| 期刊論文1. | Lozinski, C.、Glassey, C. R.(1988)。Bottleneck Starvation Indicators for Shop Floor Control。IEEE Transactions on Semiconductor Manufacturing,1(4),147-153。 | 2. | Hackman, S. T.、Leachman, R. C.(1989)。A General Framework for Modeling Production。Management Science,35(4),478-495。 | 3. | Spencer, M. S.、Cox, J. F., III(1995)。Master Production Scheduling Development In a Theory of Constraints Environment。Production and Inventory Management Journal,36(1),8-14。 | 4. | 洪一峰、Leachman, R. C.(1996)。A Production Planning Methodology for Semiconductor Manufacturing Based on Iterative Simulation and Linear Programming Calculations。IEEE Transactions on Semiconductor Manufacturing,9(2),257-269。 | 5. | Leachman, R. C.、Benson, R. F.、Liu, Chihwei、Raar, D. J.(1996)。IMPReSS: An Automated Production-Planning and Delivery-Quotation System at Harris Corporation - Semiconductor Sector。Interfaces,26(1),6-37。 | 研究報告1. | Leachman, R. C.(1993)。Modeling Techniques for Automated Production Planning in the Semiconductor Industry。Berkeley。 | 學位論文1. | Tzeng, W. S.(1994)。半導體製造業之訂單排程研究,0。 延伸查詢 | 圖書1. | Goldratt, E. M.(1990)。The Haystack Syndrome: Sifting Information Out of the Data Ocean。Croton-on-Hudson, New York:North River Press。 | 2. | Stein, R. E.(1996)。Re-Engineering the Manufacturing System: Applying the Theory of Constraints。New York:Marcel Dekker, Inc.。 | 3. | 李榮貴、吳鴻輝(1999)。限制驅導式現場排程與管理技術。限制驅導式現場排程與管理技術。臺北。 延伸查詢 | 4. | Liu, C.(1995)。A Methodology for Improving On-Time Delivery and Load Leveling Starts。IEEE/ SEMI Advanced Semiconductor Manufacturing Conference。沒有紀錄。 | 其他1. | Leachman, R. C.(1994)。Production Planning Scheduling Practices Across the Semiconductor Industry,Berkeley。 | |