英文部分
1.Abo-Sinna, M. A., Amer, A. H., & Ibrahim, A. S. (2008). Extensions of TOPSIS for Large Scale Multi-objective Non-linear Programming Problems with Block Angular Structure, Applied Mathematical Modelling, 32, 292-302.
2.Ahmed, Z. U., Mohamed, O., Johnson, J. P., & Meng, L. Y. (2002). Export Promotion Programs of Malaysian Firms: An International Marketing Perspective, Journal of Business Research, 55(10), 831-843.
3.Altman, E. I. (1968). Financial Ratios, Discrimination Analysis and the Prediction of Corporate Bankruptcy, Journal of Finance, 23(4), 589-609.
4.Asamow, E. (1995). Measuring the Hidden Risk in Corporate, Commercial Lending Review, 10(1), 24-32.
5.Bertolini, M. & Bevilacqua, M. (2006). A Combined Goal Programming-AHP Approach to Maintenance Selection Problem, Reliability Engineering and System Safety, 91(7), 839-848.
6.Brzezinski, J. R. & Knafl, G. J. (1999). Logistic Regression Modeling for Context-based Classification, IEEE Computer Society, 755-759.
7.Buyukozkan, G., Ertay, T., Kahraman, C., & Ruan, D. (2004). Determining the Importance Weights for the Design Requirements in the House of Quality Using the Fuzzy Analytic Network Approach, International Journal of Intelligent Systems, 19(5), 443-461.
8.Capon, N. (1982). Credit Scoring Systems: A Critical Analysis, Journal of Marketing, 46, 82-91.
9.Cebeci, U. (2009). Fuzzy AHP-based Decision Support System for Selecting ERP Systems in Textile Industry by Using Balanced Scorecard, Expert Systems with Applications, 36, 8900-8909.
10.Chan, L. & Yee, C. (2006). An Analytic Hierarchy Framework for Evaluating Balanced Scorecards of Healthcare Organizations, Canadian Journal of Administrative Sciences, 23, 85-104.
11.Chang, Y. H., Wey, W. M., & Tseng, H. Y. (2009). Using ANP Priorities with Goal Programming for Revitalization Strategies in Historic Transport: A Case Study of the Alishan Forest Railway, Expert Systems with Applications, 36, 8682-8690.
12.Chang, C. W., Wu, C. R., & Lin, H. L. (2009). Applying Fuzzy Hierarchy Multiple Attributes to Construct an Expert Decision Making Process, Expert Decision Making Process, 36, 7363-7368.
13.Cheng, E. W. L. & Li, H. (2004). Contractor Selection Using the Analytic Network Process, Construction Management and Economics, 22, 1021-1032.
14.Chen, J. K. & Chen, I. S. (2009). TQM Measurement Model for the Biotechnology Industry in Taiwan, Expert Systems with Applications, 36, 8789-8798.
15.Daniel, T. & Bengt, L. (2005). Aggregate Analysis of Manufacturing Systems Using System Dynamics and ANP, Computers and Industrial Engineering, 49, 98-117.
16.Dağdeviren, M., Yavuz, S., & Kilinc, N. (2009). Weapon Selection Using the AHP and TOPSIS Methods under Fuzzy Environment, Expert Systems with Applications, 36, 8143-8151.
17.Demirtas, E. A. & Ustun, O. (2009). Analytic Network Process and Multi-period Goal Programming Integration in Purchasing Decisions, Computers and Industrial Engineering, 56, 677-690.
18.Diertrich, J. R. & Robert, S. K. (1982). Empirical Analysis of the Commerical Loan Classification Decision, The Accounting Review, 57, 18-38.
19.Eddie, W. L. & Li, H. (2004). Exploring Quantitative Methods for Project Location Selection, Building and Environment, 39(12), 1467-1476.
20.Espahibodi, P. (1991). Identification of Problem Banks and Binary Choices Models, Journal of Banking Finance, 15, 53-71.
21.Guner, A. F., Cengiz, M., & Seker, S. (2009). A Fuzzy ANP Approach to Shipyard Location Selection, Expert Systems with Applications, 36, 7992-7999.
