| 期刊論文1. | Andrade, P. F.、Pereira, V. G.、DelConte, E. G.(2015)。Value stream mapping and lean simulation: a case study in automotive company。International Journal of Advanced Manufacturing Technology,85,547-555。 | 2. | Azizi, A.(2015)。Designing a future value stream mapping to reduce lead time using SMED a case study。Procedia Manufacturing,2,153-158。 | 3. | Belokar, R. M.、Kumar, V.、Kharb, S. S.(2012)。An application of value stream mapping in automotive industry: a case study。International Journal of Innovative Technology and Exploring Engineering,1,231-236。 | 4. | Gjeldum, N.、Veza, I.、Bilic, B.(2011)。Simulation of production process reorganized with Value Stream Mapping。Technical Gazette,18,341-347。 | 5. | Ketan, H. S.、Yasir, F. M.(2015)。Reducing of manufacturing lead time by implementation of lean manufacturing principles。Journal of Engineering,21,83-99。 | 6. | Prasad, S.、Sharma, S. K.(2015)。Application of value stream mapping for lean implementation: a case study from Indian foundry industry。International Journal of Lean Enterprise Research,1,373-392。 | 7. | Samad, M. A.、Alam, S. M.、Tusnim, N.(2013)。Value Stream Mapping To Reduce Manufacturing Lead Time In A Semi-Automated Factory。Asian Transactions on Engineering,2,22-28。 | 8. | Stadnicka, D.、Antonelli, D.(2015)。Application of value stream mapping and possibilities of manufacturing processes simulations in automotive industry。Faculty of Mechanical Engineering Transactions,43,279-286。 | 會議論文1. | Coppini, N. L.、Bekesas, L. C.、Baptista, E. A.、Junior, M. V.、Lucato, W. C.(2011)。Value Stream mapping simulation using ProModel software575-579。 | 2. | Khafaji, K. H.、Rufaifi, M. R.(2012)。A case study of production improvement by using lean with simulation modeling271-279。 | 圖書1. | Womack, J. P.、Jones, D. T.(1996)。Lean thinking: Banish Waste and Create Wealth in Your corporation。Simon & Schuster。 | 2. | Rother, M.、Shook, J.(2003)。Learning to see: Value stream mapping to create value and eliminate muda。The Lean Enterprise Institute。 | |