期刊論文1. | Barlow, Richard、Hunter, Larry(1960)。Optimum Preventive Maintenance Policies。Operations Research,8(1),90-100。 |
2. | Yao, J. S.、Wu, K.(2000)。Ranking fuzzy numbers based on decomposition principle and signed distance。Fuzzy Sets and Systems,116(2),275-288。 |
3. | Jammernegg, W.、Reiner, G.(2007)。Performance Improvement of Supply Chain Processes by Coordinated Inventory and Capacity Management。International Journal of Production Economics,108(1/2),183-190。 |
4. | Banerjee, Avijit(1986)。A joint economic-lot-size model for purchaser and vendor。Decision Sciences,17(3),292-311。 |
5. | Goyal, S. K.(1977)。An Integrated Inventory Model for a Single Supplier-Single Customer Problem。International Journal of Production Research,15(1),107-111。 |
6. | Olson, D. L.、Xie, M.(2010)。A comparison of coordinated supply chain inventory management systems。International Journal of Services and Operations Management,6(1),73-88。 |
7. | Goyal, S. K.(1988)。"A joint economiclotsize model for purchaser and vendor": A comment。Decision Sciences,19(1),236-241。 |
8. | Pan, J. H.、Yang, M. F.(2008)。Integrated inventory models with fuzzy annual demand and fuzzy production rate in a supply chain。International Journal of Production Research,46(3),753-770。 |
9. | Chiu, C. Y.、Lin, Y.、Yang, M. F.(2014)。Applying fuzzy multiobjective integrated logistics model to green supply chain problems。Journal of Applied Mathematics,2014。 |
10. | Yang, M. F.、Lo, M. C.、Chen, W. H.(2015)。Optimal Strategy for the Three-echelon Inventory System with Defective Product, Rework and Fuzzy Demand under Credit Period。Engineering Letters,23(4)。 |
11. | Sheu, S. H.、Lin, Y. B.、Liao, G. L.(2006)。Optimum policies for a system with general imperfect maintenance。Reliability Engineering & System Safety,91(3),362-369。 |
12. | Yang, Z. M.、Djurdjanovic, D.、Ni, J.(2008)。Maintenance scheduling in manufacturing systems based on predicted machine degradation。Journal of Intelligent Manufacturing,19(1),87-98。 |
13. | Tseng, S. T.(1996)。Optimal preventive maintenance policy for deteriorating production systems。IIE transactions,28(8),687-694。 |
14. | Yang, M. F.、Lin, Y.(2018)。Integrated inventory model with backorder and minimal repair in a supply chain。Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture,232(3),546-560。 |
15. | Groenevelt, Harry、Pintelon, Liliane、Seidmann, Abraham(1992)。Production Lot Sizing with Machine Breakdowns。Management Science,38(1),104-123。 |