22.Gungor, Z., Serhadlioğlu, G., & Kesen, S. E. (2009). A Fuzzy AHP Approach to Personnel Selection Problem, Applied Soft Computing, 9, 641-646.
23.Harrison, D. M. (2000). The Importance of Lender Heterogeneity in Mortgage Lending, Journal of Urban Economic, 49, 285-309.
24.Harbi, K. M. A. (2001). Application of AHP in Project Management, International Journal of Project Management, 19(4), 19-27.
25.Holden, M. C. & Wedman, J. F. (1993). Future Issues of Computer-mediated Communication: The Results of a Delphi Study, Educational Technology Research and Development, 41(4), 5-24.
26.Hsu, P. F., Wu, C. R., & Li, Y. T. (2008). Selection of Infectious Medical Waste Disposal Firms by Using the Analytic Hierarchy Process and Sensitivity Analysis, Waste Management, 28, 1386-1394.
27.Huan, S. H., Sheoran, S. K., & Wang, G. (2004). A Review and Analysis of Supply Chain Operations Reference (SCOR) Model, Supply Chain Management: An International Journal, 9(1), 23-29.
28.Hu, A. H., Hsu, C. W., Kuo, T. C., & Wu, W. C. (2009). Risk Evaluation of Green Components to Hazardous Substance Using FMEA and FAHP, Expert Systems with Applications, 36, 7142-7147.
29.Jackson, J. H. & Musselman, V. A. (1987). Business: Contemporary Concepts and Practices, NJ: Prentice-Hall Inc, 284.
30.Kahraman, G., Ertay, T., & Buyukozkan, G. (2006). A Fuzzy Optimization Model for QFD Planning Process Using Analytic Network Process Approach, European Journal of Operational Research, 171, 390-411.
31.Kone, A. C. & Buke, T. (2007). An Analytical Network Process (ANP) Evaluation of Alternative Fuels for Electricity Generation in Turkey, Energy Policy, 35, 5220-5228.
32.Lee, J. W. & Kim, S. H. (2000). Using Analytic Network Process and Goal Programming for Interdependent Information System Project Selection, Computers and Operations Research, 27(4), 367-382.
33.Lee, A. H. I. (2009). A Fuzzy Supplier Selection Model with the Consideration of Benefits, Opportunities, Costs and Risks, Expert Systems with Applications, 36, 2879-2893.
34.Lee, A. H. I., Kang, H. Y., Hsu, C. F., & Hung, H. C. (2009). A Green Supplier Selection Model for High-tech Industry, Expert Systems with Applications, 36, 7917-7927.
35.Lee, H., Park, Y. P., & Choi, H. (2009). Comparative Evaluation of Performance of National R&D Programs with Heterogeneous Objectives: A DEA Approach, European Journal of Operational Research, 196, 847-855.
36.Lee, A. H. I., Chen, H. H., & Kang, H. Y. (2009). Multi-criteria Decision Making on Strategic Selection of Wind Farms, Renewable Energy, 34, 120-126.
37.Liang, C. & Li, Q. (2008). Enterprise Information System Project Selection with Regard to BOCR, International Journal of Project Management, 26, 810-820.
38.Liemt, T., Knight, C. G., O’Neill, R. V., & Smith, E. R. (2004). Integrated Environmental Assessment of the Midatlantic Region with Analytical Network Process, Environmental Monitoring and Assessment, 94, 263-277.
39.Li, D. F. (2007). Compromise Ratio Method for Fuzzy Multi-attribute Group, Applied Soft Computing, 7, 807-817.
40.Linstone, H. A. & Turoff, M. (1979). The Delphi Method: Techniques and Applications, MA: Addison-Wesley Publishing Company.
41.Lin, M. C., Wang, C. C., Chen, M. S., & Chang, C. A. (2008). Using AHP and TOPSIS Approaches in Customer-driven Product Design Process, Computers in Industry, 59, 17-31.
42.Lin, H. T. & Chang, W. L. (2008). Order Selection and Pricing Methods Using Flexible Quantity and Fuzzy Approach for Buyer Evaluation, European Journal of Operational Research, 187, 415-428.
