| 期刊論文1. | Deb, Kalyanmoy(2000)。An efficient constraint handling method for genetic algorithms。Computer Methods in Applied Mechanics and Engineering,186,311-338。 | 2. | Takahashi, T.(1978)。Mechanical Characteristics of Debris Flow。Journal of the Hydraulics Division,104(8),1153-1169。 | 3. | 衛萬明、張軒誌(20030600)。鄰避設施之垃圾焚化廠區位選擇多準則決策支援系統研究。造園學報,9(1),21-52。 延伸查詢 | 4. | Ishihara, K.(1993)。Liquefaction and Flow Failure During Earthquakes。Geotechnique,43(3),351-415。 | 5. | Robertson, P. K.、Campanella, R. G.(1985)。Liquefaction Potential of Sands using the CPT。Journal of Geotechnical Engineering,111(3),384-403。 | 6. | Seed, H. B.(1979)。Soil Liquefaction and Cyclic Mobility Evaluation for Level Ground During Earthquakes。Journal of Geotechnical Engineering Division,105(2),201-255。 | 7. | Seed, H. B.、Idriss, I. M.、Arango, I.(1983)。Evaluation of Liquefaction Potential Using Field Performance Data。Journal of the Geotechnical Engineering,109(3),458-482。 | 8. | Stark, T. D.、Olson, S. M.(1995)。Liquefaction Resistance Using CPT and Field Case Histories。Journal of Geotechnical Engineering,121(12),856-869。 | 9. | Youd, T. L.、Idriss, I. M.(2001)。Liquefaction Resistance of Soils: Summary Report From the 1996 NCEER and 1998 NCEER/NSF Workshops on Evaluation of Liquefaction Resistance of Soils。Journal of Geotechnical and Geoenvironmental Engineering,127(4),297-313。 | 10. | Chang, M.、Chiu, Y.、Lin, S.、Ke, T. C.(2005)。Preliminary study on the 2003 slope failure in Woo-wan-chai Area, Mt. Ali Road, Taiwan。Engineering Geology,80,93-114。 | 11. | 周憲德、廖偉民、姚善文(20020300)。發生土石流之臨界降雨特性分析。中國土木水利工程學刊,14(1),1-8。 延伸查詢 | 12. | Christian, J. T.、Ladd, C. C.、Baecher, G. B.(1994)。Reliability applied to slope stability analysis。Journal of Geotechnical Engineering,120(12),2180-2207。 | 13. | Collins, B. D.、Znidarcic, D.(2004)。Stability analyses of rainfall induced landslides。Journal of Geotechnical and Geoenvironmental Engineering,130(4),362-372。 | 14. | 紀雲曜、李上妤、葉光毅(20041200)。公共設施最適服務/影響距離之評估模式。建築與規劃學報,5(2),150-177。 延伸查詢 | 15. | Keefer, D. K.、Wilson, R. C.、Mark, R. K.、Brabb, E. E.、Brown, W. M. III、Ellen, S. D.、Harp, E. L.、Wieczorek, G. F.、Alger, C. S.、Zatkin, R. S.(1987)。Real-Time Landslide Warning During Heavy Rainfall。Science,238(4829),921-925。 | 16. | 蔡錦松、吳昭慧、謝宗哲(19971100)。都市防災預警體系之建築物毀損預估分析模式。成功大學學報(科技.醫學篇),32,71-92。 延伸查詢 | 17. | Casagrande, A.(1965)。The role of 'Calculated Risk' in earthwork and foundation engineering。Journal of the Soil Mechanics and Foundations Division,91(4),1-40。 | 18. | Whitman, R. V.(2000)。Organizing and evaluating uncertainty in geotechnical engineering。Journal of Geotechnical and Geoenvironmental Engineering,125(6),583-593。 | 19. | Halim, I. S.、Tang, W. H.(1993)。Site exploration strategy for geologic anomaly characterization。J. Geotech. Engrg.,119(2),195-213。 | 20. | Nobre, M. M.、Sykes, J. F.(1992)。Application of Bayesian Kriging to subsurface characterization。Can. Geotech. J.,29(4),589-598。 | 21. | Tang, W. H.(1979)。Probabilistic evaluation of penetration resistance。J. Geotech. Engrg.,105(10),1173-1191。 | 22. | Haldar, A.、Miller, F. J.(1984)。Statistical evaluation of cyclic strength of sand。Journal of Geotechnical Engineering,110(12),1785-1802。 | 23. | Ohlmacher, G. C.、Davis, J. C.(2003)。Using multiple logistic regression and GIS technology to predict landslide hazard in northeast Kansas, USA。Engineering Geology,69,331-343。 | 24. | Oka, Y.、Wu, T. H.(1990)。System reliability of slope stability。J. Geotech. Engrg.,116(8),1185-1189。 | 25. | Low, B. K.(1997)。Reliability analysis of rock wedges。Journal of Geotechnical & Geoenvironmental Engineering,123(6),498-505。 | 26. | Park, H.、West, T. R.(2001)。Development of a probabilistic approach for rock wedge failure。Engineering Geology,59,233-251。 | 27. | Shinozuka, M.(1983)。Basic analysis of structural safety。J. of Struct. Engrg.,109(3),721-740。 | 28. | Benson, C. H.、Zhai, H.、Rashad, S.(1994)。Statistical sample size for construction of soil liners。J. Geotech. Engrg.,120(10),1704-1724。 | 29. | Phoon, K. K.、Kulhawy, F. H.(1999)。Evaluation of geotechnical property variability。Canada Geotechnical Journal,36,625-639。 | 30. | Juang, C. H.、Rosowsky, D. V.、Tang, W. H.(1999)。Reliability-based method for assessing liquefaction potential of soils。Journal of Geotechnical and Geoenvironmental Engineering,125(8),684-689。 | 31. | Haldar, A.、Tang, W. H.(1979)。Probabilistic evaluation of liquefaction potential。Journal of Geotechnical Engineering Division,105(2),145-163。 | 32. | Fell, R.(1994)。Landslide risk assessment and acceptable risk。Can. Geotech. J.,31(2),261-272。 | 33. | Elton, D. J.、Tarik, H. H.(1990)。Liquefaction potential map for Charleston, South Carolina。Journal of Geotechnical Engineering,116(2),244-265。 | 34. | Duncan, J. M.(2000)。