期刊論文1. | Jaber, M. Y.、Bonney, M.、Moualek, I.(2009)。An economic order quantity model for an imperfect production process with entropy cost。International Journal of Production Economics,118(1),26-33。 |
2. | Yoo, S. H.、Kim, D. S.、Park, M. S.(2009)。Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return。International Journal of Production Economics,121(1),255-265。 |
3. | Sana, S. S.(2010)。A production-inventory model in an imperfect production process。European Journal of Operational Research,200(2),451-464。 |
4. | Yoo, S. H.、Kim, D. S.、Park, M. S.(2012)。Lot sizing and quality investment with quality cost analyses for imperfect production and inspection processes with commercial return。International Journal of Production Economics,140,922-933。 |
5. | Cárdenas-Barrón, L. E.(2000)。Observation on: "Economic production quantity model for items with imperfect quality"。International Journal of Production Economics,64,59-64。 |
6. | Chang, H. C.(2013)。An economic production quantity model with consolidating shipments of imperfect quality items: A note。International Journal of Production Economics,144,507-509。 |
7. | Chiu, S. W.(2007)。Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging。Applied Stochastic Models in Business and Industry,23,165-178。 |
8. | Glock, C. H.、Jaber, M. Y.(2013)。A multi-stage production-inventory model with learning and forgetting effects, rework and scrap。Computers & Industrial Engineering,64,708-720。 |
9. | Groenevelt, H.、Pintelon, L.、Seidmann, A.(1992)。Production lot sizing with machine break-downs。Management Science,38,104-123。 |
10. | Hsu, J. T.、Hsu, L. F.(2013)。An EOQ model with imperfect quality items, inspection errors, shortage backordering, and sales returns。International Journal of Production Economics,143,162-170。 |
11. | Keller, G.、Noori, H.(1988)。Impact of investing in quality improvement on the lot size model。Omega International Journal of Management Sciences,16(6),595-601。 |
12. | Khan, M.、Jaber, M. Y.、Bonney, M.(2011)。An economic order quantity (EOQ) for items with imperfect quality and inspection errors。International Journal of Production Economics,133(1),113-118。 |
13. | Kulkarni, S. S.(2008)。Loss-based quality costs and inventory planning: General models and insights。European Journal of Operational Research,188,428-449。 |
14. | Ouyang, L.-Y.、Chang, C.-T.(2013)。Optimal production lot with imperfect production process under permissible delay in payments and complete backlogging。International Journal of Production Economics,144(2),610-617。 |
15. | Rezaei, J.、Salimi, N.(2012)。Economic order quantity and purchasing price for items with imperfect quality when inspection shifts from buyer to supplier。International Journal of Production Economics,137,11-18。 |
16. | Roy, A.、Maity, K.、Kar, S.、Maiti, M.(2009)。A production-inventory model with remanufacturing for defective and usable items in fuzzy-environment。Computers & Industrial Engineering,56,87-96。 |
17. | Sarker, B. R.、Jamal, A. M. M.、Mondal, S.(2008)。Optimal batch sizing in a multi-stage production system with rework consideration。European Journal of Operational Research,184,915-929。 |
18. | Sheu, S. H.、Chen, Y. C.、Wang, W. Y.、Shin, N. H.(2003)。Economic optimization of off-line inspection with inspection errors。Journal of the Operational Research Society,54,888-895。 |
19. | Su, C. H.(2012)。Optimal replenishment policy for an integrated inventory system with defective items and allowable shortage under trade credit。International Journal of Production Economics,139(1),247-256。 |
20. | Wang, C. H.(2007)。Economic off-line quality control strategy with two types of inspection errors。European Journal of Operational Research,179,132-147。 |
21. | Wang, C. H.、Dohi, T.、Tsai, W. C.(2010)。Coordinated procurement/inspection and production model under inspection errors。Computers & Industrial Engineering,59,473-478。 |
22. | Wu, C. C.、Chou, C. Y.、Huang, C.(2009)。Optimal price, warranty length and production rate for free replacement policy in the static demand market。Omega International Journal of Management Sciences,37,29-39。 |
23. | Yassine, A.、Maddah, B.、Salameh, M.(2012)。Disaggregation and consolidation of imperfect quality shipments in an extended EPQ model。International Journal of Production Economics,135,345-352。 |
24. | Zhang, Xin I. N.、Gerchak, Yigal I. G. A. L.(1990)。Joint Lot Sizing and Inspection Policy in an EOQ Model with Random Yield。IIE Transactions,22(1),41-47。 |
25. | Harris, F. W.(1913)。How Many Parts to Make at Once?。Factory: The Magazine of Management,10(2),135-136+152。 |
26. | Lee, H. L.、Rosenblatt, M. J.(1987)。Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System。Management Science,33(9),1125-1136。 |
27. | Hong, J.-D.、Hayya, J. C.(1995)。Joint investment in quality improvement and setup reduction。Computers & Operations Research,22(6),567-574。 |
28. | Ouyang, L. Y.、Wu, K. S.、Ho, C. H.(2007)。An integrated vendor-buyer inventory model with quality improvement and lead time reduction。International Journal of Production Economics,108(1/2),349-358。 |
29. | Chan, Weng Meng、Ibrahim, Raafat N.、Lochert, Paul B.(2003)。A New EPQ Model: Integrating Lower Pricing, Rework and Reject Situations。Production Planning & Control,14(7),588-595。 |
30. | Papachristos, S.、Konstantaras, I.(2006)。Economic ordering quantity models for items with imperfect quality。International Journal of Production Economics,100(1),148-154。 |
31. | El Saadany, A. M. A.、Jaber, M. Y.(2010)。A production/remanufacturing inventory model with price and quality dependant return rate。Computers & Industrial Engineering,58,352-362。 |
32. | Kim, Chang Hyun、Hong, Yushin(1999)。An optimal production run length in deteriorating production processes。International Journal of Production Economics,58,183-189。 |
33. | Raouf, A.、Jain, J. K.、Sathe, P. T.(1983)。A cost-minimization model for multicharacteristic component inspection。IIE Transactions,15(3),187-194。 |
34. | Chiu, Yuanshyi Peter(2003)。Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging。Engineering Optimization,35(4),427-437。 |
35. | Porteus, Evan L.(1986)。Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction。Operations Research,34(1),137-144。 |
36. | Salameh, M. K.、Jaber, M. Y.(2000)。Economic production quantity model for items with imperfect quality。International journal of production economics,64(1-3),59-64。 |
37. | Lee, H. L.、Rosenblatt, M. J.(1989)。A production and maintenance planning model with restoration cost dependent on detection delay。IIE Transaction,21(4),368-375。 |