43.Lucas, H. C. & Moor, J. R. (1976). A Multiple-criterion Scoring Approach to Information System Project Selection, Information Systems and Operational Research, 14(1), 1-12.
44.Meade, L. & Sarkis, J. (1998). Strategic Analysis of Logistics and Supply Chain Management Systems Using the Analytical Network Process, Transportation Research Part E-Logistics and Transportation Review, 34(3), 201-215.
45.Meade, L. & Sarkis, J. (1999). Analyzing Organizational Project Alternatives for Agile Manufacturing Process: An Analytical Network Approach, International Journal of Production Research, 37, 241-261.
46.Meade, L. M. & Presley, A. (2002). R&D Project Selection Using the Analytic Network Process, IEEE Transactions on Engineering Management, 49(1), 59-66.
47.Momoh, J. A. & Zhu, J. (2003). Optimal Generation Scheduling based on AHP/ANP, IEEE Transactions on Systems, Man, and Cybernetics Part B: Cybernetics, 33(3), 531-535.
48.Mohanty, R. P., Agarwal, R., Choudhur, A. K., & Tiwari, M. K. (2005). A Fuzzy ANP-based Approach to R&D Project Selection: A Case Study, International Journal of Production Research, 43(24), 5199-5216.
49.Murry, J. W. & Hammons, J. O. (1995). Delphi: A Versatile Methodology for Conducting Qualitative Research, The Review of Higher Education, 18(4), 423-436.
50.Naghadehi, M Z., Mikaeil, R., & Ataei, M. (2009). The Application of Fuzzy Analytic Hierarchy Process (FAHP) Approach to Selection of Optimum Underground Mining Method for Jajarm Bauxite Mine, Iran, Expert Systems with Applications, 36, 8218-8226.
51.Ngai, E. W. T. (2003). Selection of Web Sites for Online Advertising Using AHP, Information and Management, 40(4), 233-242.
52.Niemira, M. P. & Saaty, T. L. (2004). An Analytic Network Process Model for Financial-crisis Forecasting, International Journal of Forecasting, 20, 573-587.
53.Noci, G. & Toletti, G. (2000). Selecting Quality based Programmes in Small Firms: A Comparison between Fuzzy Linguistic Approach and Analytic Hierarchy Process, International Journal of Production Economics, 67(2), 113-133.
54.Ohlson, J. A. (1980). Financial Ratios and the Probabilistic Prediction of Bankruptcy, Journal of Accounting Research, 18(1), 109-131.
55.Onut, S., Tuzkaya, U. R., & Saadet, N. (2008). Multiple Criteria Evaluation of Current Energy Resources for Turkish Manufacturing Industry, Energy Conversion and Management, 49, 1480-1492.
56.Orgier, Y. E. (1970). A Credit Scoring Model for Commercial Loans, Journal of Money, Credit, and Banking, 2(4), 435-445.
57.Partovi, F. Y. & Corredoira, R. A. (2002). Quality Function Deployment for the Good of Soccer, European Journal of Operational Research, 137, 642-656.
58.Raharjo, H., Xie, M., & Brombacher, A. C. (2009). On Modeling Dynamic Priorities in the Analytic Hierarchy Process Using Compositional Data Analysis, European Journal of Operational Research, 194, 834-846.
59.Raisinghani, M. S., & Mead, L. L. (2005). Strategic Decisions in Supply-chain Intelligence Using Knowledge Management-An Analytic-Network-Process Framework, Supply Chain Management: An International Journal, 10(2), 114-121.
60.Ravi, V., Shankar, R., & Tiwari, M. K. (2005). Analyzing Alternatives in Reverse Logistics for End-of-Life Computers: ANP and Balanced Scorecard Approach, Computers and Industrial Engineering, 48, 327-356.
61.Rock, A. (1984). Sure Ways to Score with Lender, Money.
62.Roper-Low, G. C. & Sharp, J. A. (1990). The Analytic Hierarchy Process and Its Application to an Information Technology Decision, Journal of the Operational Research Society, 41(1), 49-59.
63.Saaty, T. L. (1980). The Analytic Hierarchy Process, New York: McGraw-Hill.