Factors of safety and reliability in geotechnical engineering。Journal of Geotechnical and Geoenvironmental Engineering,126(4),307-315。 | 35. | 張吉佐、方仲欣(19950900)。水送填土造地之探討。地工技術,51,5-20。 延伸查詢 | 36. | 簡連貴(19950900)。水力抽砂回填技術在造地工程之應用。地工技術,51,21-34。 延伸查詢 | 37. | 潘少昀、黃子明(19950900)。臺塑麥寮重機械廠動力壓密地盤改良。地工技術,51,35-50。 延伸查詢 | 38. | 陳俶季(19920600)。土壤液化潛能之風險評估。地工技術,38,5-16。 延伸查詢 | 39. | 李瑞麟(19840500)。土地使用規劃方法、問題及對策。人與地,5,28-37。 延伸查詢 | 40. | 李德河、紀雲曜、田坤國(19931200)。高雄縣沿海養殖地區之地盤下陷特性。營建知訊,135,22-42。 延伸查詢 | 41. | 林建元、岳裕智(1996)。專題計畫成果報導--都市計畫及設計決策支援系統之建立。工程科技通訊,20,51-52。 延伸查詢 | 42. | 林峰田(19970900)。公共設施檢討空間分析方法。都市與計劃,24(2),171-192。 延伸查詢 | 43. | 馮正民、解鴻年(19890600)。緊急設施區位模式之評述。交通運輸,11,27-38。 延伸查詢 | 44. | 劉泉枝(19911200)。單向度壓密試驗結果之評估及應用。地工技術,36,62-74。 延伸查詢 | 45. | Cook, T.、Falchi, P.、Mariano, R.(1984)。An Urban Allocation Model Combining Time Series And Analytic Hierarchical Methods。Management Science,30(2),198-208。 | 46. | Herrmann, S.、Osinski, E.(1999)。Planning Sustainable Land Use In Rural Areas At Different Spatial Levels Using GIS And Modeling Tools。Landscape and Urban Planning,39,93-101。 | 47. | Weisberg, B.(1993)。One City's Approach to NIMBY : How New York City Developed a Fair Share Sitting Process。Journal of the American Planning Association,59,93-97。 | 48. | 張石角(19800700)。都市山坡地利用潛力調查與製圖--方法論與實例。中華水土保持學報,11(1),13-24。 延伸查詢 | 49. | 黃書禮、蔡靜如(20000300)。臺北盆地土地利用變遷趨勢之研究。都市與計劃,27(1),1-23。 延伸查詢 | 50. | 謝正倫、陳禮仁(19930500)。土石流潛在溪流之危險度的評估方法。中華水土保持學報,24(1),13-19。 延伸查詢 | 51. | 張東炯、謝正倫(19960600)。東部蘭陽地區土石流現場調查與分析。中華水土保持學報,27(2),139-150。 延伸查詢 | 52. | Yen, Ben Chie、Chow, Ven Te(1980)。Design Hyetographs for Small Drainage Structures。Journal of the Hydraulics Division,106(6),1055-1076。 | 53. | 李永展、陳安琪(20011200)。臺中都會區都市永續性之衡量--生態足跡分析法之應用。國立臺灣大學建築與城鄉研究學報,10,1-17。 延伸查詢 | 54. | 張石角(19871100)。山坡地潛在危險之預測及其在環境影響評估之應用。中華水土保持學報,18(2),41-62。 延伸查詢 | 55. | Der-Kiureghian, A.、Ang, A. H. S.(1977)。A fault-rupture model for seismic risk analysis。Bulletin of the Seismological Society of America,67(4),1173-1194。 | 56. | Hopkins, L. D.(1977)。Methods for generating land suitability maps: A comparative evaluation。Journal of American Institute of Planners,43,386-400。 | 57. | 葉光毅(19900300)。都市公共設施服務距離之研究--臺南市之實例探討。建築學報,1,125-135。 延伸查詢 | 58. | Seed, H. B.、Idriss, I. M.(1971)。Simplified procedure for evaluating soil liquefaction potential。Journal of the Geotechnical Engineering Division,97(9),1248-1273。 | 59. | Shibata, T.、Teparaksa, W.(1988)。Evaluation of Liquefaction Potentials of Soils Using Cone Penetration Tests。Soils and Foundations,28(2),49-60。 | 60. | Tatsuoka, F.、Iwasaki, T.、Tokida, K.、Yasuda, S.、Hirose, M.、Imai, T.、Kon-no, M.(1980)。Standard penetration tests and soil liquefaction potential evaluation。Soils and Foundations,20(4),95-111。 | 61. | 鄒克萬、張曜麟(20000600)。一個機率性土地發展分析模式。臺灣土地科學學報,1,51-66。 延伸查詢 | 62. | 廖洪鈞、林郁欽(20011000)。鑑別分析法於社區危險邊坡篩選之應用與評估。地工技術,87,59-72。 延伸查詢 | 63. | Liao, S. S. C.、Veneziano, D.、Whitman, R. V.(1988)。Regression Model for Evaluating Liquefaction Probability。The Journal of Geotechnical Engineering,114(4),389-411。 | 64. | Seed, H. B.、Tokimatsu, K.、Harder, L. F.、Chung, R. M.(1985)。Influence of SPT Procedures in Soil Liquefaction Resistance Evaluation。Journal of the Geotechnical Engineering,111(12),1425-1445。 | 65. | Tokimatsu, K.、Yoshimi, Y.(1983)。Empirical Correlation of Soil Liquefaction Based on SPT N-value and Fines Content。Soils and Foundations,23(4),56-74。 | 66. | 陳亮全、詹士樑、洪鴻智(20040300)。都市地區震災緊急路網評估方法之研究。都市與計劃,31(1),47-64。 延伸查詢 | 67. | Ishikawa, Akira、Amagasa, Michio、Shiga, Tetsuo、Tomizawa, Giichi、Tatsuta, Rumi、Mieno, Hiroshi(1993)。The max-min Delphi method and fuzzy Delphi method via fuzzy integration。Fuzzy Sets and Systems,55(3),241-253。 | 68. | 謝正倫、陸源忠、游保杉、陳禮仁(19950900)。土石流發生臨界降雨線設定方法之研究。中華水土保持學報,26(3),167-172。 延伸查詢 | 69. | (19991100)。921建築及都市震害--建築物震害調查及震區都市災害基本調查。空間,123,35-36。 延伸查詢 | 70. | Zhang, L.、Tang, W. H.、Zhang, L.、Zheng, J.(2004)。Reducing Uncertainty of Prediction from Empirical Correlations。Journal of Geotechnical and Geoenvironmental Engineering,130(5),526-534。 | 71. | Yen, B. C.、Tang, W. H.(1976)。Risk-Safety Factor Relation for Storm Sewer Design。J. of Environmental Engineering Division,102(2),509-516。 | 72. | Yasuad, S.、Ishihara, K.、Harada, K.、Shinkawa, N.(1996)。Effect of soil improvement on ground subsidence due to liquefaction。Soils and Foundations,36(Special Issue),99-107。 | 73. | Xie, M.、Esaki, T.、Zhou, G.、Mitani, Y.(2003)。Three-dimensional stability evaluation of landslides and a sliding process simulation using a new geographic information systems component。Environmental Geology,43,503-512。 | 74. | Wu, J. H.、Lin, J. S.、Chen, C. S.(2009)。Dynamic discrete analysis of an earthquake-induced large-scale landslide。International Journal of Rock Mechanics & Mining Sciences,46,397-407。 | 75. | Viratjandr, C.、Michalowski, R. L.