[1] M. Athans, “The expert team of experts approach to command-and-control(C2)organizations,” IEEE Control Systems Magazine, pp.30-38, September 1982.
[2] C. R. Barrett, “Ramping up for the digital world,” Keynotes Speech of the 2001 IEEE International Symposium on Semiconductor Manufacturing, San Jose, U.S.A., October 8~10, 2001.
[3] S. Billat, “Outlook for foundries and semiconductor equipment industry,” Keynote speech in the Seventh International Symposium on Semiconductor Manufacturing, Santa Clara, CA, USA, October 11~13, 1999.
[4] J. Bisgrove et al., “Integrated test facility - Automation testing to support Intel manufacturing output,” Proceedings of Sixth International Symposium on Semiconductor Manufacturing, pp.D17-D21, San Francisco, U.S.A., October 6~8, 1997.[5] S. M. Bragg, Outsourcing, New York: John Wiley & Sons, 1998.
[6] S. P. Brandey, J. A. Hausman, and R. L. Nolan, Globalization, Technology, and Competition, Boston: Harvard Business School Press, 1993.
[7] BroadVision Inc., “Broadvision at-a-glance,” Available at URL: http://www. broadvision.com, 2000.
[8] D. E. Carter and B. S. Baker, Concurrent Engineering: The Product Development Environment for the 1990s, New York: Addison-Wesley, 1992.
[9] Morris Chang, “Future role of foundries,” Keynotes Speech of the 2001 IEEE International Symposium on Semiconductor Manufacturing, San Jose, U.S.A., October 8~10, 2001.
[10] S. -C. Chang, T. -L. Chou, R. -S. Guo, Y. -H. Su, L. -L. Lu, and I. -C. Lai, ”A dynamic binding model for service creation in virtual fab,” Proceedings of the 1998 Semiconductor Manufacturing Technology Workshop, pp.131-138, Hsinchu Taiwan R.O.C., June 16~17, 1998.
[11] S. -C. Chang, R. -S. Guo, Y. -H. Su, and I. -C. Lai, “Realizing dynamic service provisioning mechanism in available to promise,” Proceedings of the Ninth International Symposium on Semiconductor Manufacturing, pp.25-28, Tokyo Japan, September 26~28, 2000.
[12] C. Y. Chang and S. M. Sze, ULSI Technology, Singapore: McGraw-Hill, 1996.
[13] D. N. Chorafas, Manufacturing Database and Computer Integrated Systems, Boca Raton, FL: CRC press, 1993.
[14] T. H. Davenport, Process Innovation: Reengineering Work through Information Technology, Boston: Harvard Business School Press, 1993.
[15] W. H. Davidow and M. S. Malone, The Virtual Corporation: Structuring and Revitalizing the Corporation for the 21st Century, London: HarperCollins Publisher, 1993.
[16] B. Eckel, Thinking in Java(2nd ed.), New Jersey: Prentice-Hall, 2000.
[17] M. A. Emmelhainz, Electronic Data Interchange: A Total Management Guide(2nd ed.), New York: Van Nostrand Reinhold, 1993.
[18] ERSO/ITRI, “What you wish to know about Taiwan semiconductor industry,” Available at URL: http://www.tsia.org.tw/IC Industry 1999.htm, 1999.
[19] ESPRIT/AMICE, CIMOSA: Open System Architecture for CIM, Berlin: Springer-Verlag, 1993.
[20] J. A. Fitzsimmons and M. J. Fitzsimmons, Service Management: Operations, Strategy, and Information Technology(2nd ed.), New York: McGraw-Hill, 1998.
[21] S. T. Gelman, W. D. Peck, “Bringing business information to AT&T network systems through a data warehouse,” AT&T Technical Journal, March/April, pp. 68-78, 1996.
[22] L. Geppert, “The100-million-transistor IC,” IEEE Spectrum, 36(7), July 1999.
[23] J. H. Gilmore and B. J. Pine II, “The four faces of mass customization,” Harvard Business Review, pp.91-101, January-February 1997.
[24] C. Hilton, “Manufacturing operations system design and analysis,” Intel Technology Journal 4th Quarter 98, Available at URL: http://www.intel.com, 1998.
[25] Y. -C. Hsieh, N. -P. Lin, and H. -C. Chiu, “Virtual factory and relationship marketing- A case study of Taiwan Semiconductor Manufacturing Company,” International Journal of Information Management, 22(2), pp.109-126, 2002.
[26] Intel, “Expanding Moore’s law: The exponential opportunity,” Available at URL: http://www.intel.com, 2002.
