期刊論文1. | 胡哲生、張子揚、黃浩然(20120300)。社會創業模式與社會企業資源整合的關連性。創業管理研究,7(1),1-25。 延伸查詢 |
2. | Sulivan Mort, G.、Weerawardena, J.、Carnegie, K.(2003)。Social entrepreneurship: Towards conceptualization。International Journal of Nonprofit and Voluntary Sector Marketing,8(1),76-88。 |
3. | 李郁怡(2013)。台灣社會企業三大趨勢。哈佛商業評論,84,135-143。 延伸查詢 |
4. | Metropolis, N.、Rosenbluth, A. W.、Rosenbluth, M. N.、Teller, A. H.、Teller, E.(1953)。Equation of state calculations by fast computing machines。The Journal of Chemical Physics,21(6),1087-1092。 |
5. | Martin, R. L.、Osberg, S.、Huang, S. J.(2007)。Social Entrepreneurship: The Case for Definition。Stanford Social Innovation Review,5(2),28-39。 |
6. | Dorigo, M.、Maniezzo, V.、Colorni, A.(1996)。Ant system: optimization by a colony of cooperating agents。IEEE Transactions on Systems, Man, and Cybernetics, Part B: Cybernetics,26(1),29-41。 |
7. | Baykasoğlu, A.、Gindy, Nabil N. Z.(2001)。A simulated annealing algorithm for dynamic layout problem。Computers & Operations Research,28(14),1403-1426。 |
8. | Boctor, F. F.(1996)。Resource-constrained project scheduling by simulated annealing。International Journal ofproduction Research,34(8),2335-2351。 |
9. | Bohle, Carlos、Maturana, Sergio、Vera, Jorge(2010)。A robust optimization approach to wine grape harvesting scheduling。European Journal of Operational Research,200(1),245-252。 |
10. | Elaoud, S.、Loukil, T.、Teghem, J.(2007)。The Pareto fitness genetic algorithm: Test function study。European Journal of Operational Research, Vol,177(3),1703-1719。 |
11. | Haril, Y.、Yangl, C. L.、Surysmi, E.(2012)。Maxmizing Space Utilization in Plant Factory Through Crop Scheduling。Journal Sistem lnformasi,4(3),201-206。 |
12. | Jeffcoat, D. E.、Bulfin, R. L.(1993)。Simulated annealing for resource-constrained scheduling。European Journal of Operational Research,70(1),43-51。 |
13. | Kirkpatrick, S.、Vecchi, M. P.(1983)。Optimization by simmulated annealing。science,220(4598),671-680。 |
14. | Kouvelis, P.、Chiang, W. C.(1992)。A simulated annealing procedure for single row layout problems in flexible manufacturing systems。International Journal of Production Research,30(4),717-732。 |
15. | Loukil, T.、Teghem, J.、Fortemps, P.(2007)。A multi-objective production scheduling case study solved by simulated annealing。European Journal of Operational Research,179(3),709-722。 |
16. | Mair, J.、Schoen, O.(2005)。Social entrepreneurial business models: an exploratory study。Articlein SSRN Electronic Journal。 |
17. | Recio, B.、Rubio, F.、Criado, J. A.(2003)。A decision support system for farm planning using AgriSupport II。Decision Support Systems,36(2),189-203。 |
18. | Son, J.、Skibniewski, M. J.(1999)。Multiheuristic approach for resource leve ling problem in construction engineering: Hybrid approach。Journal of construction engineering and management,125(1),23-31。 |
19. | Spoluer, J.、Maglio, P. P.(2010)。Service science: Toward a smarter planet。Introduction to service engineering,3-30。 |
20. | Suman, B.(2004)。Study of simulated annealing based algorithms for Multi-objective optimization of a constrained problem。Computers and Chemical Engineering,28(9),1849-1871。 |
21. | Wang, W.、Hwang, D.(2012)。A case study of a Government-sponsored enterprise resource planning project in a Chinese apparel company。International Journal of Enterprise Information Systems (IJEIS),8(1),63-76。 |