(2006)。Limit analysis of submerged slopes subjected to drawdown。Canada Geotechnical Journal,43(8),802-814。 | 76. | Tung, Y. K.、Mays, L. W.(1981)。Risk Models for Flood Levee Design。Water Resources Research,17(4),833-841。 | 77. | Tokimatsu, K.、Seed, H. B.(1987)。Evaluation of settlement in sands due to earthquake shaking。Journal of Geotechnical Engineering Division,113(8),861-878。 | 78. | Takahashi, T.(1981)。Estimation of potential debris flow and their hazardous zones; soft countermeasures for a disaster。Journal Natural Disaster Science,3(1),57-89。 | 79. | Sun, J.、Li, J.、Liu, Q.(2008)。Search for Critical Slip Surface in Slope Stability Analysis by Spline-Based Method。Journal of Geotechnical and Geoenvironmental Engineering,134(2),252-256。 | 80. | Subbaraj, P.、Pajnarayanan, P. N.(2009)。Optimal Reactive Power Dispatch Using Self-adaptive Real Coded Genetic Algorithm。Electric Power Systems Research,79,374-381。 | 81. | Skempton, A. W.(1986)。Standard penetration test procedures and the effects in sands of overburden pressure, relative density, particle size。Geotechnique,36(3),425-447。 | 82. | Fu, Shengcong、Tatsuoka, F.(1984)。Soil liquefaction during Haicheng and Tangshan earthquake in China: a review。Soils and Foundations,24(4),11-29。 | 83. | Rickenmann, D.(1999)。Empirical relationships for debris flows。Natural Hazards,19,47-77。 | 84. | Rahardjo, H.、Lee, T. T.、Leong, E. C.、Rezaur, R. B.(2005)。Response of a residual soil slope to rainfall。Canada Geotechnical Journal,42(2),340-351。 | 85. | Quek, S. T.、Leung, C. F.(1995)。Reliability-Based Stability Analysis of Rock Excavations。International Journal of Rock Mechanics and Mining Science and Geomechanics Abstracts,32(6),617-620。 | 86. | Penalba, R. F.、Luo, Z.、Juang, C. H.(2009)。Framework for probabilistic assessment of landslide: a case study of El Berrinche。Environmental Earth Sciences,59,489-499。 | 87. | Ohsaki, Y.(1970)。Effects of sand compaction on liquefaction during Tokachioki earthquake。Soils and Found,10(2),112-128。 | 88. | Nicoletti, P. G.、Sorriso-Valvo, M.(1991)。Geomorphic controls of the shape and mobility of rock avalanches。Geological Society of America Bulletin,103,1365-1373。 | 89. | Nagase, H.、Ishihara, K.(1988)。Liquefaction-induced compaction and settlement of sand during earthquakes。Soils and Foundations,28(1),65-76。 | 90. | Melching, C. S.、Anmangandla, Sharath(1992)。Improved First-Order Uncertainty Method for Water-Quality Modeling。Journal of Environmental Engineering,118(5),791-805。 | 91. | Matsuo, M.、Kuroda, K.(1974)。Probabilistic approach to design of embankments。Soils and Foundations,14,1-17。 | 92. | Lumb, P.(1970)。Safety factors and the probability distribution of soil strength。Canadian Geotechnical Journal,7,225-242。 | 93. | Low, B. K.、Gilbert, R. B.、Wright, S. G.(1998)。Slope reliability using generalized method of slices。Journal of Geotechnical and Geoenvironmental Engineering,124(4),350-362。 | 94. | Low, B. K.、Tang, W. H.(1997)。Efficient reliability evaluation using spreadsheet。Journal of Engineering Mechanics,123(7),749-752。 | 95. | Low, B. K.、Tang, W. H.(1997)。Probabilistic slope analysis using Janbu's generalized procedure of slices。Computers and Geotechnics,21(2),121-142。 | 96. | Low, B. K.(2007)。Reliability analysis of rock slopes involving correlated nonnormals。International Journal of Rock Mechanics and Mining Sciences,44,922-935。 | 97. | Low, B. K.(1997)。Reliability analysis for rock wedges。Journal of Geotechnical and Geoenvironmental Engineering,123(6),498-505。 | 98. | Lorente, A.、Begueria, S.、Bathurst, J. C.、Garcia-Ruiz, J. M.(2003)。Debris flow characteristics and relationships in the central Spanish Pyrenees。Natural Hazards and Earth System Science,3,683-691。 | 99. | Li. K. S.、Cheung, R. W. M.(2001)。Discussion search algorithm for minimum reliability index of earth slopes by Hassan A. H. and Wolff T. F.。Journal of Geotechnical and Geoenvironmental Engineering,127(2)。 | 100. | Li, K. S.、White, W.(1987)。Rapid evaluation of the critical slip surface in slope stability problems。Int. J. Numer. And Analytical Methods in Geomech.,11,449-473。 | 101. | Li, K. S.、Lumb, P.(1987)。Probabilistic design of slopes。Can. Geotech. J.,24,520-535。 | 102. | Li, D.、Zhou, C.、Lu, W.、Jiang, Q.(2009)。A system reliability approach for evaluating stability of rock wedges with correlated failure modes。Computers and Ceotechnics,36,1298-1307。 | 103. | Lee, Ya-Fen、Chi, Yun-Yao、Juang, C. Hsein、Lee, Der-Her(2010)。Annual probability and return period of soil liquefaction in Yuanlin, Taiwan attributed to Chelungpu Fault and Changhua Fault。Engineering Geology,114,343-353。 | 104. | Lee, Y. F.、Chi, Y. Y.、Lee, D. H.、Juang, C. H.、Wu, J. H.(2007)。Simplified Models for Assessing Annual Liquefaction Probability: A Case Study of the Yuanlin area, Taiwan。