[27] Industrial Technology Information Services(ITIS)of Taiwan, The Trends of IC Industry, Taipei: ITIS, 1997.
[28] G. Keller, SAP R/3 Process Modeling, New York: Addison-Wesley, 1998.
[29] E. Korczynski, “ERSO’s children grow up,” Solid State Technology, pp.s14-s15, s23-s24, February 1997.
[30] L. J. Krajewski and L. P. Ritzman, Operations Management: Strategy and Analysis, New York: Addison-Wesley, 1996.
[31] A. M. Law and W. D. Kelton, Simulation Modeling and Analysis, New York: McGraw-Hill, 1991.
[32] A. A. Lazar, K. S. Lim, and F. Marconcini, “Realizing a foundation for programmability of ATM networks with the binding architecture,” IEEE Journal on Selected Areas in Communications, 14(7), pp.1214-1227.
[33] J. Lewis, “The evolution of IP industry,” FAS Fabless Forum, 6(1), pp.23, 24, ༁, March 1999, available at URL http://www.fsa.org.
[34] P. Lippe, “An emerging SOC business model,” Electronic Business, 24(10), pp.19-20, October 1998.
[35] S. -J. Liu, “Industrial development and structural adaptation in Taiwan: Some issues of learned entrepreneurship,” IEEE Transactions on Engineering Management, 45(4), pp.338-348, November 1998.
[36] P. Losleben, Status Report on a Major Research Thrust in the Center for Integrated Systems, The Stanford Semiconductor Manufacturing Research Program, Stanford University, Feb. 1992.
[37] C. H. Lovelock, Services Marketing(3rd ed.), London: Prentice-Hall International, 1996.
[38] J. Magertta, “The power of virtual integration: An interview with Dell Computer’s Michael Dell,” Harvard Business Review, pp.73-84, March-April 1998.
[39] J. A. Mathews, “A silicon valley of the east: Creating Taiwan’s semiconductor industry,” California Management Review, 39(4), pp.26-53, 1997.
[40] C. J. McDonald, “The evolution of Intel’s Copy EXACTLY!: Technology transfer method,” Intel Technology Journal 4th Quarter 98, Available at URL: http://www.intel.com, 1998.
[41] J. McGehee, J. Hebley, and J. Mahaffey, “The MMST computer-integrated manufacturing system framework,” IEEE Transactions on Semiconductor Manufacturing, 7(2), pp.107-115, May 1994.
[42] E. S. Meieran, “21st century semiconductor manufacturing capabilities,” Intel Technology Journal Q4’98, Available at URL: http://www.intel.com, 1998.
[43] M. Melliar-Smith, “The globalization of the semiconductor industry,” SEMI Technology Symposium Keynote Address & Slides, Available at URL: http://www.sematech.org, December 2, 1998.
[44] Oracle Corporation, “Data warehousing: Turning data into decisions,” White Paper, Available at URL: http://www.oracle.com, CW Custom Publications, 1995.
[45] T. Quatrani, Visual Modeling with Rational Rose and UML, New York: Addison-Wesley, 1998.
[46] J. Rumbaugh, I. Jacobson, and G. Booch, The Unified Modeling Language Reference Manual, New York: Addison-Wesley, 1999.
[47] Sematech, Computer Integrated Manufacturing(CIM)Framework Specification Version 2.0, Technology Transfer # 93061697JA-ENG., Austin: Sematech, 1998.
[48] Sematech, CIM Framework Architecture Guide 1.0, Technology Transfer # 97103379A-ENG., Austin: Sematech, 1997.
[49] Sematech, Object-Based Equipment Model Proof of Concept, Technology Transfer #98113588A-TR, Austin: Sematech, Available at URL: http://www.sematech.org, 1998.
[50] Semiconductor Industry Association(SIA), The National Technology Roadmap For Semiconductor, San Jose: SIA, 1994.
[51] J. Shelton, “2001 wafer and packaging demand survey,” available at URL http://www.fsa.org, 2001/4/3.
[52] J. Shelton, “The history of the fabless model: From criticized to respected to preferred,” available at URL http://www.fsa.org, 2001/2/6.
[53] R. Smith, “To SIP outsource or not to SIP outsource?” Electronic News, 47(49), p.26, 2001/12/3.
[54] M. J. S. Smith, Application-Specific Integrated Circuits, New York: Addison-Wesley, 1997.
[55] Chris W. H. Strolenberg, “Can legacy data be leveraged and reused as a design asset?” FAS Fabless Forum, 6(1), pp.31-32, March 1999, available at URL http://www.fsa.org.
