期刊論文1. | Haggag, M. Y.(2009)。Cost analysis of a system involving common cause failures and preventive maintenance。Journal of Mathematics and Statistics,5(4),305-310。 |
2. | Yusuf, I.、Hussaini, N.(2012)。Evaluation of reliability and availability characteristics of 2-out-of-3 standby system under a perfect repair condition。American Journal of Mathematics and Statistics,2(5),114-119。 |
3. | Adhikary, D. D.、Bose, G. K.、Bose, D.、Mitra, S.(2013)。Maintenance class-based cost-effective preventive maintenance scheduling of coal-fired power plants。Int. J. of Reliability and Safety,7(4),358-371。 |
4. | Bhardwaj, R. K.、Chander, S.(2007)。Reliability and cost benefit analysis of 2-out-of-3 redundant system with general distribution of repair and waiting time。DIAS Technology review--An Int. J. of business and IT,4(1),28-35。 |
5. | Bhardwai, R. K.、Malik, S. C.(2010)。MTSF and Cost effectiveness of 2-out-of-3 cold standby system with probability of repair and inspection。International Journal of Engineering Science and Technology,2(1),5882-5889。 |
6. | Basudhar, A.、Missoum, S.(2013)。Reliability assessment using probabilistic support vector machines。Int. J. of Reliability and Safety,7(2),156-173。 |
7. | Chander, S.、Bhardwaj, R. K.(2009)。Reliability and economic analysis of 2-out-of-3 redundant system with priority to repair。African J. of Maths. and comp. sci.,2(11),230-236。 |
8. | Distefano, S.(2014)。Standby redundant systems: a quantitative reliability perspective。Int. J. of Reliability and Safety,8(1),70-93。 |
9. | Gurov, S. V.、Utkin, L. V.(2012)。Load-share reliability models with the piecewise constant load。Int. J. of Reliability and Safety,6(4),338-353。 |
10. | Kiran, C. P.、Clement, S.、Agrawal, V. P.(2013)。Mechatronic system reliability modelling and analysis: a graph theoretic approach。Int. J. of Reliability and Safety,7(2),128-155。 |
11. | Liu, Y.、Lu, N.、Noori, M.、Yin, X.(2014)。System reliability-based optimisation for truss structures using genetic algorithm and neural network。Int. J. of Reliability and Safety,8(1),51-69。 |
12. | Mahmoud, M. A. W.、Moshref, M. E.(2010)。On a two-unit cold standby system considering hardware, human error failures and preventive maintenance。Mathematical and Computer Modelling,51(5/6),736-745。 |
13. | Mujahid, S. N.、Rahim, M. Abdur(2010)。Optimal preventive maintenance warranty policy for repairable products with periodically increasing failure rate。Int. J. of Operational Research,9(2),227-240。 |
14. | Nourelfath, M.、Fitouhi, M. C.、Machani, M.(2010)。An integrated model for production and preventive maintenance planning in multi-state systems。IEEE Transactions on Reliability,59(3),496-506。 |
15. | Uemura, T.、Dohi, T.、Kaio, N.(2010)。Availability Analysis of an Intrusion Tolerant Distributed Server System With Preventive Maintenance。IEEE Transactions on Reliability,59(1),18-29。 |
16. | Upadhyay, N.、Deshpande, B. M.、Vishnu, P.、Agarwal, V. P.(2013)。Reliability modelling and analysis of componentbased software system: a graph theoretic systems approach。Int. J. of Reliability and Safety,7(2),174-199。 |
17. | Wang, K.-H.、Hsieh, C.-H.、Liou, C.-H.(2006)。Cost benefit analysis of series systems with cold standby components and a repairable service station。Quality Technology & Quantitative Management,3(1),77-92。 |
18. | Wang, S.(2013)。Integrated model of production planning and imperfect preventive maintenance policy for single machine system。Int. J. of Operational Research,18(2),140-156。 |
19. | Wu, S.、Zuo, M. J.(2010)。Linear and Nonlinear Preventive Maintenance Models。IEEE Transactions on Reliability,59(1),242-249。 |
20. | Yusuf, I.(2013)。Comparison of some reliability characteristics between redundant systems requiring supporting units for their operation。Journal of Mathematical and Computational Sciences,3(1),216-232。 |
21. | Yusuf, I.、Yusuf, B.、Lawan, M. A.(2014)。Mathematical Modeling Approach to Analyzing Mean Time to System Failure of Two Unit Cold Standby System with a Supporting Device and Repairable Service Station。Open Journal of Mathematical Modeling,2(2),7-15。 |
22. | 王國雄、郭清章(2000)。Cost and Probabilistic Analysis of Series Systems with Mixed Standby Components。Applied Mathematical Modelling,24,957-967。 |