Engineering Geology,90,71-88。 | 105. | Lee, K.、Albraisa, A.(1974)。Earthquake-induced settlements in saturated sands。Journal of Geotechnical Engineering Division,100(4),387-405。 | 106. | Lai, S. Y.、Hsu, S. C.、Hsieh, M. J.(2004)。Discriminate model for evaluating soil liquefaction potential using cone penetration test data。Journal of Geotechnical and Geoenvironmental Engineering,130(12),771-780。 | 107. | Keifer, C. J.、Chu, H. H.(1957)。Synthetic storm pattern for drainage design。Journal of the Hydraulics Division,83(4),1-25。 | 108. | Juang, C. H.、Fang, S. Y.、Khor, E. H.(2006)。First-Order Reliability Method for Probabilistic Liquefaction Triggering Analysis CPT。Journal of Geotechnical and Geoenvironmental Engineering,132(3),337-350。 | 109. | Juang, C. H.、Chen, C. J.、Rosowsky, D. V.、Tang, W. H.(2000)。CPT-based liquefaction analysis, Part 2: Reliability for design。Geotechnique,50(5),593-599。 | 110. | Jimenez-Rodriguez, R.、Sitar, N.(2007)。Rock wedge stability analysis using system reliability methods。Rock Mechanics and Rock Engineering,40(4),419-427。 | 111. | Hwang, J. H.、Yang, C. W.、Juang, D. S.(2004)。A practical reliability-based method for assessing soil liquefaction potential。Soil Dynamics and Earthquake Engineering,24,761-770。 | 112. | Husein Malkawi, A. I.、Hassan, W. F.、Sarma, S. K.(2001)。Global search method for locating general slip surface using Monte Carlo techniques。Journal of Geotechnical and Geoenvironmental Engineering,127(8),688-698。 | 113. | Huff, F. A.(1967)。Time distribution of rainfall in heavy storms。Water Resources Research,3(4),1007-1019。 | 114. | Hsu, S. C.、Nelson, P. P.(2006)。Material spatial variability and slope stability for weak rock mass。Journal Geotech Geoenviron Engineering,132(2),183-193。 | 115. | Hassan, A. H.、Wolff, T. F.(1999)。Search algorithm for minimum reliability index of earth slopes。Journal of Geotechnical and Geoenvironmental Engineering,125(4),301-308。 | 116. | Hasofer, A. M.、Lind, N. C.(1974)。An exact and invariant first-order reliability format。Journal of the Engineering Mechanics Division,100(1),111-121。 | 117. | Hamada, M.、Isorama, R.、Wakamatsu, K.(1996)。Liquefaction-induced ground displacement and its related damage to lifeline facilities。Soils and Foundations,36(Special Issue),81-97。 | 118. | Griffiths, D. V.、Fenton, G. A.(2004)。Probabilistic slope stability analysis by finite elements。Journal of the Geotechnical Engineering Division,130(5),507-518。 | 119. | Greenwood, J. R.、Norris, J. E.、Wint, J.(2006)。Site investigation for the effects of vegetation on ground stability。Geotech Geol Eng,24,467-481。 | 120. | Greco, V. R.(1996)。Efficient Monte Carlo Technique for Locating Critical Slip Surface。Journal of Geotechnical Engineering,122(7),517-525。 | 121. | Goodman, R. E.、Kieffer, D. S.(2000)。Behavior of rock in slopes。Journal Geotech Geoenviron Engineering,126(8),675-684。 | 122. | Goodman, R. E.(1995)。Thirty-fifth Ranking lecture: block theory and its application。Geotechnique,45(3),383-423。 | 123. | Georgiannou, V. N.、Burland, J. B.(2006)。A laboratory study of slip surface formation in an intact natural stiff clay。Geotechnique,56(8),551-559。 | 124. | Genske, D. D.、Walz, B.(1991)。Probabilistic Assessment of the Stability of Rock Slopes。Structural Safety,9,179-195。 | 125. | El-Ramly, H.、Morgenstern, N. R.、Cruden, D. M.(2002)。Probabilistic slope stability analysis for practice。Canadian Geotechnical Journal,39,665-683。 | 126. | Duzgun, H. S.、Yucemen, M. S.、Karpuz, C.(2003)。A Methodology for Reliability-Based Design of Rock Slopes。Rock Mechanics and Rock Engineering,36(2),95-120。 | 127. | Ditlevsen, O.(1982)。Model uncertainty in structural reliability。Structural Safety,1,73-86。 | 128. | Crum, D. A.(2001)。Discussion search algorithm for minimum reliability index of earth slopes by Hassan A. H. and Wolff T. F.。Journal of Geotechnical and Geoenvironmental Engineering,127(2)。 | 129. | Constantine, A. S.、Bouckovalas, G.、Whitman, R. V.(1991)。Analytical prediction of earthquake-induced permanent deformations。Journal of Geotechnical Engineering,117(10),1471-1491。 | 130. | Christian, J. T.(2004)。Geotechnical engineering reliability: how well do we know what we are doing?。Journal of Geotechnical and Geoenvironmental Engineering,130(10),985-1003。 | 131. | Chowdhury, R. N.、Xu, D. W.(1995)。Geotechnical system reliability of slopes。Reliability Engineering and System Safety,47,141-151。 | 132. | Chigira, M.、Wang, W. N.、Furuya, T.、Kamai, T.(2003)。Geological causes and geomorphological precursors of the Tsaoling landslide triggered by the 1999 Chi-Chi earthquake, Taiwan。Engineering Geology,68,259-273。 | 133. | Chen, A. Y.、Morgenstern, N. R.(1983)。Extension to the Generalized Method of Slices for Stability Analysis。