| 期刊論文1. | 簡禎富、胡志翰(20111200)。全面資源管理架構:以晶圓廠為實證。品質學報,18(6),581-607。 延伸查詢 | 2. | Chien, Chen-Fu、Chuang, Shih-Chung(2014)。A framework for root cause detection of sub-batch processing system for semiconductor manufacturing big data analytics。IEEE Transactions on Semiconductor Manufacturing,27(4),475-488。 | 3. | Xu, Xun(2012)。From cloud computing to cloud manufacturing。Robotics and Computer-Integrated Manufacturing,28(1),75-86。 | 4. | Chien, Chen-Fu、Diaz, Alejandra Campero、Lan, Yu-Bin(2014)。A Data Mining Approach for Analyzing Semiconductor MES and FDC Data to Enhance Overall Usage Effectiveness (OUE)。International Journal of Computational Intelligence Systems,7(2),52-65。 | 5. | 簡禎富、林國義(20161000)。建構半導體晶圓廠整廠績效指標架構與全面資源管理。管理與系統,23(4),451-474。 延伸查詢 | 6. | 簡禎富、李郁怡(2015)。物聯網帶來的危機與轉機。哈佛商業評論,106,150-153。 延伸查詢 | 7. | 簡禎富(2017)。如何先打造出『工業3.5』的能力。哈佛商業評論(全球繁體中文版),128,46-54。 延伸查詢 | 8. | Agrawal, Gaurav K.、Heragu, Sunderesh S.(2006)。A Survey of Automated Material Handling Systems in 300-mm Semiconductor Fabs。IEEE Transactions on Semiconductor Manufacturing,19(1),112-120。 | 9. | Chien, Chen-Fu、Lin, Ting-Hao、Liu, Qiao-Wen、Peng, Cheng-Yung、Hsu, Shao-Chung、Huang, Chia-Chi(2002)。Developing a Data Mining Method for Wafer Binmap Clustering and an Empirical Study in a Semiconductor Manufacturing Fab。Journal of the Chinese Institute of Industrial Engineers,19(2),23-38。 | 10. | Chien, Chen-Fu、Chang, Kuo-Hao、Chen, Chih-Ping(2003)。Design of a Sampling Strategy for Measuring and Compensating for Overlay Errors in Semiconductor Manufacturing。International Journal of Production Research,41(11),2547-2561。 | 11. | Chien, Chen-Fu、Chen, Chien-Hung(2007)。A Novel Timetabling Algorithm for a Furnace Process for Semiconductor Fabrication with Constrained Waiting and Frequency-Based Setups。OR Spectrum,29(3),391-419。 | 12. | Chien, Chen-Fu、Chen, Yun-Ju、Peng, Jin-Tang(2010)。Manufacturing Intelligence for Semiconductor Demand Forecast Based on Technology Diffusion and Product Life Cycle。International Journal of Production Economics,128(2),496-509。 | 13. | Chien, Chen-Fu、Zheng, Jia-Nian(2012)。Mini-Max Regret Strategy for Robust Capacity Expansion Decisions in Semiconductor Manufacturing。Journal of Intelligent Manufacturing,23(6),2151-2159。 | 14. | Chien, Chen-Fu、Hsu, Chia-Yu、Chang, Kuo-Hao(2013)。Overall Wafer Effectiveness (OWE): A Novel Industry Standard for Semiconductor Ecosystem as a Whole。Computers & Industrial Engineering,65(1),117-127。 | 15. | Chien, Chen-Fu、Chen, Ying-Jen、Hsu, Chia-Yu、Wang, Hung-Kai(2014)。Overlay Error Compensation Using Advanced Process Control with Dynamically Adjusted Proportional-Integral R2R Controller。IEEE Transactions on Automation Science and Engineering,11(2),473-484。 | 16. | Chien, Chen-Fu、Chu, Pei-Chun、Zhao, Lizhong(2015)。Overall Resource Effectiveness (ORE) Indices for Total Resource Management and Case Studies。International Journal of Industrial Engineering,22(5),618-630。 | 17. | Chien, Chen-Fu、Chou, Che-Wei、Yu, Hui-Chun(2016)。A Novel Route Selection and Resource Allocation Approach to Improve the Efficiency of Manual Material Handling System in 200-mm Wafer Fabs for Industry 3.5。