64.Saaty, T. L. & Takizawa, M. (1986). Dependence and Independence: From Linear Hierarchies to Nonlinear Networks, European Journal of Operational Research, 26, 229-237.
65.Saaty, T. L. (1996). Decision Making with Dependence and Feedback: The Analytic Network Process, Pittsburgh: RWS Publications.
66.Saaty, T. L. (1999). Fundamentals of the Analytic Network Process, Paper Presented at the ISAHP 1999, Kobe, Japan.
67.Saaty, T. L. & Ozdemir, M. (2003). Negative Priorities in the Analytic Hierarchy Process, Mathematical and Computer Modelling, 37, 1063-1075.
68.Saaty, T. L. (2004). The Analytic Network Process (Part 2) Benefits, Opportunities, Costs and Risks Decision Example, Paper Presented at the MCDM 2004, Whistler, B. C., Canada.
69.Saaty, T. L. (2006). Rank from Comparisons and from Ratings in the Analytic Hierarchy/Network Processes, European Journal of Operational Research, 168, 557-570.
70.Saaty, T. L. (2007). Multi-decisions Decision-making: In Addition to Wheeling and Dealing, Our National Political Bodies Need a Formal Approach for Prioritization, Mathematical and Computer Modelling, 46, 1001-1016.
71.Sarkis, J. & Sundarraj, R. P. (2002). Hub Location at Digital Equipment Corporation: A Comprehensive Analysis of Qualitative and Quantitative Factors, European Journal of Operational Research, 137, 336-347.
72.Sackman, H. (1974). Delphi Critique. Expert Opinion, Forecasting and Group Process, Lexington Books.
73.Sanathanam, R. & Kyparisis, G. J. (1996). A Decision Model for Interdependent Information System Project Selection, European Journal of Operational Research, 89, 380-399.
74.Schniederjans, M. J. & Kim, G. Y. (1987). A Goal Programming Model to Optimize Departmental Preferences in Course Assignment, Computers and Operational Research, 14(2), 87-96.
75.Schniederjans, M. J. & Fowler, K. (1989). Strategic Acquisition Analysis: A Multi-objective Approach, Journal of the Operational Research Society, 40(4), 333-345.
76.Shih, H. S. (2008). Incremental Analysis for MCDM with an Application to Group TOPSIS, European Journal of Operational Research, 186, 720-734.
77.Simunich, B. (2007). In the Fall of 2002, the ANP Had Shown a Better Way to Deal with Iraq, Mathematical and Computer Modelling, 46, 1130-1143.
78.Sobczack, A. & Berry, D. M. (2007). Distributed Priority Ranking of Strategic Preliminary Requirements for Management Information Systems in Economic Organizations, Information and Software Technology.
79.Srinivasan, V. & Kim, Y. H. (1988). Designing Expert Financial Systems-A Case Study of Corporate Credit Manangment, Financial Manangment, 17(3), 32-45.
80.Steenackers, A. & Goovaerts, M. J. (1989). A Credit Scoring Model for Personal Loans, Insurance: Mathematics Economics, 8(1), 31-34.
81.Stavins, J. (2000). Credit Card Borrowing, Delinquency, and Personal Bankruptcy, New England Economic Review, 15-30.
82.Takamura, Y. & Tone, K. (2003). A Comparative Site Evaluation Study for Relocating Japanese Government Agencies in Tokyo, Socio-Economic Planning Sciences, 37(2), 85-102.
83.Tseng, Y. F. & Lee, T. Z. (2009). Comparing Appropriate Decision Support of Human Resource Practices on Organizational Performance with DEA/AHP Model, Expert Systems with Applications, 36, 6548-6558
84.Updegrave, (1987). How Lender Size You Up, Monday.
85.Ustun, O. & Demirtas, E. A. (2008). Multi-period Lot-sizing with Supplier Selection Using Achievement Scalarizing Functions, Computers and Industrial Engineering, 54, 918-931.
86.Ustun, O. & Demirtas, E. A. (2008). An Integrated Multi-objective Decision-making Process for Multi-period Lot-sizing with Supplier Selection, Omega, 36, 509-521.