Canadian Geotechnical Journal,20(1),104-119。 | 134. | Boulanger, R. W.、Mejia, L. H.、Idriss, L. M.(1997)。Liquefaction at Moss Landing during Loma Prieta earthquake。Journal of Geotechnical Engineering,123(5),453-467。 | 135. | Borgman, L. E.(1963)。Risk Criteria。Journal of Waterways and Harbors Division,89(3),1-35。 | 136. | Bird, J. F.、Bommer, J. J.(2004)。Earthquake losses due to ground failure。Engineering Geology,75,147-179。 | 137. | Bhattacharya, G.、Jana, D.、Ojha, S.、Chakraborty, S.(2003)。Direct search for minimum reliability index of earth slopes。Computers and Geotechnics,30,455-462。 | 138. | Andrus, R. D.、Stokoe, K. H.(2000)。Liquefaction Resistance of Soils from shear-wave velocity。Journal of Geotechnical and Geoenvironmental Engineering,126(11),1015-1025。 | 139. | 李雅芬、李德河、紀雲曜(20090300)。機率式邊坡穩定分析方法之研究。中國土木水利工程學刊,21(1),91-103。 延伸查詢 | 140. | 李崇正、溫惠鈺、熊大綱(20031200)。集集地震員林地區液化災損及復舊調查之研究。中國土木水利工程學刊,15(4),851-858。 延伸查詢 | 141. | 李雅芬、紀雲曜、李德河(20070300)。應用巢狀分割法求解二次矩可靠度指標之液化機率評估。中國土木水利工程學刊,19(1),1-11。 延伸查詢 | 142. | 李德河、古志生(20011200)。液化區CPT資料之探討。中國土木水利工程學刊,13(4),779-791。 延伸查詢 | 143. | 林炳森、李豐博、賴聖耀(19861000)。荷式錐貫入試驗與土壤動態性質關係。地工技術,16,51-62。 延伸查詢 | 144. | 林美聆、翁作新、廖洪鈞(19991200)。大地工程震災調查。國家地震工程研究中心簡訊,32,6-10。 延伸查詢 | 145. | 林國峰、王俊明、高士傑(20041000)。區域性設計雨型之建立及應用。國立臺灣大學工程學刊,92,1-9。 延伸查詢 | 146. | 紀雲曜、李雅芬、李德河(20060300)。土壤液化機率及危害度評估。中國土木水利工程學刊,18(1),1-12。 延伸查詢 | 147. | 紀雲曜、陳怡睿、上官百龍(20010100)。評估地盤液化潛能之新簡易模式。長榮學報,4(2),79-94。 延伸查詢 | 148. | 徐享崑、何智武(1992)。山地集水區雨型分布及暴雨延時統計分析。林業特刊,41,141-157。 延伸查詢 | 149. | 張益三、杜建宏(20011100)。山坡地水源保護區開發地價估算模式之研究。成功大學學報(人文.社會篇),36,1-31。 延伸查詢 | 150. | 許迪、丁昆侖、蔡林根(2003)。區域水土特性參數時空變異分布特徵及相關分析。中國水利水電科學研究院學報,1(1)。 延伸查詢 | 151. | 陳怡睿(19980600)。Experimental and Numerical Simulation of Soil Response Under Earthquake Loading for Uniform Sand Layer。長榮學報,2(1),47-62。 | 152. | 黃安斌、張嘉偉、何應璋、葉嘉鎮(19980600)。雲林麥寮粉土細砂之工程性質。地工技術,67,55-68。 延伸查詢 | 153. | 黃俊鴻、楊志文(20010600)。以集集地震案例資料建立土壤臨界液化強度曲線。中國土木水利工程學刊,13(2),339-352。 延伸查詢 | 154. | 葉弘德、韓洪元(19900900)。A Design Hyetograph for Taipei City。臺灣水利,38(3)=151,36-49。 延伸查詢 | 155. | 葉祥海、蔡克銓、謝舜傑(19990900)。集集地震建築物震害初步調查之成果。結構工程,14(3)=55,61-70。 延伸查詢 | 156. | 詹錢登、李明熹(20040900)。土石流發生降雨警戒模式。中華水土保持學報,35(3),275-285。 延伸查詢 | 157. | 褚炳麟、張益銘、陳冠閔、徐松圻、張錦銘(20000200)。921地震霧峰、太平地區液化及下陷調查分析。地工技術,77,19-28。 延伸查詢 | 158. | 蔡義本、黃明偉、趙曉玲(19991100)。1999年9月21日臺灣集集大地震的震源與強地動特性初步分析結果。土木水利,26(3),5-18。 延伸查詢 | 159. | 鄭錦桐、李錫堤、蔡義本(19981000)。利用地理資訊系統輔助地震危害度分析。地工技術,69,41-50。 延伸查詢 | 160. | 盧惠生(19971200)。蓮華池地區24小時降雨型態特性及設計雨型歷線。臺灣林業科學,12(4),481-489。 延伸查詢 | 161. | 賴聖耀(19890800)。荷式錐貫入試驗與液化可靠度之相關研究。土木水利,16(2),43-60。 延伸查詢 | 162. | 簡世杰、張睦雄、陳玠文、廖瑞堂、王熙松、蔡長利(20020800)。阿里山五彎仔地滑區滑動監測與邊坡穩定性之探討。臺灣公路工程,29(2),2-18。 延伸查詢 | 163. | 陳堯中、強國瑞(19890900)。不排水反復載重對粒狀土壤力學行為之影響。中國土木水利工程學刊,1(2),125-132。 延伸查詢 | 164. | 黃書禮(20020900)。生態系統理論在區域研究之應用。都市與計劃,29(2),187-215。 延伸查詢 | 165. | 施樂苑、Ólafsson, Sigurdur、Sun, Ning(1999)。New Parallel Randomized Algorithms for the Traveling Salesman Problem。Computers and Operations Research,26(4),371-394。 | 166. | Campbell, K. W.(1981)。Near Source Attenuation of Peak Horizontal Acceleration。Bulletin of the Seismological Society of America,71,2039-2070。 | 167. | Davis, R. O.、Berrill, J. B.(1982)。Energy Dissipation and Seismic Liquefaction in Sands。Earthquake Engineering and Structural Dynamics,10,59-68。 | 168. | Ishihara, K.、Acacio, A. A.、Towhata, I.(1993)。Liquefaction-induced Ground Damage in Dagupan City in the July 16, 1990 Luzon Earthquake。Soils and Foundations,33(1),133-154。 | 169. | Juang, C. H.、Chen, C. J.(2000)。A Rational Method for Development of Limit State for Liquefaction Evaluation Based on Shear Wave Velocity Measurements。International Journal for Numerical and Analytical Methods in Geomechanics,24,1-27。 | 170. | Juang, C. H.、Chen, C. J.、Jiang, T.、Andrus, R. D.(2000)。Risk-based Liquefaction Potential Evaluation Using Standard Penetration Tests。Canadinan Geotechnical Journal,37,1195-1208。 | 171. | Nasser, S. N.、Shokooh, A.(1979)。A Unified Approach to Densification and Liquefaction of Cohesionless Sand in Cyclic Shearing。Canadian Geotechnical Journal,16,659-678。 | 172. | Robertson, P. K.、Wride, C. E.(1998)。Evaluation Cyclic Liquefaction Potential Using the Cone Penetration Test。Canadian Geotechnical Journal,35,442-459。 | 173. | Ishihara, K.、Yoshimi, M.(1992)。Evaluation of Settlements in Sand Deposits Following Liquefaction During Earthquakes。Soils and Foundations,32(1),173-188。 | 174. | Steiner, F.(1983)。Resource Suitability: Methods for Analysis。Environmental Management,7(5),401-420。 | 175. | DeGroot, D. J.、Baecher, G. B.(1993)。Estimation autocovariance on in-situ soil properties。Journal of Geotechnical Engineering,119(1),147-166。 | 176. | Fenton, G. A.(1999)。Estimation for stochastic soil models。Journal of Geotechnical Engineering,125(6),470-485。 | 177. | Fenton, G. A.(1999)。Random field modeling of CPT data。