IEEE Transactions on Automation Science and Engineering,13(4),1567-1580。 | 18. | Chien, Chen-Fu、Hu, Chih-Han、Hu, Yi-Fen(2016)。Overall Space Effectiveness (OSE) for Enhancing Fab Space Productivity。IEEE Transactions on Semiconductor Manufacturing,29(3),239-247。 | 19. | Chien, Chen-Fu、Dou, Runliang、Fu, Wenhan(2018)。Strategic Capacity Planning for Smart Production: Decision Modeling under Demand Uncertainty。Applied Soft Computing,68(July),900-909。 | 20. | Inman, Robert R.、Blumenfeld, Dennis E.、Huang, Ningjian、Li, Jingshan、Li, Jing(2013)。Survey of Recent Advances on the Interface between Production System Design and Quality。IIE Transactions,45(6),557-574。 | 21. | Kang, Hyoung Seok、Lee, Ju Yeon、Choi, Sang Su、Kim, Hyun、Park, Jun Hee、Son, Ji Yeon、Kim, Bo Hyun、Noh, Sang Do(2016)。Smart Manufacturing: Past Research, Present findings, and Future Directions。International Journal of Precision Engineering and Manufacturing-Green Technology,3(1),111-128。 | 22. | Mönch, Lars、Fowler, John W.、Dauzère-Pérès, Stéphane、Mason, Scott J.、Rose, Oliver(2011)。A Survey of Problems, Solution Techniques, and Future Challenges in Scheduling Semiconductor Manufacturing Operations。Journal of Scheduling,14(6),583-599。 | 23. | Lee, Jay、Kao, Hung-An、Yang, Shanhu(2014)。Service Innovation and Smart Analytics for Industry 4,0 and Big Data Environment。Procedia CIRP,16(June),3-8。 | 24. | Lee, Jay(2015)。Smart Factory Systems。Informatik-Spektrum,38(3),230-235。 | 25. | Liu, Chiao-Wen、Chien, Chen-Fu(2013)。An Intelligent System for Wafer Bin Map Defect Diagnosis: An Empirical Study for Semiconductor Manufacturing。Engineering Applications of Artificial Intelligence,26(5),1479-1486。 | 26. | Rao, R. Venkata、Patel, Bhisma K.、Parnichkun, Manukid(2011)。Industrial Robot Selection Using a Novel Decision Making Method Considering Objective and Subjective Preferences。Robotics and Autonomous Systems,59(6),367-375。 | 27. | Moore, Gordon(1965)。Cramming More Components onto Integrated Circuits。Electronics,38(8),114-117。 | 28. | Thoben, Klaus-Dieter、Wiesner, Stefan、Wuest, Thorsten(2017)。'Industrie 4.0' and Smart Manufacturing--A Review of Research Issues and Application Examples。International Journal of Automation Technology,11(1),4-19。 | 29. | Wang, Hung-Kai、Chien, Chen-Fu、Gen, Mitsuo(2015)。An Algorithm of Multi-Subpopulation Parameters with Hybrid Estimation of Distribution for Semiconductor Scheduling with Constrained Waiting Time。IEEE Transactions on Semiconductor Manufacturing,28(3),353-366。 | 30. | Wang, Shiyong、Wan, Jiafu、Li, Di、Zhang, Chunhua(2016)。Implementing Smart Factory of Industrie 4.0: An Outlook。International Journal of Distributed Sensor Networks,12(1),1-10。 | 31. | Yang, Peng、Tang, Gongguo、Nehorai, Arye(2013)。A Game-Theoretic Approach for Optimal Time-of-Use Electricity Pricing。IEEE Transactions on Power Systems,28(2),884-892。 | 32. | Yoon, Joo-Sung、Shin, Seung-Jun、Suh, Suk-Hwan(2012)。A Conceptual Framework for the Ubiquitous Factory。International Journal of Production Research,50(8),2174-2189。 | 33. | Yugma, Claude、Blue, Jakey、Dauzère-Pérès, Stéphane、Obeid, Ali(2015)。