[56] T. J. Sturgeon, “Turn-key production networks: A new American model of industrial organization?” Working paper of Industrial Performance Center in Massachusetts Institute of Technology, November 27, 2000.
[57] A. S. Tanenbaum, Computer Network(3rd ed.), London: Prentice-Hall International, 1996.
[58] M. Thompson, “Simulation based scheduling,” IIE Solutions, pp.30-34, May 1996.
[59] F. C. Tseng, “TSMC’s semiconductor strategy,” Proceedings of the Seventh International Symposium on Semiconductor Manufacturing, pp.5-7, Tokyo Japan, October 7~9, 1998.
[60] F. C. Tseng, “Semiconductor industry evolution for 21st century,” Symposium on VLSI Circuits Digest of Technical Papers, IEEE, pp.1-4, 1999, Retrieve from the IEL database at NTU library.
[61] TSMC, TSMC 2000 Technology Symposium, Hsinchu: TSMC, 2000.
[62] TSMC, TSMC 2001 Technology Symposium: Breaking the Barriers to Integration the Leap to SOC, Hsinchu: TSMC, 2001.
[63] UMC, “UMC Group foundry service guide,” Available at URL: http://www. umc.com, 1999.
[64] UMC, UMC Technology Forum 2002, Hsinchu: UMC, 2002.
[65] D. M. Upton, and A. McAfee, “The real virtual factory,” Harvard Business Review, pp.123-133, July-August 1996.
[66] J. D. Wells, W. L. Fuerst, and J. Choobineh, “ Managing information technology (IT) for one-to-one customer interaction,” Information & Management, 35, pp.53-62, 1999.
[67] R. Wilson, “IP business model leaves core vendors vulnerable,” Electronic Engineering Times, Issue 1203, pp.1, 8, ༬, 2002/1/28.
[68] I. Wladawsky-Berger, “Turning points in information technology,” IBM System Journal, 38(2ſ), pp.449-452, 1999.
[69] G. Worchel, “Indie IP providers designing highway to the future,” Electronic News, 47(48), p.12, 2001/11/26.
[70] N. Yuhanna, Oracle8i Database Administration, Manning Publications Company, December 1999.
[71] A. S. Grove原著,王平原譯。10倍速時代(Only the Paranoid Survive),台北:大塊文化,1996。
[72] R. Turton原著,李雅明譯。IC如何創新(The Quantum Dot: A Journey into the Future of Microelectronics),台北:天下遠見出版,2000。
[73] 工研院IEK中心電子資訊研究組王弓、王興毅等編。2000半導體工業年鑑,新竹:工業技術研究院產業經濟與資訊服務中心,2000。
[74] 工研院IEK中心電子資訊研究組莊偉傑。SIP對於半導體產業的影響,新竹:工業技術研究院產業經濟與資訊服務中心,2002。
[75] 李柏毅等著。半導體趨勢圖示,台北:大椽,2000。
[76] 李柏毅等著。矽導新勢力-半導體與零組件產業趨勢,台北:大椽,2002。
[77] 李雅明。半導體的故事,台北:新新聞,1999。
[78] 拓墣產業研究所(TRi),台灣半導體IP/SOC產業的機會與挑戰《研討會》,研討會講義,台北:拓墣產業研究所,2002。
[79] 周宗廉。動態建立服務之聚結機制,台灣大學電機工程學研究所碩士論文,1998。
[80] 郭瑞祥,蘇雅惠,張時中,李元維,周宗廉,”Real competitiveness via virtual fab,”1997中華民國科技管理研討會論文集(I),pp. 156-163, 高雄,民86年11月5~6日。
[81] 張俊彥、游伯龍編著。活力:台灣如何創造半導體與個人電腦的產業奇蹟,台北:時報出版,2002。[82] 電子時報(DigiTimes),SOC時代下IC宏觀趨勢,研討會講義,台北:電子時報,2002。
[83] 廖徑嘉。物件導向模擬模型建構方法與晶圓製造系統模擬之應用,台灣大學工業工程學研究所碩士論文,1999。
[84] 蔡明介口述,林宏文採訪整理。競爭力的探求:IC設計、高科技產業實戰策略與觀察,台北:財訊出版社,2001。
[85] 賴益璋。半導體專製廠交單承諾服務建立之研究,台灣大學電機工程學研究所碩士論文,2000。
[86] 經訪談業界人士所取得之IBM講義一頁,2002。
[87] 經訪談國內IP供應商領導廠商以及兩家晶圓代工廠領導廠商後所彙整之資料,2002。
[88] 經參與國內半導體製造商與台大合作之暑期研究計畫所彙整之資料,1998。