Journal of Geotechnical Engineering,125(6),486-498。 | 178. | Fenton, G. A.、Vanmarcke, E. H.(1998)。Spatial variation in liquefaction risk。Geotechnique,48(6),819-831。 | 179. | Honjo, Y.、Kuroda, K.(1991)。A new look at fluctuating geotechnical data for reliability design。Soils and Foundations,31(1),110-120。 | 180. | Juang, C. H.、Fang, Y.、Li, L.(2005)。Reliability Analysis of Soil Liquefaction Potential。Geotechnical Special Publication,133。 | 181. | Juang, C. H.、Yang, S. H.、Yuan, H.、Khor, E. H.(2004)。Characterization of the uncertainty of the Robertson and Wride model for liquefaction potential。Soil Dynamics and Earthquake Engineering,24(9/10),771-780。 | 182. | Phoon, K.-K.、Kulhawy, F. H.(1999)。Characterization of geotechnical variability。Canadian Geotechnical Journal,36(4),612-624。 | 183. | Sivakumar Babu, G. L.、Mukesh, M. D.(2003)。Risk analysis of landslides: A case study。Geotechnical and geological engineering,21,113-127。 | 184. | Soulie, M.、Montes, P.、Silvestri, V.(1990)。Modelling spatial variability of soil parameters。Canada Geotechnical Journal,27,617-630。 | 會議論文1. | Ishihara, K.(1985)。Stability of natural deposits during earthquakes。11th international conference on soil mechanics and foundation engineering。Rotterdam:A. A. Balkema Publishers。321-376。 | 2. | Iwasaki, T.、Arakawa, T.、Tokida, K.(1982)。Simplified Procedures for Assessing Soil Liquefaction During Earthquakes。Soil Dynamics and Earthquake Engineering Conference。Southampton。925-939。 | 3. | 李雅芬、紀雲曜、李德河(2005)。區域沉積土層SPT-N值變異特性分析。The 11th Conference on Current Researches in Geotechnical Engineering in Taiwan。台北。 延伸查詢 | 4. | 李雅芬、紀雲曜、李德河(2004)。無限邊坡破壞之機率式評估。2004岩盤工程研討會。台北。368-375。 延伸查詢 | 5. | 紀雲曜、李雅芬、李德河(2004)。應用巢狀分割法於邊坡些楔型破壞機率之研究。2004全國災害危機處理學術研討會。台南。(6)74-(6)83。 延伸查詢 | 6. | Morgenstern, N.(1995)。Managing risk in geotechnical engineering。10th Pan-American Conference on Soil Mechanics and Foundation Engineering。Mexico City:Mexican Society of Soil Mechanics。102-126。 | 7. | 張元旭(1999)。台灣土地問題與政策之探討。21世紀不動產發展與管理研討會。台北。A1-A12。 延伸查詢 | 8. | 張益三、徐偉鈞、杜建宏(2002)。山坡地開發設施容受總量管制系統之研究。公共工程學術研討會。台南。11-91。 延伸查詢 | 9. | Youd, T. L.、Idriss, I. M.(1997)。Summary Report。The NCEER Workshop on Evaluation of Liquefaction Resistance of Soils,1-40。 | 10. | Youd, T. L.(1980)。Ground failure displacement and earthquake damage to buildings。Conf. on Civ. Engrg. and Nuc. Power。Knoxville, Tenn.:ASCE。 | 11. | Yamagamin, T.、Ueta, Y.(1998)。Search for noncircular slip surfaces by the Mogenstern-price method。6th International Conference of Numerical Methods in Geomechanics,1335-1340。 | 12. | Wu, J. H.、Tsai, P. H.、Liao, C. J.、Lin, H. M.(2006)。Applying empirical run-out distance formulas for the catastrophic landslide in Taiwan: Chiu-fen-erh-shan Landslide。International Symposium on Geohazards Mitigation。 | 13. | Wilson, R. C.(1997)。Normalizing rainfall/debris flow thresholds along U.S. Pacific coast for long-term variation in precipitation climate。The First International Conference on Debris-Flow Hazards Mitigation,32-43。 | 14. | Olsen, R. S.、Koester, J. P.(1995)。Prediction of Liquefaction resistance using the CPT。The International Symposium on Cone Penetration Testing。Linkoping。251-256。 | 15. | Olsen, R. S.(1998)。Cyclic liquefaction based on the cone penetrometer test。The 1996 NCEER Workshop on Evaluation of Liquefaction Resistance of Soil。 | 16. | Low, B. K.、Einstein, H. H.(1992)。Simplified reliability analysis for wedge mechanisms in rock slopes。The 6th International Symposium on Landslides,499-507。 | 17. | Keefer, D. K.(2005)。Earthquake-induced landslides from 1789 BC to 2005 AD。Salt Lake City annual meeting。Salt Lake。 | 18. | Miyakoshi, Junichi、Hayashi, Yasuhiro(2000)。Correlation of Building Damage with Indices of Seismic Ground Motion Intensity During the 1999 Chi-Chi, Taiwan Earthquake。International Workshop on Commemoration of Chi-Chi Earthquake。Taipei。 | 19. | Jamiolkowski, M.、Ladd, C. C.、Germaine, J. T.、Lancellotta, R.(1985)。New developments in field and laboratory testing of soils。9th International Conference Soil Mechanics。San Francisco。57-153。 | 20. | Cornell, C. A.(1969)。Structural Safety Specifications Based on Second-Moment Reliability Analysis。The IABSE Symposium on Concepts of Safety of Structures and Methods of Design。London。 | 21. | Bolt, B. A.(1969)。Duration of Strong Motion。The 4th World Conference on Earthquake Engineering。Santiago。1304-1315。 | 22. | Adachi, T.、Iwai, S.、Yasui, M.、Sato, Y.(1992)。Settlement and inclination of reinforced concrete buildings in Dagupan city due to liquefaction during the 1990 Philippine earthquake。The 10th world conference on earthquake engineering。 | 23. | 李咸亨、黃金華(2003)。機率式液化潛能分析與傳統式分析之比較。集集地震土壤液化總評估九十一學年度期末研究成果研討會,57-68。 延伸查詢 | 24. | 李建中(1985)。砂土液化與電阻之變化。第一屆大地工程研討會,65-78。 延伸查詢 | 25. | 李德河、古志生(2000)。