題名:軌道工程主維修機廠土機界面管理探討
書刊名:管理資訊計算
作者:田圃翁在龍林世堂
作者(外文):Tien, PuWeng, Tsai-lungLin, Shih-tang
出版日期:2017
卷期:6:特刊2
頁次:頁113-124
主題關鍵詞:施工計畫界面管理界面查核Construction projectInterface managementInterface inspection
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(0) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:0
  • 共同引用共同引用:21
  • 點閱點閱:5
軌道工程主維修機廠維修設備眾多,工程預算及界面需求更為龐大,更維繫營運車輛與乘客之安全,維修設備界面複雜,實務上遇有界面問題時多以傳統經驗判斷解決,致使移交前產生重大改修而耗時耗財。本研究以興建中的個案,中捷G線對照北捷C線,在施工階段關鍵時程有無進行界面查核,以實例分析界面查核的優缺點。本研究同時針對實際參與界面管理技術人員進行問卷調查,包括對於執行界面管理探討,發包模式與界面的關係及界面查核機制的效果等提出問答,回收問卷以套裝軟體SPSS 17.0中文版進行統計分析。經研究分析獲得以下成果:1.經研究分析,於施工階段關鍵時程實施界面查核,對照未實施界面查核,單就移交會勘日程相差達2.9倍,缺失改修長達四個多月。2.問卷調查回收後經SPSS 17.0統計分析,施工階段查核功能可有效處理界面問題有93.6%。實行界面查核機制,不僅工程效率提昇,更可將界面衝突即早發現改善。
There are numerous facilities of track engineering maintenance in the main service factory, and these facilities maintain the safety of vehicles and passengers. Thus, the cost and interface requirements are very high. However, interfaces of maintenance facilities are complicated and engineers nowadays are used to solve the problem between interfaces depend on their own experience. Due to the reasons mentioned above, considerable modifications wasting time and funds occurs while handing-over projects. The purpose of this study was to assess the pros and cons of interface inspection by comparing the TMRT G-line, which interfaces are routinely inspected between key points in construction stage to early detect and correct problems with TRTC C-line as a control group. A questionnaire was adopted to collect the data, including the execution of interface inspection, association between contract mode and the intervention and, most of all, the effectiveness of interface inspection. SPSS 17.0 was used for analysis. The results revealed that executing interface inspection in construction stage leads to a 2.9-fold reduction in the cost of time. On the other hand, interface inspection helps manager to solve up to 93.6% of conflicts. The principle conclusion was that execution of interface inspection can not only increase the engineering efficiency but also increase early correction rate of the conflicts of interface.
期刊論文
1.郭良文、林素甘(20010600)。質化與量化研究方法之比較分析。資訊傳播與圖書館學,7(4),1-13。new window  延伸查詢new window
會議論文
1.戴培達(1999)。施工階段界面圖繪製整合。台灣營建研究院工程設計品保與介面圖說研討會。  延伸查詢new window
學位論文
1.林宗銘(2003)。捷運工程施工階段土機介面管理模式之研究(碩士論文)。國立臺灣科技大學。  延伸查詢new window
2.蕭富慈(2012)。營建工程介面管理模式及系統建置之研究(博士論文)。國立臺北科技大學。  延伸查詢new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top
:::
無相關著作
 
QR Code
QRCODE