Integration of Scheduling and Advanced Process Control in Semiconductor Manufacturing: Review and Outlook。Journal of Scheduling,18(2),195-205。 | 34. | Yusup, Norfadzlan、Zain, Azlan Mohd、Hashim, Siti Zaiton Mohd(2012)。Evolutionary Techniques in Optimizing Machining Parameters: Review and Recent Applications (2007-2011)。Expert Systems with Applications,39(10),9909-9927。 | 35. | 簡禎富、林國義、許鉅秉、吳政鴻(20160300)。臺灣生產與作業管理之相關期刊文獻回顧與前瞻:從工業3.0到工業3.5。管理學報,33(1),87-103。 延伸查詢 | 會議論文1. | Thangavel, Dinesh、Ma, Xiaoping、Valera, Alvin、Tan, Hwee-Xian、Tan, Colin Keng-Yan(2014)。Performance Evaluation of MQTT and CoAP via a Common Middleware。The 2014 IEEE Ninth International Conference on Intelligent Sensors, Sensor Networks and Information Processing,(會議日期: April 21-24)。Singapore。 | 2. | Yabuki, Akinori、Nguyen, Hien、Yoshioka, Takashi、Ohishi, Kiyoshi、Miyazaki, Toshimasa、Yokokura, Yuki(2014)。Final State Control Based on High-Speed Positioning Control Considering Acceleration and Speed Limits for Industrial Robot。The 2014 10th France-Japan/8th Europe-Asia Congress on Mecatronics (MECATRONICS),Tokyo Metropolitan University (會議日期: November 27-30)。 | 研究報告1. | Bosch(2015)。Harnessing the Power of the Internet of Things--The IoT for the Extented Enterprise。Bosch Software Innovations。 | 2. | Bosch(2015)。Production Rules Configurator--Rules Based Analysis of Production Data with Connected Manufacturing Solutions。Bosch Software Innovations。 | 3. | Executive Office of the President of the United States(2012)。A National Strategic Plan for Advanced Manufacturing。The President's Council of Advisors on Science and Technology of the United States。 | 4. | Executive Office of the President of the United States(2014)。Accelerating U.S. Advanced Manufacturing, AMP2.0 Steering Committee Report。 | 5. | Kagermann, Henning、Helbig, Johannes、Hellinger, Ariane、Wahlster, Wolfgang(2013)。Recommendations for Implementing the Strategic Initiative INDUSTRIE 4.0: Securing the Future of German Manufacturing Industry。Forschungsunion。 | 6. | Lin, Shi-Wan、Miller, Bradford、Durand, Jacques、Joshi, Rajive、Didier, Paul、Chigani, Amine、Torenbeek, Reinier、Duggal, David、Martin, Robert、Bleakley, Graham(2015)。Industrial Internet Reference Architecture。Industrial Internet Consortium。 | 7. | Siemens(2013)。SIMATIC IT Intelligence Suite v2.1: Functional Overview。Siemens AG。 | 8. | SEMATECH, International(2003)。E-Diagnostics and EEC Guidance。Austin, Texas:SEMATECH。 | 9. | Siemens(2015)。Profit from Engineering Efficiency: Totally Integrated Automation Portal in Practice。Siemens TIA Portal。 | 圖書1. | 簡禎富(2014)。決策分析與管理--紫式決策分析以全面提升決策品質。台北:雙葉書廊。 延伸查詢 | 2. | 簡禎富、許嘉裕(2014)。資料挖礦與大數據分析。前程文化公司。 延伸查詢 | 3. | Castillo, Enrique Del(2002)。Statistical Process Adjustment for Quality Control。New York:John Wiley & Sons。 | 4. | Larrañaga, Pedro、Lozano, Jose A.(2001)。Estimation of Distribution Algorithms: A New Tool for Evolutionary Computation。New York:Springer Science & Business Media。 | 5. | Nakajima, Seiichi(1988)。Introduction to TPM: Total Productive Maintenance。Cambridge, MA:Productivity Press。 | |
| |