, I. M.、Prucha, I. R.(1989)。Dynamic Factor Demand Models, Productivity Measurement, and Rates of Return: Theory and An Empirical Application to the U. S. Bell System。 | 圖書1. | Norsworthy, J. R.、Tsai, D. H.(1998)。Macroeconomic Policy as Implicit Industrial Policy: Its Industry and Enterprise Effects。Boston:Dordrecht:London:Kluwer Academic Publishers。 | 圖書論文1. | Denny, M.、Fuss, M.、Waverman, L.(1981)。Substitution Possibilities for Energy: Evidence from U.S. and Canadian Manufacturing Industries。Modeling and Measuring National Resource Substitution。Cambridge:MIT Press。 | 2. | Hansen, L. P.、Sargent, T. J.(1981)。Linear Rational Expectations Models for Dynamically Interrelated Variables。Rational Expectations and Econometric Practice。University of Minnesota Press。 | 3. | Nadiri, M. I.、Schankerman, M. A.(1979)。The Structure of Production, Technological Change, and the Rate of Growth of Total Factor Productivity in the U. S. Bell System。Productivity Measurement in Regulated Industries。New York:Academic Press。 | |