CPT於新生地液化評估及地盤改良之應用。921集集大地震週年紀念學術研討會,413-436。 延伸查詢 | 26. | 李德河、古志生、張伸豪、王志成(2001)。液化後地盤下陷之研究。第九屆大地工程學術研討會。桃園石門。 延伸查詢 | 27. | 林金成、陳錦清(1993)。水平砂質地盤震後沉陷量之研究。第五屆大地工程學術研究討論會。福隆。77-84。 延伸查詢 | 28. | 林炳森、張啟文、林商裕、謝基政(2000)。南投地區土壤液化評估方法之研究。921集集大地震週年紀念學術研討會。台南。 延伸查詢 | 29. | 紀雲曜、李上妤、李雅芬、陳怡睿(2002)。地震特性與震害關係之初步研究。2002年第二屆全國災害危機處理學術研討會,(2)311-(2)324。 延伸查詢 | 30. | 紀雲曜、李雅芬、李德河(2006)。應用最小可靠度指標於邊坡滑動面之研究。2006岩盤工程研討會,289-298。 延伸查詢 | 31. | 張守陽、林國峰(1994)。台灣北部降雨特性雨時間分布之研究--以24小時延時為例。第七屆水利工程研討會,D115-D124。 延伸查詢 | 32. | 郭治平、張睦雄、陳玠文、許榕益(2001)。雲林地區土壤液化潛能評估及案例研析。第九屆大地工程研討會。桃園。 延伸查詢 | 33. | 陳俶季(1989)。以現場試驗數據和機率模式評估台灣地區土壤液化潛能。第三屆大地工程研討會,561-575。 延伸查詢 | 34. | 葉光毅、林玲芬、李泳龍、黃幹忠(2005)。軟性防災必要性的說明責任。2005年全國災害危機處理學術研討會。 延伸查詢 | 35. | 褚炳麟、徐松圻、張益銘、林成川(2002)。簡易經驗分析法在霧峰土壤液化案例研究之適用性。液化潛能評估方法及潛能圖之製作研討會。 延伸查詢 | 36. | 盧政男、翁佳薏、洪藍怡、古志生(2005)。新生地動態沉陷之初步探討。2005年全國土地管理與開發學術研討會。台南。 延伸查詢 | 37. | 李咸亨、吳志明、郭政彥(2001)。本土化液化評估方法之探討。2001年土壤液化評估在大地工程上之應用研討會,B1-B6。 延伸查詢 | 38. | 李德河、古志生、林宏明、田坤國、高清泉、林鋕鋒(1999)。地盤液化與沉陷。1999集集大地震災害調查研討會,D81-D101。 延伸查詢 | 39. | 紀雲曜、歐麗婷、陳怡睿(2003)。機率式液化潛能評估方法。集集地震土壤液化總評估91學年度期末研究成果研討會,123-156。 延伸查詢 | 40. | 倪勝火、賴宏源(2000)。常用液化評估法對921地震案例適用性探討。921集集大地震週年紀念學術研討會,233-270。 延伸查詢 | 41. | 張益三、李潔明、陳鴻明(2000)。由921地震經驗建立建物震害危險度評估模式及都市防災系統。921集集大地震週年紀念學術研討會,131-174。 延伸查詢 | 42. | Juang, C. H.、Tso, T. H.(1998)。Uncertainty propagation in CPT-based liquefaction resistance evaluation, Geotech。The First International Conference on Site Characterization。Rotterdam:Balkema。1087-1092。 | 43. | Phoon, K. K.(2006)。Characterization of uncertainties in geomaterials and geotechnical models。International Symposium on Geohazards Mitigation。 | 研究報告1. | 行政院經建會都市及住宅發展處(1985)。環境感地區土地規劃與管理之研究 (計畫編號:(74)465.303)。 延伸查詢 | 2. | 薛曙生(1996)。洪水災害保險制度可行性研究 (計畫編號:85EC2A043001)。 延伸查詢 | 3. | 台灣省水利局(1985)。曾文水庫操作運轉對下游流域影響之研究。 延伸查詢 | 4. | 台灣省水利局河川治理規劃團隊(1974)。曾文溪洪水頻率研究報告。 延伸查詢 | 5. | 林國峰、張守陽、蕭長庚(1994)。台灣地區雨型之研究。 延伸查詢 | 6. | 許銘熙、張倉榮、鄧慰先、黃成甲、葉森海(1998)。朴子溪、八掌溪、鹽水溪及二仁溪流域淹水潛勢分析。台北。 延伸查詢 | 7. | 鄭克聲、王如意、林國峰、許銘熙、虞興國、游保杉、李光敦(2000)。水文技術規範之研定。台灣大學生物環境系統工程學系。 延伸查詢 | 8. | 鄭克聲、林國峰、虞興國、李光敦、王如意、許銘熙、游保杉(2001)。水文設計應用手冊。台灣大學生物環境系統工程學系。 延伸查詢 | 9. | 黎明工程顧問股份有限公司(2006)。台14線88K至91K地滑地調查治理規劃工程成果報告。台北市:水土保持局第三工程所。 延伸查詢 | 學位論文1. | 陳玠文(2001)。大地監測系統運用於邊坡滑動機制之探討(碩士論文)。國立雲林科技大學。 延伸查詢 | 2. | 李上妤(2003)。以AHP/FI建構土地利用潛力評估方法之研究(碩士論文)。長榮大學。 延伸查詢 | 3. | 李雅芬(2007)。基於可靠度理論之土壤液化機率評估法之研究(博士論文)。國立成功大學。 延伸查詢 | 4. | 石棟鑫(2001)。台灣地區颱風雨降雨型態之分析研究(碩士論文)。國立中央大學。 延伸查詢 | 5. | 江基閔(2004)。阿里山五彎仔地滑區泥頁岩壓密回脹與潛變行為之初步探討(碩士論文)。國立雲林科技大學。 延伸查詢 | 6. | 余濬(1988)。降雨設計雨型之研究(碩士論文)。國立臺灣大學。 延伸查詢 | 7. | 吳國儒(1991)。堤防溢流風險分析(碩士論文)。國立成功大學。 延伸查詢 | 8. | 吳雲瑞(1999)。土石流潛勢分析及其在台南縣之應用(碩士論文)。國立成功大學。 延伸查詢 | 9. | 李雅芬(2001)。地震引致液化機率評估方法之研究(碩士論文)。長榮大學。 延伸查詢 | 10. | 杜俊明(1998)。河堤溢流風險之解析(碩士論文)。國立成功大學。 延伸查詢 | 11. | 林國忠(1997)。反負荷重作用下砂性土壤之變形行為研究(碩士論文)。國立成功大學。 延伸查詢 | 12. | 邱奕峰(2004)。阿里山五彎仔626坡滑事件機制之探討(碩士論文)。國立雲林科技大學。 延伸查詢 | 13. | 紀雲曜(1997)。高雄縣永安沿海地區沖積層下陷及其潛能評估方法之研究(博士論文)。國立成功大學。 延伸查詢 | 14. | 康富智(2007)。防洪系統溢堤風險分析模式之研究(碩士論文)。國立成功大學。 延伸查詢 | 15. | 陳建元(1995)。以模糊理論評估砂土之液化潛能(碩士論文)。國立成功大學。 延伸查詢 | 16. | 陳晉琪(2000)。土石流發生條件及發生機率之研究(博士論文)。國立成功大學。 延伸查詢 | 17. | 黃志元(1990)。壩堤洪水溢流之風險及不確定性分析(碩士論文)。國立成功大學。 延伸查詢 | 18. | 黃明萬(2001)。Kriging方法於地質圖製作之應用(碩士論文)。國立交通大學。 延伸查詢 | 19. | 黃翰林(1996)。河堤溢流之風險可靠度分析(碩士論文)。國立成功大學。 延伸查詢 | 20. | 簡世杰(2002)。阿里山五彎仔地滑區滑動機制與穩定性之研究(碩士論文)。國立雲林科技大學。 延伸查詢 | 21. | 吳杉珠(1996)。都市土地使用分區管制與地價相互關係之研究(博士論文)。國立政治大學。 延伸查詢 | 圖書1. | Seed, H. B.、Idriss, I. M.(1982)。Ground Motions and Soil Liquefaction During Earthquakes。Earthquake Engineering Research Institute。 | 2. | 潘國樑(1999)。山坡地永續利用。臺北市:詹氏書局。 延伸查詢 | 3. | Harr, M. E.(1987)。Reliability-Based Design in Civil Engineering。New York:McGraw-Hill。 | 4. | Bowles, Joseph E.(1988)。Foundation Analysis and Design。New York, NY:McGraw-Hall, Inc.。 | 5. | Ross, Timothy J.(1997)。Fuzzy logic with engineering applications。McGraw-Hill, Inc.。 | 6. | Kramer, S. L.(1996)。Geotechnical Earthquake Engineering。Prentice-Hall。 | 7. | Das, B. M.(1985)。Principles of Geotechnical Engineering。PWS Publishing Company。 | 8. | Dunham, C. W.(1962)。Foundations of Structures。New York:McGraw-Hill, Inc.。 | 9. | Satty, T. L.、Vargas, L. G.(1991)。Prediction, Projection and Forecasting--Applications of the Analytic Hierarchy Process in Economics, Finance, Politics, Games and Sports。Kluwer Academic Publishers。 | 10. | 中華水土保持學會(1982)。台北、桃園、新竹三縣山坡地保育利用區土地資源利用潛力及潛在自然災害調查與製圖。內政部營建署。 延伸查詢 | 11. | 池谷浩、山海堂、國科會土石流研究群(1980)。土石流災害調查法。 延伸查詢 | 12. | Walsh, G. R.(1975)。Methods of Optimization。John Wiley。 | 13. | McHarg, I. L.(1969)。Design with Nature。Garden City, New York:Doubleday & Company, Inc.。 | 14. | Hills, G. A.、Love, D. V.、Lacate, D. S.(1970)。Developing a Better Environment。Teronto, Ontario:Ontario Economic Council。 | 15. | 葉光毅(2003)。計畫方法論進階。新文京圖書公司。 延伸查詢 | 16. | 張徽正、林啟文、陳勉銘、盧詩丁(1998)。臺灣活動斷層概論--五十萬分之一臺灣活動斷層分佈圖說明書。經濟部中央地質調查所。 延伸查詢 | 17. | Lin, C. T.、Lee, C. S. George(1999)。