87.Wang, Y. M., Luo, Y., & Hua, Z. S. (2007). A Note on Group Decision-making based on Concepts of Ideal and Anti-ideal Points in a Fuzzy Environment, Mathematical and Computer Modelling, 46, 1256-1264.
88.Wang, Y. M. & Chin, K. S. (2009). A New Data Envelopment Analysis Method for Priority Determination and Group Decision Making in the Analytic Hierarchy Process, European Journal of Operational Research, 195, 239-250.
89.Wijnmalen, D. J. D. (2007). Analysis of Benefits, Opportunities, Costs, and Risks (BOCR) with the AHP-ANP: A Critical Validation, Mathematical and Computer Modelling, 46, 892-905
90.Wu, C. R., Chang, C. W., & Lin H. L. (2006). Evaluating the Organizational Performance of Taiwanese Hospitals Using the Fuzzy Analytic Hierarchy Process, The Journal of American Academy of Business, 9(2), 201-210.
91.Wu, C. R., Lin, C. T., & Chen, H. C. (2007). Integrated Environmental Assessment of the Location Selection with Fuzzy Analytical Network Process, Quality and Quantity, 43, 351-380.
92.Wu, C. R., Lin, C. T., & Lin, Y. F. (2009). Selecting the Preferable Bancassurance Alliance Strategic by Using Expert Group Decision Technique, Expert Systems with Applications, 36, 3623-3629.
93.Xu, Y. & Zhang, Y. (2009). A Online Credit Evaluation Method based on AHP and SPA, Commun Nonlinear Sci Numer Simulat, 14, 3031-3036.
94.Yang, T., Chen, M. C., & Huan, C. C. (2007). Multiple Attribute Decision-making Methods for the Dynamic Operator Allocation Problem, Mathematics and Computers in Simulation, 73, 285-299.
95.Yazgan, H. R., Boran, S., & Goztepe, K. (2009). An ERP Software Selection Process with Using Artificial Neural Network based on Analytic Network Process Approach, Expert Systems with Applications, 36, 9214-9222.
96.Yu, L., Wang, S. & Lai, K. K. (2009). An Intelligent-agent-based Fuzzy Group Decision Making Model for Financial Multicriteria Decision Support: The Case of Credit Scoring, European Journal of Operational Research, 195, 942-959.
97.Yurdakul, M. (2003). Measuring Long-term Performance of a Manufacturing Firm Using the Analytic Network Process (ANP) Approach, International Journal of Production Research, 41(11), 2502-2529.
98.Zeng, G., Jiang, R., Huang, G., Xu, M., & Li, J. (2007). Optimization of Wastewater Treatment Alternative Selection by Hierarch Grey Relational Analysis, Journal of Environmental Management, 82, 250-259.
99.Zhao, Y. W. & Yang, Z. F. (2009). Integrative Fuzzy Hierarchical Model for River Health Assessment: A Case Study of Yong River in Ningbo City, China, Communications in Nonlinear Science and Numerical Simulation, 14, 1729-1736.
中文部分
1.中華民國銀行公會。信用評等表評估指標圖,取自中華民國銀行公會:http://www.ba.org.tw/holiday.aspx
2.初復新(1981)。銀行放款實務 (8-69頁)。台北:華泰書局。
3.李樑堅、馮志剛(1998)。銀行個人擔保與信用放款授信評估之研究。台灣銀行季刊,49(2),1-35。4.林煜宗(1986)。本國銀行與外商銀行授信政策之比較研究。國立台灣大學研究報告。
5.益通光能。太陽能電池製程圖,取自益通光能:http://www.e-tonsolar.com/edu.htm
6.基層金融研究訓練中心印(1988)。授信實務。
7.陳錦村(1995)。銀行授信客戶之風險評估。中山管理評論,3(4),1-23。8.陳錦村(1996)。銀行授信客戶之甄選:層級分析法的法的應用與比較。台大管理論叢,7(2),1-27。9.潘錫將(1994)。銀行如何利用企業財務報表資料作授信決策。產業經濟,160,1-61。
10.龔昶元(1998)。Logistic Regression 模式應用於信用卡信用風險審核之研究-以國內某銀行信用卡中心為例。台北銀行月刊,28(9),35-49。