Neural fuzzy systems: A neuro-fuzzy synergism to intelligent systems。Prentice Hall。 | 18. | 黃書禮(20000000)。生態土地使用規劃。臺北:詹氏。 延伸查詢 | 19. | 土木学会岩盤力学委員会(1999)。岩盤斜面の調査と対策。 延伸查詢 | 20. | 水谷武司(1993)。自然災害調査の基礎。東京:古今書院。 延伸查詢 | 21. | 台灣省水利局(1992)。台灣水文資料電腦檔應用之研究(11)全省各流域代表之無因次單位歷線推求。 延伸查詢 | 22. | 台灣省水利局(1975)。曾文溪現有堤防安全檢討及加高加強計畫報告。 延伸查詢 | 23. | 交通部中央氣象局(2001)。地震百問。交通部中央氣象局。 延伸查詢 | 24. | Tichy, M.(1993)。Applied methods of structural reliability。Boston。 | 25. | Spencer, A. J. M.、Parker, D. F.、Berry, D. S.、England, A. H.、Faulkner, T. R.、Green, W. A.、Holden, J. T.、Middleton, D.、Rogers, T. G.(1977)。Engineering mathematics。Van Nostrand Reinhold。 | 26. | Smith, S.、Tayman, J.、Swanson, D. A.(2001)。State and Local Population Projections: Methodology and Analysis。New York:Kluwer Academic Publishers。 | 27. | Pun, Lucas(1969)。Introduction to Optimization Practice。John Wiley。 | 28. | O'Rourke, T. D.、Hamada, M.(1992)。Case Studies of Liquefaction and Lifeline Performance During Past Earthquakes, Vol. 2, United States case studies。 | 29. | Japan Society of Civil Engineering(1999)。Site Investigation and Stabilization Methods of Rock Slopes。Tokyo。 | 30. | Hoek, E.、Bray, J.(1981)。Rock slope engineering。London:Transactions of the Institution of Mining and Metallurgy。 | 31. | Haward, A. D.、Remson, I.(1978)。Geology in Environmental Planning。New York:McGraw-Hill, Inc.。 | 32. | Goodman, R. E.(1989)。Introduce to rock mechanics。New York:Wiley。 | 33. | Gerald, C. F.、Wheatley, P. O.(1984)。Applied numerical analysis。Taipei publication trading。 | 34. | Finney, R. L.、Demana, F. D.、Waits, B. K.、Kennedy, D.(2000)。Calculus。Addison Wesley Longman。 | 35. | Ditlevson, O.(1981)。Uncertainty modeling。New York:McGraw-Hill。 | 36. | Baecher, G. B.、Christian, J. T.(2003)。Reliability and Statistics in Geotechnical Engineering。London:John Wiley and Sons。 | 37. | Ang, A. H.-S.、Tang, W. H.(1984)。Probability Concept in Engineering Planning and Design. Vol. II, Decision Risk and Reliability。John Wiley。 | 38. | Anderson, M. G.、Richards, K. S.(1987)。Slope stability-geotechnical engineering and geomorphology。John Wiley and Sons。 | 39. | 張紹勳、林秀娟(1995)。SPSS for Windows統計分析--初等統計與高等統計。台北:松崗電腦圖書公司。 延伸查詢 | 40. | 蕭慶章(2003)。實用河川工程(上冊)河川工程規劃。財團法人成大水利海洋研究發展基金會。 延伸查詢 | 41. | 謝謨文、蔡美峰(2005)。信息邊坡工程學的理論與實踐。北京:科學出版社。 延伸查詢 | 42. | Holland, J. H.(1975)。Adaptation in Natural and Artificial Systems: An Introductory Analysis with Application to Biology, Control, and Artificial Intelligence。MI:University of Michigan Press。 | 43. | Saaty, Thomas L.(1980)。The Analytic Hierarchy Process: Planning, Priority Setting, Resource Allocation。McGraw-Hill。 | 44. | Gutenberg, B.、Richter, C. F.(1954)。Seismicity of the Earth。Princeton University Press。 | 45. | Reiter, L.(1990)。Earthquake Hazard Analysis-issues and Insights。New York, NY:Columbia University Press。 | 46. | 經濟部中央地質調查所(1985)。臺灣坡地社區工程地質調查與探勘報告,第4卷,第4集:彰化地區。臺北:經濟部中央地質調查所。 延伸查詢 | 47. | Deutsch, C. V.、Journel, A. G.(1998)。GSLIB: Geostatistical software library and user's guide。New York:Oxford University Press。 | 48. | Kitanidis, P. K.(1997)。Introduction to geostatistics: applications to hydrogeology。New York:Cambridge University Press。 | 其他1. | 台南市政府(2001)。高速鐵路台南車站特定區計畫都市設計規劃案--期末設計規劃報告書。 延伸查詢 | 2. | Li, X. S.,Wang, Z. L.,Shen, C. K.(1992)。SUMDES, a nonlinear procedure for response analysis of horizontal-layer sites subjected to muti-directional earthquake loading,University of California, Davis。 | 3. | 大吉勝營造有限公司(2002)。台18線28K+900~31K+500五彎仔崩塌地委託鑽探工程鑽探報告。 延伸查詢 | 4. | 工業技術研究院能源資源研究所(1999)。台18線五彎仔崩塌地工程地質探查報告。 延伸查詢 | 5. | 台灣省水利局規劃總隊(1997)。河川治理規劃講義。 延伸查詢 | 6. | Rackwitz, R.(1976)。Practical Probablistic Approach to Design,Paris:Comité European du Beton。 | 7. | Ozgenoglu, A.,Ataman, T.,Pasamehmetoglu, G.,Arda, O.,Cagatay, N.,Bolokbasi, N.,Karpuz, C.,Guyaguler, T.,Bilgin, A.,Can, C.(1982)。Rock mechanics investigations for Sir ve Duzkesme Dam sites,Mining Engineering Department,Middke East Technical University。(81-04-025-00-04)。 | 8. | Hoek, E.(2000)。Practical rock engineering,http://www.rocscience.com/hoek/PracticalRockEngineering.asp。 | 9. | 亞新工程顧問股份有限公司(2000)。土壤液化評估與處理對策研擬第一期計畫(彰化縣員林鎮、大村鄉及社頭鄉)總報告,台北。 延伸查詢 | 10. | 高雄縣政府(2009)。莫拉克風災調查報告。 延伸查詢 | 11. | 經濟部水利處水利規劃試驗所(1994)。曾文溪水系治理規劃報告。 延伸查詢 | 12. | 經濟部水利署第六河川局(2004)。曾文溪本流(河口至曾文溪二橋)河川區域畫設水文分析報告。 延伸查詢 | 13. | 經濟部水利署第六河川局(2006)。曾文溪及支流菜寮溪大斷面測量計畫成果報告書。 延伸查詢 | 14. | 林炳森(2000)。921集集大地震南投市液化初步調查報告,國立中興大學土木工程系。 延伸查詢 | 圖書論文1. | McKay, M. D.(1988)。Sensitivity and Uncertainty Analysis Using a Statistical Sample of Input Values。Uncertainty Analysis。Boca Raton, FL:CRC Press, Inc.。 | 2. | Hamada, M.、O'Rourke, T. D.(1992)。Large ground deformations and their effects on lifelines: 1964 Niigata Earthquake。Case Studies of Liquefaction and Lifeline Performance during Past Earthquakes。 | |